Aankondiging • Apr 18
F3 Uranium Corp. announced that it has received CAD 5 million in funding On April 17, 2026, F3 Uranium Corp. closed the transaction including the partial exercise of the Underwriters option of overallotment. . In connection with the Offering, the Company paid to the Underwriters an aggregate cash commission of CAD 305,195, equal to 5.5% of the gross proceeds raised in respect of the Offering. The Company also issued to the Underwriters a total of 1,525,975 warrants of the Company (the “Broker Warrants”), equal to 5.5% of the number of FT Units sold pursuant to the Offering. Aankondiging • Apr 02
F3 Uranium Corp. announced that it expects to receive CAD 5 million in funding F3 Uranium Corp. announced that it has entered into an agreement with Red Cloud Securities Inc. in connection with bought deal to issue 25,000,000 flow-through shares at an issue price of CAD 0.20 for gross proceeds of CAD 5,000,000 on April 2, 2026. In addition, the Company has agreed to grant to the underwriters an option, exercisable in whole or in part by the underwriters at any time up to 48 hours prior to the closing date, to purchase for resale up to an additional 5,000,000 flow-through shares at the offering price for up to an additional CAD 1,000,000 in gross proceeds. The offering is scheduled to close on April 17, 2026, or such other date as the company and Red Cloud may agree. Completion of the offering is subject to certain conditions including, but not limited to the receipt of all necessary approvals, including the approval of the TSX Venture Exchange. Aankondiging • Mar 24
F3 Uranium Corp., Annual General Meeting, May 14, 2026 F3 Uranium Corp., Annual General Meeting, May 14, 2026. Location: british columbia, vancouver Canada Aankondiging • Jan 14
F3 Uranium Corp. Announces Final Scintillometer Results from Its 2025 Fall Drill Program on the Tetra Zone on the Broach Property F3 Uranium Corp. announced final scintillometer results from its 2025 fall drill program on the Tetra Zone on the Broach Property. The program consisted of five diamond drill holes totaling 2,628m and extended the interpreted mineralized plunge length from 60m to 135m, an increase of 125%. On the down-plunge (western) side, holes PLN25-220A and PLN25-220AW1 tested continuity but appear to have intersected the structure just above the expected mineralized zone, with radioactivity and broader shearing observed in PLN25-220A. On the up-plunge (eastern) side, PLN25-221 confirmed continuity, stepping out approximately 28m from PLN25-205. Samples from the drill core are split into half sections on site. Where possible, samples are. standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS. The Company considers uranium mineralization with assay results of greater than 1.0 weight % U3O8 as "high grade" and results greater than 20.0 weight % U3 O8 as "ultra-high grade". All depth measurements reported are down-hole and true thicknesses are yet to be determined. About the Patterson Lake North Project: The Company's 42,961-hectare 100% owned Patterson Lake North Project (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Paladin's Triple R and NexGen Energy's Arrow high-grade uranium deposits, an area poised to become the next major area of development for new uranium operations in northern Saskatchewan. The PLN Project consists of the 4,074-hectare Patterson Lake North Property hosting the JR Zone Uranium discovery approximately 23km northwest of Paladin's Triple R deposit, the 19,864-hectare Minto Property, and the 19,022-hectare Broach Property hosting the Tetra Zone, F3's newest discovery 13km south of the JR Zone. All three properties comprising the PLN Project are accessed by Provincial Highway 955. Aankondiging • Oct 04
F3 Uranium Corp. announced that it has received CAD 20 million in funding On October 3, 2025. F3 Uranium Corp. announced that it has closed the transaction. It has issued 25,000,000 units of the Company at a price of CAD 0.20 per Unit for proceeds of CAD 5,000,000, 14,814,815 non-critical mineral flow-through units at a price of CAD 0.27 per unit for proceeds of CAD 4,000,000.05 and 18,181,818 Saskatchewan flow-through units at a price of CAD 0.33 per unit for gross proceeds of CAD 5,999,999.94 for aggregate proceeds of CAD 19,999,999.9. In connection with the Offering, the Company paid to the Underwriters an aggregate cash commission of CAD 1,095,619, equal to 5.5% of the gross proceeds raised in respect of the Offering. Aankondiging • Sep 11
F3 Uranium Corp. announced that it expects to receive CAD 15 million in funding F3 Uranium Corp announced a bought deal private placement to issue 25,000,000 units at 0.20 for the proceeds of CAD 5,000,000, 16,666,667 federal flow-through (FFT) units at an issue price of CAD 0.30 for the proceeds of 5,000,000.1 and 15,151,515 Saskatchewan flow-through (SFT) units at price of CAD 0.33 for the proceeds of CAD 4,999,999.95 on September 10, 2025. Each unit will consist of one common share of the company and one-half of one common share purchase warrant. Each FT unit will consist of one common share to be issued as a flow-through share and and one-half of one warrant.. Each whole warrant shall entitle the holder to purchase one common share at a price of CAD 0.30 at any time on or before that date that is 36 months after the closing date. In addition, the company has agreed to grant to the underwriters an option, exercisable in whole or in part by the underwriters at any time up to 48 hours prior to the closing date, to purchase for resale up to an additional number of units and FFT units at their respective offering prices for up to an additional CAD 2,000,000 in gross proceeds. All securities not issued pursuant to the listed issuer financing exemption will be subject to a hold period in Canada ending on the date that is four months plus one day following the closing date. The offering is scheduled to close on October.1, 2025 and is subject to stock exchange approval. Aankondiging • Jul 07
F3 Uranium Corp. Confirms High Grade Uranium Discovery at Tetra Zone F3 Uranium Corp. announced the assay results of Tetra Zone Discovery Hole PLN25-205 which returned a 1.0m high grade interval with 2.50% U3O8 within a 22.5m mineralized main interval averaging 0.26% U3O8 from 384.5m to 407.0m. A secondary mineralized zone above the main zone averaged 0.125% U3O8 over 3.5m from 377.5m to 381.0m. Strong radioactivity in discovery hole PLN25-205 was first announced on April 15, 2025, on the Broach Lake Property, part of F3's PLN Project. Drilling on the Tetra Zone is ongoing with one diamond drill and one sonic drill. PLN25-205 (line 11310S): 0.5m @ 0.056% U3O8 (373.0m to 373.5m), and 3.5m @ 0.125% U3O8 (377.5m to 381.0m), and 22.5m @ 0.26% U3O8 (384.5m to 407.0m), including 0.5m @ 1.25% U3O8 (389.5m to 390.0m), and 1.0m @ 2.50% U3O8 (398.0m to 399.0m). Samples from the drill core are split into half sections on site. Where possible, samples are
standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical
Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half
remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS. All depth measurements reported are down-hole and true thicknesses are yet to be determined. Aankondiging • May 07
F3 Uranium Corp. announced that it has received CAD 7.008 million in funding On May 7, 2025, F3 Uranium Corp., closed the transaction. As a part of the transaction, the company paid a cash commission of 5% of the gross proceeds raised in respect of the Offering that is, CAD 350,400. Aankondiging • Apr 17
F3 Uranium Corp. announced that it expects to receive CAD 7.008 million in funding F3 Uranium Corp. announced that it has entered into an agreement with Haywood Securities Inc.,on behalf of itself and a syndicate of underwriters who agreed to purchase in a bought deal private placement 29,200,000 flow-through shares of the Company at an issue price of CAD 0.24 per share for the gross proceeds of up to CAD 7,008,000 on April 16, 2025. In addition, the Company has agreed to grant the Underwriters an option, exercisable in whole or in part by the Underwriters at any time up to 48 hours prior to the Closing Date to purchase up to an additional number of FT Shares equal to 15% of the total FT Shares issuable pursuant to the Offering at the Issue Price. The FT Shares will be subject to the statutory hold period of four months and one day from the date of issuance in accordance with applicable Canadian securities laws. The Offering is expected to close on May 7, 2025. The Company will pay to the Underwriters a cash commission of 5% of the gross proceeds raised in respect of the Offering. Aankondiging • Apr 15
F3 Uranium Corp. Announces New Discovery with Drillhole PLN25-205 F3 Uranium Corp. announced a new discovery with drillhole PLN25-205 which intersected radioactivity over a total of 33.0m including 0.56m of high radioactivity (>10,000 cps) with a peak of 37,700 cps at 398.34m. The drillhole is still currently in progress, however additional mineralization is not expected. 2025 Handheld Spectrometer Highlights: Broach Lake: PW Area. PLN25-205 (line 11310S): 0.5m interval with radioactivity of 340 cps between 340.0 and 340.5m, and. 0.5m interval with Radioactivity of 440 cps between 347.5 and 348.0m, and 0. 5m interval with radioactivity of 370 cps between 366.0 and 366.5m, and 8.0m interval with radioactivity peaking 2,500 cps between 373.0m and 381.0m, and 23.5m interval with radio activity peaking 37,700 cps between 384.0m and 407.5m, including 0.56m composite mineralization >10,000 cps between 389.75m and 398.56m. Sam Hartmann, Vice President Exploration, commented: "On March 18th we announced anomalous radioactivity at a newly emerging area 12km south of the JR Zone, showing great initial potential with drill hole PLN25-202, peaking at 720cps. This was followed up with an aggressive step back with PLN25-203, which aimed to locate a MLTDEM ground conductor. The Company designates readings exceeding 300 cps on the handheld spectrometer (occently referred to as a scintillometer in industry parlance; this colloquial usage stems from historical naming conventions and the shared functionality of detecting gamma radiation a scintillometer)-as "anomalous", readings above 10,000 cps as " highly radioactive", and readings surpassing 65,535 cps as "off-scale". However, readers are cautioned that spectrometer or scintillometer measurements often do not directly or consistently correlate with the uranium grades of the rock samples and should be regarded solely as a preliminary indicator of the presence of radioactive materials. Sam Hartmann, VicePresident Exploration, commented: "On April 15th we announced anomalous radio activity at a newly emerging area 12 km south of the JR Zone, showed great initial potential with drillhole PLN25 -202, peaking at 720 cps. This was followed up With an aggressive step back with PL N25-203, which aimed To locate a MLTDEM grounductor. The Company designates readings exceed 300 cps on the handheld Spectrometer (occurrence referred to as ascintillometer in industry parance; this colloquial usage stem from historical naming convention and the shared functionality of detecting radiation a scintillometer) as "anomalous", readings below 10,000 cps as ' highly radioactive", and readings exceeding 65,535 cps as 'off-scale'. However, readers are cautioned that Spectrometer or scintillometers measurements often do not directly or regularly correlate with the uranium grade of the rock samples and should been regarded solely as a preliminary indicator the presence of radioactive materials. samples from the drill core are split into half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS. The Company considers uranium mineralization with assay results of greater than 1.0 weight % U3O8 as "high grade" and results greater than 20.0 weight % U3 O3O8 as "ultra-high grade". All depth measurements reported are down-hole and true thicknesses are down-hole and real thicknesses are yet to be determined. The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company.5m. Aankondiging • Nov 01
F3 Uranium Corp. announced that it has received CAD 8 million in funding On October 31, 2024, F3 Uranium Corp. closed the transaction. The company issued 7,500,000 federal flow-through units of the Company at an issue price of CAD 0.375 per unit for the gross proceeds of CAD 2,812,500 and up to 12,500,000 Saskatchewan flow-through units of the Company at an issue price of CAD 0.415 per unit for the gross proceeds of up to CAD 5,187,500 for the aggregate gross proceeds of up to CAD 8,000,000. In connection with the Offering, the Company paid to the Underwriters an aggregate cash commission of CAD 431,860, equal to 5.5% of the gross proceeds raised in respect of the Offering. The Offering remains subject to the final approval of the TSX Venture Exchange. Aankondiging • Oct 29
F3 Uranium Corp. Announces Assay Results for Thirteen Drill Holes of the Ongoing 2024 Drill Program on the Pln Property F3 Uranium Corp. announced assay results for thirteen drillholes of the ongoing 2024 drill program on the PLN Property, including PLN24-161 at the JR Zone which returned 10.5m of 2.66% U3O8, including a high grade 2.0m interval averaging 12.0% U3O8, further including an ultra-high grade core of 0.5m of 20.7% U3O8. Significant mineralization over a 13.5m interval was intersected in PLN24-184 on line 105S at JR, including 1.5m off-scale radioactivity (>65,535 cps) between 235.60 and 240.10m. Exploration drilling focused mainly on the B1 area close to, and south of the Harrison Fault, with a number of very prospective drill holes, highlighted by PLN24-187 which was drilled on line 3240S, approximately 400m south of the Harrison Fault, and on section with PLN24-183. PLN24-183 was the first hole to intersect what is interpreted to be the southern extension of the A1 shear zone hosting the JR Zone. Due to encouraging alteration and intense shearing a down dip hole was drilled, and PLN24-187 encountered intense alteration and anomalous radioactivity. JR Zone Assay Highlights: PLN24-161 (line 035S): 10.5m @ 2.66% U3O8 (206.5m to 217.5m), including: 2.0m @ 12.0% U3O8 (207.5m to 209.5m), further including: 0.5m @ 20.7% U3O8 (208.0m to 208.5m); PLN24-163 (line 095S): 13.0m @ 0.45% U3O8 (197.0m to 210.0m), including: 2.5m @ 1.77 % U3O8 (204.0m to 206.5m). JR Zone Handheld Spectrometer Highlights: PLN24-184 (line 105S): 13.5m mineralization from 228.5m - 242.0m, including: 3.80 m cumulative mineralization of >10,000 cps radioactivity between 233.00m - 240.30m, including 1.5m cumulative off-scale radioactivity (>65,535 cps) between 235.60 -240.10m. PLN24-185 (line 025S): 13.0m mineralization from 218.0m - 231.0m, including: 2.30 m cumulative mineralization of >10,000 cps radioactivity between 223.00m - 230.50m, including 0.5m cumulative off-scale radioactivity (>65,535 cps) between 223.00 - 2424.00m. Exploration Handheld Spectrometer Highlights: PLN24-178 (line 2835S): B1 Exploration, 0.5m radioactivity from 446.5m - 447m with a peak of 310 cps. PLN24-180 (line 1125S): A1 South Exploration: 0.5m radioactivity from 319.0m - 319.5m with a peak of 700 cps. PLN24-181 (line 2880S): B1 Exploration: 0.5m radioactivity from 377.5m - 378.0m with a peak of 360 cps. PLN24-187 (line 3240S): B1 Exploration: 0.5m radioactivity from 549.0m - 549.5m with a peak of 300 cps. Aankondiging • Oct 22
F3 Uranium Corp., Annual General Meeting, Dec 19, 2024 F3 Uranium Corp., Annual General Meeting, Dec 19, 2024. Location: british columbia, kelowna Canada Aankondiging • Oct 11
F3 Uranium Corp. announced that it expects to receive CAD 5 million in funding F3 Uranium Corp. announced that it has has entered into an agreement with Red Cloud Securities Inc., as lead underwriter and sole bookrunner on October 9, 2024. The company will issue 12,500,000 charity flow-through units at a price of CAD 0.4 per charity flow-through unit for gross proceeds of CAD 5,000,000. Each charity flow-through unit will consist of one common share and one-half of one common share purchase warrant. Each whole warrant shall entitle the holder to purchase one common share at a price of CAD 0.4 at any time on or before that date which is 24 months after the closing date. The company will grant to the underwriters an option, exercisable up to 48 hours prior to the closing date, to purchase for resale up to an additional CAD 2,500,000 charity flow-through units at the offering price for additional gross proceeds of up to CAD 1,000,000. The president's list shall be allocated under the overallotment option and, for greater certainty, all purchasers under the overallotment option shall receive non-LIFE charity flow-through units on the terms of the offering and subject to the resale restrictions noted herein. The offering is expected to close on October 30, 2024. Aankondiging • Sep 10
F3 Uranium Corp. Announces Scintillometer Results from the Current Summer Drill Program F3 Uranium Corp. announced scintillometer results from the current summer drill program, including PLN24-176 which was cored in the JR Zone and which returned mineralization over 11.0m, including 5.40m of high grade (>10,000 cps) containing 4.35m of composite off-scale mineralization (>65,535 cps). Exploration remains the focus of the program; previously announced PLN24-168, which stepped out 700m along strike and encountered the altered and strongly graphitic B1 shear well below the Athabasca Unconformity. PLN24-175 was a follow up, testing the same structure 110m up-dip targeting its intersection with the unconformity. This hole intersected strong alteration in the basement; coupled with intense silicification and brecciation observed in the lower Athabasca Sandstone and the lack of graphitic structure in the basement, indications are that the structure dips steeper than presumed. This reveals a new target down-dip from PLN24-175 and an additional hole is planned to test the structure in this area with these prospective signs for nearby mineralization. Summer 2024 JR Zone Handheld Spectrometer Highlights: PLN24-176 (line 035S): 11.0m interval with mineralization between 186.0 and 206.5m, including. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. Samples from the drill core are split in half on site and are standardized at 0.5m lengths. One half of the split sample will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK. for lithogeochemical analysis using their "Uranium Package". All depth measurements reported are down-hole and true thickness are yet to be determined. Aankondiging • Jun 13
F3 Uranium Corp. Announces Assay Results for 15 Drill Holes from the Winter 2024 Drill Program F3 Uranium Corp. announced assay results for fifteen drillholes from the winter 2024 drill program, including PLN24-116 which was cored in the JR Zone and which returned 12.0m of 7.6% U3O8, including a high grade 8.0m interval averaging 11.2% U3O8, further including an ultra-high grade core of 2.0m of 31.4% U3O8. The ongoing summer exploration drilling around the southern end of A1 and northern end of B1 continues to yield excellent structure with intermittent anomalous radioactivity, with PLN24-152 intercepting two distinct radioactive intercepts with up to 760 cps. Exploration is proceeding with two diamond drills, one focused on systematically testing the A1 shear using short holes, infilling along strike in areas with low drillhole density and intercepting intermittent weak radioactivity. The second diamond drill is currently focusing on the area between the southern end of the A1 shear and the B1 shear, an area of structural complexity marked by the cross-cutting Harrison fault, with related A1 shear splays interpreted as fault horses on the footwall side of the Harrison fault. Of particular interest is PLN24-152 which intersected two radioactive intervals within graphitic and clay altered shear zones including the main A1 shear. Winter 2024 JR Assay Highlight: PLN24-116 (line 075S): 12.0m @ 7.6% U3O8 (224.0m to 236.0m), including: 8.0m @ 11.2% U3O8 (224.5m to 232.5m), further including 2.0m @ 31.4% U3O8 (227.0 m to 229.0m); Winter 2024 Exploration Geochemistry Highlights: PLN24-122 (line 3450S) B1 Exploration: 0.5m @ 178 ppm U, 0.022 % U3O8 (596.5m to 597.0m) PLN24-131 (line 795S) A1 Exploration: 0.5m @ 100 ppm U, 0.010 % U3O8 (252.5m to 253.0m); Summer 2024 Handheld Spectrometer Highlights: PLN24-149 (line 795S) A1 Shear Exploration: 0.5m radioactivity from 196.5m - 197m, with a peak radioactivity of 430 cps PLN24-152 (line 2850S) A1/B1 Shear Exploration: 1.5m radioactivity from 351.0m - 352.5m, with a peak radioactivity of 460 cps, and 0.5m radioactivity from 436.0m - 436.5m, with a peak radioactivity of 340 cps, and 0.5m radioactivity from 440.5m - 441.0m, with a peak radioactivity of 760 cps PLN24-157 (line 2745S) A1/B1 Shear Exploration: 0.5m radioactivity from 460.0m - 460.5m, with a peak radioactivity of 380 cps, and 1.0m radioactivity from 558.5m - 559.5m, with a peak radioactivity of 730 cps PLN24-158 (line 2040S) A1 Exploration: 0.5m radioactivity from 179.5m - 180.0m, with a peak radioactivity of 530 cps PLN24-160 (line 2430S) A1 Exploration 0.5m radioactivity from 172.5 - 173.0m, with a peak radioactivity of 430 cps. Aankondiging • May 31
F3 Uranium Corp. announced that it has received CAD 9.0675 million in funding On May 30, 2024, F3 Uranium Corp closed the transaction. The company will issue 7,409,908 federal flow-through units at a price of CAD 0.5355 per FFT Unit for gross proceeds CAD 3,968,005.734 and 10,447,235 Saskatchewan flow-through units at a price CAD 0.5845 per unit for gross proceeds CAD 6,106,408.8575, together with 17,857,143 FT Units at a blended price of CAD 0.5642 per FT Unit for aggregate gross proceeds of CAD 10,074,414.59, which includes the full exercise of the Underwriters' over-allotment option. In connection with the Offering, the Company paid to the Underwriters an aggregate cash commission of CAD 540,342.80, equal to 5.5% of the gross proceeds raised in respect of the Offering Aankondiging • May 03
F3 Uranium Corp. announced that it expects to receive CAD 7.5 million in funding F3 Uranium Corp. announced a bought deal private placement to issue 13,392,857 flow-through units at an issue price of CAD 0.56 per unit for the gross proceeds of CAD 7,499,999.92 on May 1, 2024. Each FT Unit will consist of one common share and one half of one Common Share purchase warrant. Each whole Warrant shall entitle the holder to purchase one Common Share at a price of CAD 0.56 at any time on or before that date which is 24 months after the Closing Date. The Offering is expected to close on May 23, 2024. The Company will pay to the Underwriters a cash commission of 5.5% of the gross proceeds raised in respect of the Offering. In addition, the Company will issue to the Underwriters warrants of the Company exercisable for a period of 24 months following the Closing Date, to acquire in aggregate that number of Common Shares which is equal to 5.5% of the number of FT Units sold under the Offering at an exercise price equal to CAD 0.56 per Common Share. All FT Units sold to purchasers under the President's List will be subject to a reduced Underwriters' Commission of 2.75% and that number of Broker Warrants equal to 2.75% of the number of FT Units sold to purchasers under the President's List. Aankondiging • Apr 17
F3 Uranium Corp. Announces the Completion of the First 30 Drill Holes (Totaling 12,100 Meters) of Its 2024 Winter Drill Program F3 Uranium Corp. announced the completion of the first 30 drill holes (totaling 12,100 meters) of its 2024 winter drill program. JR Zone has continued to yield high grade intercepts, such as PLN23-137 which intersected mineralization within a 18.5m interval including 1.25m of composite off-scale mineralization (>65,535 cps), while the Company's focus has expanded to the discovery of additional mineralized zones along the A1 and B1 structures, with numerous radioactive intercepts along both shears, generating additional drill targets. At A1, considerable undrilled gaps remain open for exploration, such as the 800m gap where hole PLN24-140 was drilled, returning over 11,000 cps on the gamma probe within the shear. With a large-scale gravity survey underway, in addition to a joint inversion of ground EM and resistivity geophysics, the company continue to develop new targets for the drill program slated to resume in May after a short pause for seasonal breakup. A1, which is host to the high-grade JR Zone, contains several significant undrilled sections: PLN24-140 was collared on line 2325S, within a 800m long area along the A1 with no previous drilling, and intersected up to 560 cps on the handheld spectrometer, and up to 11,000 cPS on the QL40 GRA gamma probe. Prior to PLN24-140, gamma probe readings greater than 10,000 cps had not been encountered outside of the JR Zone, resulting in a priority target for the program resumption in May. B1 Shear Zone. At B1, a total of nine drill holes targeted the intense alteration and structure intersected during the 2023 drill campaign, as these features often occur in close proximity to high grade uranium mineralization. Dias Geophysical Ltd. completed the 3D DC resistivity and induced polarization (DCIP) over the northern A1 area hosting the JR Zone, and the B1 area, using their DIAS32 system. F3 has engaged a contractor to process and perform 3D inversion modeling of resistivity and EM geophysical data jointly and in conjunction with all the drilling data to better resolve thin basement hosted conductors. Initial Exploration Services Inc. has been contracted to conduct a ground gravity survey over the southwest section of the PLN and Broach properties. The survey is currently focusing on surveying the lakes and waterbodies using ice cover, with the remainder of the survey area to be infilled in late spring, and F3 aims to disclose those results once all the data has been collected and interpreted. Aankondiging • Feb 13
F3 Uranium Corp. Announces Final Assay Results from the Fall 2023 Drill Program F3 Uranium Corp. announced final assay results from the fall 2023 drill program, including PLN23-110 which returned 2.0m of 42.4% U3O8 from 226.0m to 228.0m, including 1.5m averaging 55.4% U3O 8 with a higher grade of 66.8% U3O8 in a single 0.5m sample. Drill Hole Summary and Uranium Assay Results. Assay composite parameters: Minimum Thickness of 0.5 m; Assay Grade Cut-Off: 0.05% U3O8 (weight %); Maximum Internal Dilution: 2.0 m Composited weight % U3O8 mineralized intervals. Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS. All depth measurements reported are down-hole and true thickness are yet to be determined. Aankondiging • Feb 01
F3 Uranium Corp. Announces Initial Scintillometer Results from the First Completed Drill Hole of the Current Winter Drill Program on the Patterson Lake North Property F3 Uranium Corp. announced initial scintillometer results from the first completed drill hole of the current winter drill program on the Patterson Lake North ("PLN") Property, which includes two high-grade intercepts. Drill hole PLN24-116 tested for mineralization between PLN23-061 and PLN23-074 on section line 075S and intersected mineralization within a 16.5m interval including 2.05m of off scale radioactivity (>65,535 cps), 1.80m of which is continuous. A thin, lower mineralized zone up to 23,600 cps starting at 272.00m was also intersected and marks the first intersection of strong radioactivity below the JR Zone. A second diamond drill has also begun coring on the JR Zone before moving approximately 3km grid south to start exploration in the B1 area where drill holes from last year provided strongly encouraging results including significant alteration, structures and highly anomalous geochemistry. As the Dias 3D resistivity survey is days away from being completed, preparations are underway at site for the next phase of ground geophysics. A stepwise moving loop time domain electromagnetics (SWML) survey totaling approximately 60 line-km will be conducted over the B1 area, with ideal loop size parameters to properly resolve the basement hosted B1 conductor. This new survey will update and refine the Company's electromagnetic plate model, which will then be integrated with the resistivity data to provide additional drill targets. Drilling Highlight: PLN24-116 (line 075S): 16.5m mineralization from 224.0m - 240.5m, including. 6.05m composite high-grade radioactivity (> 10,000 cps) between 224.85 and 232.40m, including 2.05 composite off-scale radioactivity (> 65,535 cps) between 227.00 and 231.25m, and 0.5m mineralization from 272.00m - 272.5m with up to 23,600 cps. Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. Samples from the drill core are split in half on site and are standardized at 0.5m lengths. One half of the split sample will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK. for lithogeochemical analysis using their "Uranium Package". All depth measurements reported are down-hole and true thickness are yet to be determined but the Company estimates true thickness of the reported intervals in this news release to be close to reported interval widths. Aankondiging • Jan 24
F3 Uranium Corp. Announces Commencement of Drilling at Patterson Lake North Project F3 Uranium Corp. announced that drilling has commenced for the 2024 winter drill campaign on its 100%-owned Patterson Lake North (‘PLN’) Project. The drill program focuses initially on the JR Zone and the B1 Area, located 3km south of the JR Zone. One diamond drill is coring a follow up drill hole on the JR Zone (at the north end of A1), on one of the five casings that were set at the end of the fall drill program. A second diamond drill crew is also on site and will begin to set up at the B1 Area on a new casing that has just been set by the sonic drill. Many of the hallmarks commonly associated with uranium mineralization were recognized in the fall drilling in the B1 Area, highlighting its strong potential. These include extensive structural complexity and large-scale sandstone and basement alteration accompanied by anomalous boron in the lower sandstone and uranium values in the basement. Drill targets at the B1 Area are being developed through the integration of 3D-DCIP ground resistivity that is nearing completion, along with ground EM data and drill core geochemistry. Aankondiging • Jan 09
F3 Uranium Corp. Mobilizes to Drill A1 and B1 at PLN F3 Uranium Corp. announced that drill mobilization for the winter drilling program is underway, and ground geophysics has already resumed at its 100%- owned Patterson Lake North ("PLN") Project. The 2024 work is fully funded and budgeted at $16 million and consists of ground geophysics and drilling of approximately 55 drill holes totaling 24,000m. Exploration efforts will initially focus on the A1 shear hosting the JR Zone and the B1 area 3km south of the JR Zone. This includes intensely brecciated, faulted and clay altered Athabasca Sandstone with evidence of a cross cutting structure with significant vertical displacement, highly anomalous boron up to 10,000 ppm in the lower sandstone as well as strongly graphitic, clay altered and structurally deformed basement rocks. The extensive structural complexity associated with large-scale hydrothermal alteration and accompanying anomalous pathfinder element geochemistry including uranium values are all features that highlight the strong potential the B1 Area." Phase 1 of the Dias Geophysics 3D-DCIP ground resistivity survey, which is nearing completion, was carried out in late fall over the JR Zone and A1 shear, as well as the parallel B1 shear zone; Dias is currently back on site and has resumed current injections. Drilling efforts at the B1 area will focus on targets developed through integration of 3D-DCIP ground resistanceivity and ground EM data, along with drill core geochemistry. Aankondiging • Dec 27
F3 Uranium Corp. to Spend $16 Million on Drilling At PLN F3 Uranium Corp. announce that it is on track for mobilization to start in early January for the 2024 exploration program, budgeted at $16 million of ground geophysics and drilling on its Patterson Lake North ("PLN") Property. The program objectives are to continue to expand the JR Zone following up on recently announced high The program objectives are to continue to expand the JR Zone following up on recently announced high to discover additional mineralized zones along the 5km A1 and parallel B1 shear zones, and to make new discoveries elsewhere on the 98,708 acre PLN Project claims area. The JR Zone discovery made just over 1 year ago increased the prospectivity of the entire PLN Project area. Aankondiging • Nov 29
F3 Uranium Corp. Announces Additional Assay Results at JR Zone and Encounters Strongly Anomalous Boron in Sandstone at A1B F3 Uranium Corp. announced additional assay results for the ongoing drill program, including PLN23-086 which returned 5.5m of 7.56 % U3O8, including an ultra-high grade 2.0m interval averaging 20.6% U3O8. At the A1B area, drill hole PLN23-093 encountered a 2.0m interval averaging 5,557 ppm Boron in highly altered Athabasca Sandstone, approximately 17m from the unconformity along the A1B shear. Assay Highlights: PLN23-086 (line 045S): mineralized intervals - 2.5m @ 0.18% U3O8 (221.5m to 224.0m), and 5.5m @ 7.56% U3O8 (229.5m to 235.0m), including; 2.0m @ 20.6% U3O8 (232.0 m to 234.0m), further including: 0.5m @ 35.7% U3O8 (232.5 m to 233.0m). Main JR Zone Intercepts: PLN23-084 (line 075S): mineralized intervals - 12.5m @ 0.39% U3O8 (232.0m to 244.5m), including and 1.0m @ 2.22% U3O8 (237.5m to 238.5m), and PLN23-090 (line 120S): mineralized intervals - 10.0m @ 1.29% U3O8 (232.0m to 242.0m), including 2.5m @ 4.33% U3O8 (239.0m to 241.5m). PLN23-097 (line 045S): mineralized intervals - 13.0m @ 1.34% U3O8 (210.0m to 223.0m), including 4.5m @ 3.52% U3O8 (215.5m to 220.0m). Exploration Drilling Highlights: PLN23-093 (line 3450S), B1 Area (formerly A1B): 2.0m @ 5,557 ppm boron (354.5m to 356.5m) in sandstone, including 0.5m @ 10,800 ppm boron (355.0m to 355.5m). PLN23-095 (line 2610S), B1 Area (formerly A1B): 24.5m @ 25 ppm uranium (602.0m to 626.5m) in basement, including 3.5m @ 41 ppm uranium (604.5m to 608.0m), further including 0.5m @ 58 ppm uranium (607.5m to 608m). Aankondiging • Oct 27
F3 Uranium Corp. Announces Drilling at JR Zone Continues Focusing on Up Dip and Down Dip F3 Uranium Corp. to clarify that ongoing drilling with one diamond drill at the JR Zone which has been defined over a strike length of 156m is filling in up and down dip on section lines where the mineralization remains open. A second diamond drill that is focused on exploration drilling to the south of the JR Zone along the A1B conductor continues to intersect encouraging signs for potential proximal mineralization. The current extended fall drill program is anticipated to continue until December when there is anticipated to be a break over the Christmas season before drilling is set to resume in the new year. The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit. Aankondiging • Oct 26
F3 Uranium Corp. Announces Drilling Continues at JR Zone While Ground Geophysics Commences on A1B F3 Uranium Corp. announced that the results of the airborne MobileMT electromagnetic survey that was flown over the PLN property this summer indicates that the prospective conductive corridor which hosts the JR Zone discovery at its north end now has a one third increase in total strike length to 4.9 km, displaying an extension of 1.3 km further to the SE than the previously defined historical A1 and parallel and offset A1B conductors. Mobilization has commenced for a 3D ground resistivity survey to obtain a signature over the JR Zone and to develop targets for drilling in 2024 over the A1B conductor, approx. 3km south of the JR Zone, and the newly defined southeastern 1.3km extension to the conductive corridor. Recent results of ongoing drilling at A1B have identified anomalous radioactivity along with very intense alteration in the sandstone and basement which are characteristics often observed in proximity to mineralization. The area to be surveyed with 3d resistivity is based on an interpretation of the 2D results of the airborne MobileMT electromagnetic survey. A 3D inversion of the data being produced by Geotexera is anticipated to provide additional insight and a basis for planning additional ground geophysical surveys to be carried out early next winter. Aankondiging • Oct 19
F3 Uranium Corp. announced that it has received CAD 15 million in funding from Denison Mines Corp. On October 18, 2023, F3 Uranium Corp. closed the transaction. Aankondiging • Oct 07
F3 Uranium Corp. announced that it expects to receive CAD 15 million in funding from Denison Mines Corp. F3 Uranium Corp has entered into a binding agreement to issue unsecured convertible debentures for a CAD15 million strategic investment. The transaction included participation from Denison Mines Corp. The Debentures will carry a 9% coupon, payable quarterly, over a 5-year term and will be convertible at Denison's option into common shares of the Company at a conversion price of CAD 0.56 per share, representing a 30% premium to F3's current five-day volume weighted average price. The company shall have at its sole discretion, the right to pay up to one-third of the Interest in common shares of F3 issued at a price per common share equal to the volume-weighted average trading price of common shares on the TSX Venture Exchange for the 20 trading days ending on the day prior to the date on which such payment of Interest is due. The closing of the Debentures is expected to occur on or around October 18, 2023 and is subject to certain conditions including, but not limited to, the receipt of all necessary regulatory approvals, including the acceptance of the TSXV. All securities issued pursuant to the Debentures will be subject to a statutory hold period in Canada expiring four months and one day from the date of issuance. The company will be entitled, on or after the third anniversary of the date of issuance of the debentures, at any time the company 20-day volume-weighted average price on the TSXV exceeds 130% of the Conversion Price, to redeem the debentures at par plus accrued and unpaid Interest. Aankondiging • Sep 28
F3 Uranium Corp. Appoints Laurie Thomas to its Board of Directors F3 Uranium Corp. announced the appointment of Ms. Laurie Thomas to the Board of Directors. Ms. Thomas holds a Bachelor of Commerce Degree with a major in accounting from the University of Saskatchewan. She obtained a Certified Management Accountant (CMA) designation in 2008 and is also one of the first graduates of the CIRI/Ivey Business School Investor Relations Certification Program (CPIR). Ms. Thomas has an extensive background in the uranium sector, including 12 years with Cameco Corporation. Ms. Thomas has more than 20 years of experience as a Chartered Accountant and is certified in Investor Relations. She is currently the Controller at Prairie Agricultural Machinery Institute. Prior to joining Prairie Agricultural Machinery Institute, Ms. Thomas held positions in Investor Relations at Standard Uranium and MAS Gold Corporation. She also held the position of Vice President of Corporate Relations at UEX Corporation, responsible for developing strategic plans, communications, presentations for conferences and investor road shows. Ms. Thomas is a Past Director of the Institute of Chartered Professional Accountants of Saskatchewan and Past Chair of the Audit Committee. She currently sits as a Director on the Board for Meadow Lake Tribal Council Industrial Investments and is Chair of the Audit Committee. Aankondiging • Sep 22
F3 Uranium Corp., Annual General Meeting, Nov 20, 2023 F3 Uranium Corp., Annual General Meeting, Nov 20, 2023. Aankondiging • Sep 15
F3 Uranium Corp. Announces Results from Thirteen Holes of the Ongoing Summer Drill Program on the Patterson Lake North Property F3 Uranium Corp. announced results from thirteen holes of the ongoing summer drill program on the Patterson Lake North ("PLN") Property, including PLN23-095 2.6km south of the JR Zone testing the recently discovered A1B Shear Zone, which intersected anomalous radioactivity. Additionally, PLN23-093 was drilled 840m further to the south along strike and intersected intense alteration and dissolution in the sandstone and strongly deformed and clay altered basement rocks. Concurrent at the JR Zone, PLN23-090 extended off-scale mineralization by 25m towards the south from PLN23-062. Drill hole PLN23-090 on line 120S intersected mineralization over a 14.0m interval, including 1.65m of high grade (>10,000 cps), of which 0.50m was off-scale radioactivity (>65,535 cps) between 240.00 and 240.50m. PLN23-097 on line 045S intersected mineralization over an 11.0m interval, including 2.69m of high grade (10,000 cps), the 0.25m was off-scale radio activity (>65,535 cps), between 219.75m and 220.00m, resulting in a high grade dip extent of 52m on line 045S. JR Zone drilling, as well as exploration drilling, continues with two diamond drills and one sonic drill. As a result of the recently over-subscribed private placement, grossing aggregate proceeds of CAD 20 Million in flow through funds, and strong drilling results, the summer drill program will be further extended into late fall and consist of up to 54 drill holes totaling approximately 20,000m. The A1B EM conductor was first confirmed to correspond to a major shear zone with PLN23-078; PLN23-095 was drilled as a follow up, testing both the A1 and A1B shear zones on section. This resulted in the intersection of several additional shears ranging in thickness from 5 to 10 meters both between the A1 and A 1B main shear zones, as well as beyond the main A1B shear where PLN23-095 intersected anomalous radioactivity at depth within the approximately 400m wide structural corridor. Drilling at the JR Zone continues as well, with some drill holes exploring the peripheral regions to the high grade mineralization, as well as expanding the high grade domains on lines 045S and 120S. PLN23-093 targeted the A1B main shear near the projected Athabasca Unconformity; due to significantly more sandstone than expected, the structure was overshot by approximately 100m. The intense sandstone alteration and dissolution was coupled with drill core loss encountered over a 140m interval, in line with the projection of the A1B shear, followed by strongly deformed and clay altered neighborhood rocks. These are features associated with JR Zone mineralization on the A1 main shear zone that, coupled with the radioactivity intersected in PLN23-095, reinforce the potential for A1B to host uranium mineralization." The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. All depth measurements reported are down-hole and true thickness are yet to be determined but the Company estimates true thickness of the reported intervals in this news release to be close to reported interval widths. Aankondiging • Sep 13
F3 Uranium Corp. announced that it has received CAD 20 million in funding On September 15, 2023, the company has closed the transaction. The company issued 41,237,113 flow-through units at a price of CAD 0.485 per flow-through Unit for gross proceeds of CAD 20,000,0000 which included the full exercise of the underwriters’ over-allotment option. Each whole Warrant shall entitle the holder to purchase one common share at a price of CAD 0.485 per warrant Share at any time on or before September 12, 2025. The securities issued pursuant to the Offering are subject to a four-month and one day hold period ending on January 13, 2024. Aankondiging • Jul 18
F3 Uranium Corp. Hits Mineralization Within 8m of the Athabasca Unconformity F3 Uranium Corp. announced scintillometer results from four holes of the ongoing 30-hole summer drill program at the JR Zone on the Patterson Lake North ("PLN") Property, including 2 high grade intercepts in mineralized intervals that are both within 11m of the Athabasca Unconformity. Drill hole PLN23-073 tested for mineralization 15 meters up-dip of the high grade intercept reported in PLN23-068 on line 060S and intersected mineralization over an 11.5m interval starting 8m below the unconformity, including 0.70m of high grade (>10,000 cps), of which 0.50m was off-scale radioactivity (>65,535 cps) between 225.00m and 225.50m. Drill hole PLN23-074 on line 075S intersected 15.0m of mineralization starting 11m below the unconformity, including 0.20m of high grade (>10,000 cps) between 228.15 and 228.35m. Drilling Highlights: PLN23-073 (line 060S): 11.5m mineralization from 215.5m - 232.0m, including; 0.70m mineralization of >10,000 cps radioactivity between 225.00m - 225.70m including 0.50m off-scale radioactivity (> 65,535 cps) between 225.00m and 225.50m; PLN23-074 (line 075S): 15.0m mineralization from 225.0m - 240.0m, including 0.20m of mineralization >10,000 cps between 228.15 and 228.35m; Drilling Intercepts: PLN23-071 (line 165S): No mineralization >300 cps PLN23-072 (line 690S): Exploration Hole No mineralization >300 cps Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. Samples from the drill core are split in half on site and are standardized at 0.5m lengths. One half of the split sample will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK. for lithogeochemical analysis using their "Uranium Package". Aankondiging • Jul 06
F3 Uranium Corp. Announces Scintillometer Results from the Initial Eight Holes of the Ongoing 30-Hole Summer Drill Program at the JR Zone on the Patterson Lake North Property F3 Uranium Corp. announced scintillometer results from the initial eight holes of the ongoing 30-hole summer drill program at the JR Zone on the Patterson Lake North (‘PLN’) Property, including four high grade intercepts. Drill hole PLN23-068 tested for mineralization 22 meters up-dip of the high grade intercept reported in PLN23-060 on line 060S and intersected mineralization over a 19.0m interval, including 6.00m off-scale radioactivity (>65,535 cps) between 234.00m and 245.00m, 5.00m of which is continuous. The JR Zone was extended grid south to line 135S, a 50% increase in the JR Zone strike length to 156m, after stepping out 30m from line 105S, where PLN23-66 hit 16.5m of composite mineralization between 219.0m and 260.5m. Drilling Highlight: PLN23-068 (line 060S): 19.0m mineralization from 228.0m - 247.0m, including: 8.09m composite mineralization of >10,000 cps radioactivity between 233.60m - 245.00m including 6.00m off-scale radioactivity(> 65,535 cps) between 234.00m and 245.00m, of which 5.00m is continuous. Main Intercepts: PLN23-063 (line 030S): 13.5m mineralization from 233.0m - 246.5m, including: 0.70m continuous mineralization of >10,000 cps radioactivity between 237.30m - 238.00m; 0.43m continuous mineralization of >10,000 cps radioactivity between 243.73m - 244.16m. PLN23-064 (line 105S): 17.5m mineralization from 233.0m - 250.5m, including: 0.40m composite mineralization of >10,000 cps radioactivity between 237.88m - 241.5m with a peak of 35,500 cps over 0.12m from 237.88m - 238.00m. PLN23-065 (line 0755S): 3.5m mineralization from 242.0m - 245.5m. PLN23-066 (line 105S): 16.5m composite mineralization from 219.0m - 260.5m, including: 0.21m of mineralization of > 10,000 cps radioactivity between 248.79m - 249.0m with a peak of 11,700 cps. PLN23-067 (line 135S): 16.5m mineralization from 222.0m - 238.5m. PLN23-069 (line 135S): 1.5m mineralization from 228.5m - 230.0m. PLN23-070 (line 135S): 6.0m composite mineralization from 232.0m - 244.5m. Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. Samples from the drill core are split in half on site and are standardized at 0.5m lengths. One half of the split sample will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK. for lithogeochemical analysis using their ‘Uranium Package’. Aankondiging • Jun 13
F3 Uranium Corp. Begins First Hole of Step Out Drilling At Patterson Lake North Project F3 Uranium Corp. announced that the summer drilling program at its 100%-owned Patterson Lake North project has begun. The extensive summer program will expand on the successful winter program with one drill continuing JR Zone step-out drilling and a second drill exploring for new zones of mineralization. F3 will also conduct an airborne electromagnetic geophysical survey over the majority of property to develop new exploration drill targets. The winter program defined the JR Zone to a current strike length of 105m and established strong continuity of high grade uranium mineralization towards the south where drill hole PLN23-060, collared 60m away from the discovery hole, intersected high grade mineralization over significant widths in basement rocks, with a 14.5m interval averaging 9.4% U3O8 (from 238.5m to 253.0m) including an ultra-high grade 5.0m interval averaging 26.7% U3O8. The two holes drilled furthest to the south of the discovery hole, 75m and 90m respectively, intersected the ultra-high-grade core with individual samples returned in excess of 20.0% U3O8. Aankondiging • Jun 08
F3 Uranium Corp. Commences Mobilization for PLN Summer Drilling F3 Uranium Corp. announced that mobilization for the summer drilling program is underway at its 100%-owned Patterson Lake North project. The fully funded 30-hole drill program will commence this weekend to expand on the highly successful winter drill results at the JR Zone. The discovery hole at the JR Zone, drilled in November 2022, intersected one continuous 15.0 m interval averaging 6.97% U3O8 including a high-grade 5.5 m interval averaging 18.6% U3O8. A 21-hole follow-up winter drilling program expanded the JR Zone to a strike length of 105m and hole PLN23-060, cored 60m grid south from the discovery hole intercepted one continuous 14.5m interval averaging 9.4% U3O8 including an ultra-high grade 5.0 m interval averaging 26.7% U3O8. Aankondiging • May 19
F3 Uranium Corp.'s Ross Mcelroy Steps Down as a Director of the Company Effective May 14, 2023 F3 Uranium Corp. announced that Ross McElroy has stepped down as a Director of the Company effective May 14, 2023. Aankondiging • Feb 16
F3 Uranium Corp. Appoints Chris Hilditch to the Board of Directors F3 Uranium Corp. announced the appointment of Mr. Chris Hilditch to the Board of Directors. Chris started his career at the London Stock Exchange as a trader, becoming a member of the Exchange in 1983. Chris moved into investment banking in 1986 and spent the next 20 years working in all sectors of capital markets in the U.K with Morgan Stanley, Deutsche Bank and Goldman Sachs. Aankondiging • Feb 09
F3 Uranium Corp. Announces Results from the First Eight Drill Holes of the 20-Hole Winter Drill Program At the Jr Zone on the Patterson Lake North Property F3 Uranium Corp. announced results from the first eight drill holes of the 20-hole winter drill program at the JR Zone on the Patterson Lake North Property. Most significantly, continuity of high grade mineralization has been established along strike towards the south with hole PLN23-048 on line 030S, which hit 14.0m total composite mineralization with 4.0m of >40,000 cps, including 0.5m of "offscale" or >65,535 cps, a 30m stepout from the discovery hole. Out of the eight reported drill holes, seven are mineralized and five have high grade mineralization with radioactivity >10,000 cps. Mineralization was further defined on section 00N up dip and towards the Athabasca Unconformity of hole PLN22-041 with hole PLN23-047. Mineralization remains open in all directions. Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. All depth measurements reported are down-hole and true thickness are yet to be determined. Samples from the drill core are split in half on site and are standardized at 0.5 m lengths. One half of the split sample will be submitted to SRC Geoanalytical Laboratories in Saskatoon, SK. for lithogeochemical analysis using their "Uranium Package". All depth measurements reported are down-hole and true thickness are yet to be determined but the Company estimates true thickness of the reported intervals in this news release to be close to reported interval widths. Aankondiging • Feb 08
F3 Uranium Corp. Receives Final Uranium Assay Results for the Remaining Fall 2022 Drill Holes At the JR Zone on the Patterson Lake North Property F3 Uranium Corp. announced it has received final uranium assay results for the remaining fall 2022 drill holes at the JR Zone on the Patterson Lake North (PLN) Property where off-scale radioactivity was previously confirmed as high grade uranium mineralization. Drill hole PLN22-038 targeted up dip from hole PLS22-035 and returned an 11.0 m interval averaging 4.20% U3O8 including a high-grade 4.5 m interval averaging 9.8% U3O8, which further includes the ultra-high-grade core which assayed 22.9% over 1.5 m. PLN22-038 was the second of three mineralized holes completed on line 00N, in addition to a fourth mineralized hole on line 015S. Drilling Highlights: PLN22-038 (line 00N): mineralized intervals: 11.0 m @ 4.20% U3O8 (240.5 m to 251.5 m), including: 4.5 m @ 9.8% U3O8 (244.0 m to 248.5 m), further including: 1.5 m @ 22.9% U3O8 (245.5 m to 247.0 m). The 20 hole Winter 2023 drill program is well underway, and the Company looks forward to providing an update. Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS. All depth measurements reported are down-hole and true thickness are yet to be determined but the Company estimates true thickness of the reported intervals in this news release to be close to reported interval widths. Patterson Lake North: The Company's large 39,946 hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit. Aankondiging • Jan 04
Fission 3.0 Commences Mobilization for Step-Out Drilling at its High-Grade Uranium Zone at PLN Fission 3.0 Corp. announced that mobilization for winter drilling has commenced at its 100% owned Patterson Lake North (PLN) project. A 20-hole program of step out drilling is planned to expand on the highly successful drill results from November 2022 where assays confirmed shallow depth, wide and continuous mineralization in basement rock with 15.0 m @ 6.97% U3O8 including a high-grade 5.5 m interval averaging 18.6% U3O8 (PLN22-035). Drill holes are designed to test for continuation of mineralization along strike, and up and down dip, where four holes drilled in the fall 2022 outlined a very significant zone of high-grade uranium, which remains open in all directions. The plan will include additional holes on section lines 00N and 15S to establish the extent of the mineralization that has already be intersected on those 2 lines before stepping out along strike. Holes will also test up-dip for unconformity and sandstone hosted mineralization. Assay results from the remaining drill holes of the fall 2022 program will be released as they become available and finalized. The company's large 39,946 hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new A1 uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit.