Cadeler A/S, together with its subsidiaries, engages in offshore wind farm installation, operations, and maintenance services in Denmark. The company engages in the transportation, installation, and maintenance of offshore wind turbine generators and platform topsides/substations; maintenance of offshore structures and platforms; offshore construction, decommissioning, accommodation, and crane support within the renewable space; heavy lift and project cargo; and salvage assistance, as well as transport and installation of wind turbine foundations; and marine and engineering operations. It also owns and operates five offshore jack-up windfarm installation vessels. Cadeler A/S was incorporated in 2008 and is headquartered in Copenhagen, Denmark.
Q4 2025 is off to a flying start with record highs being printed left, right, and center. US and Japanese stocks made fresh new highs, while the gold price powered through $4,000 for the first time, and Bitcoin crossed the $126k level. Is this all a case of USD weakness, irrational exuberance, or solid fundamentals? This week, we are reviewing Q3 market performance, Q2 earnings season, and the outlook heading into the end of 2025…
Over the last 7 days, the market has remained flat, although notably the Information Technology sector gained 3.0% in that time. Unfortunately though, the market is down 37% over the past year. Looking forward, earnings are forecast to grow by 4.6% annually. Market details ›