Tillkännagivande • Jan 17
Graphano Energy Ltd. Completes Airborne Geophysical Survey At Black Pearl Graphano Energy Ltd. announced the successful completion of its airborne geophysics program totaling 473 kilometres over the Black Pearl property in Quebec. Preliminary interpretation confirms a dominant TDEM conductor extending over 1.2 kilometres, consistent with conductive trends previously outlined by ground geophysical surveys in the Black Pearl discovery area. Initial exploration drilling by Graphano in late 2025 within this area identified multiple near surface graphite zones which returned significant assays results (core widths) including 11.33% graphitic carbon (Cg) over 8.61 metres, 4.81% Cg over 12.25 metres, and 7.37% Cg over 4.70 metres. In addition, the airborne survey has identified numerous new priority conductive targets, expanding the overall target footprint on the property. A technical interpretation of the conductors location is currently underway, which will allow more detailed geological interpretation and EM targets ranking. A comprehensive geophysical report is expected to be finalized and delivered within approximately five weeks. The airborne geophysics program represents a critical step in refining the geological and structural understanding of the Black Pearl property and will directly support the planning of follow-up exploration activities, including additional groundwork and drilling programs. Tillkännagivande • Dec 04
Graphano Energy Ltd. announced that it has received CAD 0.375 million in funding On December 3, 2025, the Graphano Energy Ltd closed the transaction. In connection with the Private Placement, the Company paid aggregate cash finder’s fees of CAD 22,500.00 to an arm’s length finder. Tillkännagivande • Nov 12
Graphano Energy Ltd. announced that it expects to receive CAD 0.375 million in funding Graphano Energy Ltd. announces a non-brokered private placement to issue 2,500,00 units at a price of CAD 0.15 per unit for gross proceeds of CAD 375,000 on November 12, 2025. Each unit will consist of one common share of the company and one common share purchase warrant, whereby each warrant will entitle the holder thereof to acquire one additional share at an exercise price of CAD 0.25 for a period of 36 months from the date of issuance. The closing of the private placement is anticipated to occur on or about Dec. 10, 2025, subject to the satisfaction of certain conditions, including, but not limited to, the receipt of all necessary regulatory approvals, including acceptance of the TSX Venture Exchange. Tillkännagivande • Sep 06
Graphano Energy Ltd. announced that it has received CAD 0.3 million in funding On September 5, 2025, Graphano Energy Ltd. closed the transaction. The company announced that it has issued 2,000,000 units at a price of CAD 0.15 per Unit, for aggregate gross proceeds of CAD 300,000. Each Unit consists of one common share and one common share purchase warrant. Each Warrant entitles the holder to acquire one additional Share at a price of CAD 0.25 for a period of 36 months from the date of issuance. In connection with the Private Placement, the Company paid aggregate cash finder’s fees of CAD 18,000.00 to an arm’s length finder, representing 6% of the gross proceeds from the sale of Units placed by the finder, in accordance with applicable securities laws and the policies of the TSX Venture Exchange. Tillkännagivande • Aug 16
Graphano Energy Ltd. announced that it expects to receive CAD 0.3 million in funding Graphano Energy Ltd. is undertaking a non-brokered private placement financing consisting of up to 2,000,000 units at an issue price of CAD 0.15 per unit for gross proceeds of CAD 300,000 on August 15, 2025. ach unit will consist of one common and one common share purchase warrant, whereby each warrant will entitle the holder thereof to acquire one additional share at an exercise price of CAD 0.25 for a period of 36 months from the date of issuance. The closing of the private placement is anticipated to occur on or about August 29, 2025, subject to the satisfaction of certain conditions, including, but not limited to, the receipt of all necessary regulatory approvals, including acceptance of the TSX Venture Exchange. In connection with the private placement, the company may pay finders' fees in cash of up to 6.0 per cent of the aggregate gross proceeds of the offering. Tillkännagivande • May 30
Graphano Energy Ltd. Announces the Completion of the Current Phase of Exploration on the Black Pearl Graphite Property in Quebec, Canada Graphano Energy Ltd. announced the completion of the current phase of exploration on the Black Pearl graphite property in Quebec, Canada. The program has successfully advanced Black Pearl to drill-ready status and expanded its size potential. Current interpretations indicate a folded trend approximately 1.2 kilometres in length, containing multiple graphite related conductive zones over surface widths of up to 300 metres. The mineralized trend remains open to the north. Graphano's next step will be to conduct additional ground geophysical surveys to further delineate the potential of this significant discovery prior to first-phase drilling. The Black Pearl discovery was made by Graphano in 2024 through basic prospecting methods. Channel sampling from the initial discovery returned significant grades and thicknesses of graphite mineralization such as 15.1% Cg over 14 metres (m) and 17.9% Cg over 9 m. The geologic setting of this previously unexplored area is similar to the major graphite deposits of the Lac des Iles region. The current exploration program carried out by St-Pierre Exploration of Amos, Quebec, consisted of line cutting, ground electromagnetic surveys (Max-Min II and VLF-EM), prospecting and mechanical stripping of bedrock. To date, approximately 7 kilometres of line cutting and ground geophysics have been completed. Bedrock stripping during the current program has uncovered high grade graphite zones, ranging from 0.5 to 2.0 m in thickness, over an approximate strike length of 100 metres between L400N and L500N. Channel sampling results are currently pending for this mineralization. Tillkännagivande • May 13
Graphano Energy Ltd., Annual General Meeting, Jul 25, 2025 Graphano Energy Ltd., Annual General Meeting, Jul 25, 2025. Location: british columbia, north vancouver Canada Tillkännagivande • Apr 16
Graphano Energy Ltd. Receives Exploration Work Authorisations for All Québec Properties Graphano Energy Ltd. announced that it has received "Autorisation de Travaux à Impact", the authorization of impact-causing exploration work from the Ministère des Ressources naturelles et des Forêts for all its Québec-based properties: Lac Aux Bouleaux, Standard Mine, and Pearl Noir (Black Pearl). These ATI approvals encompass all designated exploration zones and newly identified discovery targets across the three properties, enabling the Company to proceed with its 2025 field programs. In May 2024, Québec introduced new exploration permitting requirements to enhance transparency and incorporate community feedback into mineral exploration activities. Under these regulations, mining companies must obtain ATI from the MRNF before conducting certain exploration activities that may impact the land, such as drilling, trenching, bulk sampling, and rock stripping. The ATI process involves (i) submitting detailed work plans, and (ii) engaging with local municipalities and Indigenous communities to gather and address their questions and comments. This collaborative approach aims to balance resource development with environmental stewardship and community interests. Graphano is preparing to commence its exploration campaigns this quarter, focusing on trenching, targeted sampling, and drilling to further delineate graphite mineralization across its holdings. The Company remains dedicated to conducting its operations responsibly, with ongoing engagement with local communities and stakeholders. Tillkännagivande • Jun 06
Graphano Energy Ltd. Starts Exploration Program at the New Claims in East Standard Graphano Energy Ltd. announced the start of the spring/summer exploration program on its 100% owned graphite properties in Quebec. The program, which commenced in mid-April, targets the newly staked claims situated immediately east of the Standard Mine and covering 3,923 hectares. Government reconnaissance in 1997 discovered four outcrops with visible graphite in this area, offering promising starting points for the Company's exploration. The new claims cover highly prospective geology located between Graphano's Standard Mine project and the Mousseau graphite deposit to the east. Additionally, Graphano will explore some of the remaining Lac Aux Bouleaux property zones, specifically Zones 5, 2 and 6, which have not been extensively examined. Tillkännagivande • Feb 04
Graphano Energy Ltd., Annual General Meeting, Apr 25, 2024 Graphano Energy Ltd., Annual General Meeting, Apr 25, 2024. Tillkännagivande • Jan 23
Graphano Announces Completion of Winter Drilling Program Graphano Energy Ltd. announced that the recent drilling program on its 100% owned Standard and Lac Aux Bouleaux (LAB) Graphite Properties in Quebec has been completed. The Company completed 30 drill holes totaling 3,025 metres during the recent program. At the Standard Mine 17 holes were drilled for a total of 1,991 metres and 13 holes were completed at LAB totaling 1,034 metres. The Company intends to develop both sites at the same time to feed a centralized beneficiation plant at LAB and is working towards a preliminary mineral resource estimation with Mercator Geological Services. Tillkännagivande • Nov 24
Graphano Energy Ltd. Commences Strategic Fall 2023 Drilling Initiative to Strengthen North American Graphite Supply Graphano Energy Ltd. announced that drilling activity is starting on its 100% owned Standard Mine and Lac Aux Bouleaux (LAB) Graphite Properties in Quebec. Forage Hebert Inc. of Amos, Quebec, has been awarded the drilling contract. In addition, Mercator Geological Services is responsible for the drill program design and St-Pierre Exploration Enr. for the field logistics of the program. The company plans to complete approximately 25 holes totaling up to 3,000 metres prior to year end. The drilling program will start at the Standard Mine Property, where the primary focus of the planned drilling is on resource expansion. Previous results at Standard Mine included: Trench TR23-25, returned 8.91% graphitic carbon (Cg) over 23m, including 12.09% Cg over 14 metres (m) and a second zone assaying 10.87% Cg over 6m; Drill Hole ST23-10 intersected 5.11% graphitic carbon (Cg) over 20.5m starting at 39.0m drilled depth, including 6.7% Cg over 9.0m at 41m; Drill Hole ST23-11 intersected 7.44% Cg over 13.0m at 31m; Drill Hole ST23-13 intersected 8.99% Cg over 11.3m at 4.2m, and 7.65% Cg over 13m at 56m; and Drill Hole ST23-05 intersected 5.79% Cg over 14.0m at 4.6m. At LAB, the focus will be on Zone 3, the historical pit area and, if time permits, Zone 1. Recent drilling at Zone 3 intersected significant graphite mineralization including: Drill hole LB22-33 intersected 6.26% Cg over 13.7m starting at 14.0m drilled depth, including 11.95% Cg over 4.7m at 14m; Drill hole LB22-45 intersected 9.09% Cg over 8.0m at 68m; and Drill hole LB22-52 intersected 7.17% Cg over 9.0m at 36m. Tillkännagivande • Jun 15
Graphano Energy Ltd. Reports 23 Metres Grading 8.91% Cg and Significantly Extends Zone with Trenching Program At the Standard Mine Project Graphano Energy Ltd. announced that all assay results from the 2023 spring trenching program at the historical Standard Mine Project have been received. Graphano owns a 100% interest in four graphite properties in the Lac-Aux-Bouleaux ("LAB") mine region - all are within trucking distance to allow for the Company's resource consolidation strategy to feed acentralized processing plant at LAB. The historical resource at LAB, the recently announced Zone 3 discovery at LAB and continued exciting results from the Standard Mine Project re-enforce the economic potential of this consolidation strategy. The spring trenching program at the Standard Mine Project has intersected very significant graphite mineralization and successfully extended the mineralized zone by more than a 225-metre length. Trenching and drilling completed to date have discovered three major zones of mineralization which have been tested from surface to a maximum vertical depth of approximately 60 metres locally and remain open in all directions for further expansion. The mineralized zones have an interpreted combined length of more than 1,300 metres. A total 111 channel samples and four grab samples were collected from nine separate trenches during the 2023 spring program. Each channel sample from the trenching work was 100 cm long, 5 cm wide and 3-5 cm deep cut in bedrock. All grab and channel samples were bagged and tagged using best practices and were delivered to Activation Laboratories ("ACTLABS"), Ancaster, Ontario, for sample preparation and analyses using laboratories' Code 4F-C Graphitic, analyzing C-Graphite (infrared) where the sample is subjected to a multistage furnace treatment to remove all forms of carbon with the exception of graphitic carbon; and C-Total (infrared). ACTLABS is an independent commercial, accredited ISO Certified Laboratory. Tillkännagivande • Feb 09
Graphano Drilling Results Show Great Potential for Zone 3 At Lab Graphite Project Graphano Energy Ltd. announced results of the exploration drilling of Zone 3 on its 100% owned Lac Aux Bouleaux Graphite (LAB) Property in Quebec. A total of 25 drill holes were completed for a total of 1,779 metres. Given that surface mineralization was previously exposed during Graphano's trenching program intermittently along the length of Zone 3, most holes were shallow (less than 60 m) to test the immediate depth and thickness of the graphite mineralization. Twenty-three holes were drilled to evaluate Zone 3 over a length of approximately 500 metres. One hole was drilled in Zone 8 and another one in Zone 4. Highlights of the drilling results are provided below. Very successful drill program with 15 of the 23 drill holes (65%) intersecting significant graphite mineralization over the 500 metre length of Zone 3 tested by this first phase of exploration drilling. The mineralization outlined remains open for continued expansion. Results include: Drill Hole LB22-33 intersected 6.26% graphitic carbon (Cg) over 13.7 meters (m) starting at 14.0; (m) drilled depth, including 11.95% Cg over 4.7 m at 14 m; Drill Hole LB22-45 intersected 9.09% Cg over 8.0 m at 68 m; Drill Hole LB22-52 intersected 7.17% Cg over 9.0 m at 36 m; Drill Hole LB22-39 intersected 4.72% Cg over 11.6 m at 36.4 m, including 6.56% Cg over 6.6 m at 36.4m; Drill Hole LB22-34 intersected 5.82% Cg over 9.0 m at 38.0 m, including 6.25% Cg over 3.50 m at 38 and 7.28% Cg over 4 m at 43 m; Drill Hole LB22-32 intersected 6.28% Cg over 8.0 m at 18.5 m; Drill Hole LB22-48 intersected 9.53% Cg over 5.0 m at 19.5 m. Only a single drill hole completed to date, LB22-54, which intersected 4.12% Cg over 6.0 m at 26 m drilled depth which indicates significant potential for this virtually unexplored target. Based on airborne EM results the Zone 8 target has an approximate 1000 metre length requiring further exploration. One method of evaluating and visually demonstrating the exploration significance of a drill program and thus the indicated economic potential is to calculate a drill hole's mineralized zone thickness multiplied by the zone's grade. The last column of the table on Figure 1 shows the thickness times metres values for LAB Zone 3 drill holes. The values greater than 25 (yellow highlight) are significant and those above 50 (red highlight) are very significant. The exploration drilling to date seems to suggest that the relatively high-grade LAB graphite horizons are locally folded and structurally thickened, which can enhance the potential for economic mineralization. This is similar to the Lac des Iles (LDI) deposit that has been mined for over 30 years and is located immediately adjacent to Graphano's LAB property. Zone 3 on the Property is one of the eight target areas identified from the 2015 airborne high-resolution magnetic (MAG) and time-domain electromagnetic (TDEM) survey completed on the LAB property. These targets were further explored through ground geophysical surveying and, prior to drilling, additional trenching and channeling sampling was performed to identify the best areas for drilling and orientation. The majority of drill holes completed on the Zone 3 target intersected near surface mineralized horizons ranging from 1.0 metres to 14 metres in thickness (core length) over a 500 m length, thus far by drilling. The graphite mineralization observed during the drilling is hosted within a sequence of marble, paragneiss and quartzites. All drill core samples were bagged and tagged using best practices and were delivered to Activation Laboratories, Ancaster, Ontario, for sample preparation and analyses using laboratories' Code 4F-C Graphitic, analyzing C-Graphite (infrared) where the sample is subjected to a multistage furnace treatment to remove all forms of carbon with the exception of graphitic carbon; and C-Total (infrared). ACTLABS is an independent commercial, accredited ISO Certified Laboratory. The core samples also include field duplicates and blanks for quality control and quality assurance (QA/QC) purposes.