공시 • Mar 21
Vulcan Energy Resources Limited, Annual General Meeting, May 28, 2026 Vulcan Energy Resources Limited, Annual General Meeting, May 28, 2026. 공시 • Jan 22
Vulcan Energy Resources Limited Successful Production Test Results from First New Lionheart Well Vulcan Energy Resources Limited has announced successful production test results from its first new Lionheart well, LSC-1bsidetrack, as part of the Phase One Lionheart Project Field Development Plan (FDP) in Germany’s Upper Rhine Valley Brine Field. The production test confirmed strong well deliverability, with a potential production capacity range of 105 to 125 liters per second (l/s), supporting the Phase One FDP's average well production of approximately 84 to 94 l/s. This development enhances confidence in the subsurface conditions and supports the ongoing construction and execution of the project, which aims to produce 24,000 tonnes of lithium hydroxide monohydrate annually by 2028. The project is fully funded following the securing of project financing in December 2025 and is expected to provide a strategic source of lithium for the European battery and electric vehicle industry. 공시 • Dec 04
Vulcan Energy Resources Limited has filed a Follow-on Equity Offering in the amount of AUD 1.073309 billion. Vulcan Energy Resources Limited has filed a Follow-on Equity Offering in the amount of AUD 1.073309 billion.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 61,327,226
Price\Range: AUD 4
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 116,000,000
Price\Range: AUD 4
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 58,000,000
Price\Range: AUD 4
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 33,000,000
Price\Range: AUD 4
Transaction Features: Rights Offering; Subsequent Direct Listing 공시 • Jul 11
Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 53.6 million. Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 53.6 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 5,764,706
Price\Range: AUD 3.4
Discount Per Security: AUD 0.119
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 10,000,000
Price\Range: AUD 3.4
Transaction Features: Subsequent Direct Listing 공시 • Jul 08
Vulcan Energy Resources Limited Announces Update on Lithium Brine Resource Estimation Vulcan Energy announced that following a 3D seismic survey, it has successfully completed an updated lithium brine Resource estimation, together with a maiden geothermal energy Resource estimation, for the Mannheim licence area of Germany's Upper Rhine Valley Brine Field (URVBF). The lithium brine Resource estimation update for the Mannheim sector estimates the total lithium brine Resource (Indicated and Inferred) has increased from 1,833kt LCE @ 153 mg/Li to 3,225kt LCE @ 155 mg/Li, which is an increase of 1,392kt LCE. A large-scale in place maiden geothermal Resource of 2,848 PJ (Indicated) and 10,539 PJ (Inferred) has also been estimated for the Mannheim sector of which 171 PJ (Indicated) and 377 PJ (Inferred) are considered recoverable. The Company intends to continue to complete geothermal energy Resource estimations under the Australian Geothermal Reporting Code for all its development areas within the URVBF, to better assist with investors' understanding of the scale of the URVBF geothermal potential. Vulcan is progressing a Scoping Study for the Mannheim licence which is located 40km to the northeast of Phase One. The study will look to add further production in addition to the Phase One integrated lithium and geothermal renewable energy development including expansion of the downstream lithium hydroxide monohydrate (LHM) facility in Industrie-Park Hochst. It is envisaged Vulcan will deliver baseload geothermal heat from the Mannheim region geothermal resource to the district heating network of MVV Energie AG (MVV), one of Germany's leading energy companies, while simultaneously extracting sustainable lithium for EV battery production. This lithium brine Resource estimation update, and maiden geothermal energy Resource estimates, both for the Mannheim region of Germany's URVBF, is based on a Competent Person's Report prepared by GLJ Ltd. as Competent Person (CP) for the Company (Report). The Mineral Resource Estimation for the Indicated Resource classification is 820 kt LCE and for the Inferred Resource classification is 2,405 kt LCE for the Mannheim licence per Table 1. The report provides the reporting of Geothermal Resource estimation for the Mannheim licence area, in accordance with the Australian Code for Reporting of Exploration Results, Geothermal Resources and Geothermal Reserves, ("Geothermal Reporting Code" or "GRC"), Second Edition (2010), developed by the Joint Committee of the Australian Geothermal Energy Group ("AGEG") and the Australian Geothermal Energy Association ("AGEA") as well as the supporting Geothermal Lexicon for Resources and Reserves Definition and Reporting ("Geothermal Lexicon"), Edition 2, compiled by Lawless, J. for The Geothermal Code Committee. Additionally, due to newly acquired data in the Mannheim licence area, there is an update provided on Lithium Mineral Resource estimation for the Mannheim license in this announcement. Geothermal Resource Estimation is reported for the Mannheim licence, which is part of a future phase of development, described as Mannheim Sector or Mannheim licence area in the report. Phase One of the Project plans for a central surface facility for geothermal energy and lithium extraction, where the integrated facilities are referred to as the geothermal and lithium extraction plant ("GLEP"), which will be fed from a number of multi-well pads. The information in this announcement that relates to estimates of Mineral Resources (other than the update to the Mannheim region of the URVBF as contained in this announcement) and Ore Reserves is extracted from the following ASX announcement: Zero Carbon Lithium Lithium Lithium LithiumTM Project Phase One Briding Project Phase One Briding Project plans for the Mannheim licence area. 공시 • Mar 18
Vulcan Energy Resources Limited, Annual General Meeting, May 28, 2025 Vulcan Energy Resources Limited, Annual General Meeting, May 28, 2025. 공시 • Dec 19
Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 154.084583 million. Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 154.084583 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 26,339,245
Price\Range: AUD 5.85
Discount Per Security: AUD 0.117
Transaction Features: Subsequent Direct Listing 공시 • Nov 27
Vulcan Energy Announces Board and Committee Changes, Effective January 1, 2025 As part of the evolution of the Company Board, Vulcan Energy announced planned changes to its Company Board and committees effective 1 January 2025. Felicity Gooding will be appointed as Executive Director, in addition to her role as Group Chief Financial Officer. A senior finance executive with 20 years' experience and extensive listed company director experience, Ms Gooding joined the Company in January 2024, responsible for the Company's corporate services, including steering the Phase One debt and project-level equity financing. Angus Barker, Non-Executive Director, will be appointed as Lead Independent Director and Deputy Chair. Mr. Barker, an experienced director with a strong background in corporate finance and public company boards, joined the Board as Non-Executive Director in September 2024. As Lead Independent Director and Deputy Chair, he will represent the Board when Executive Chair, Francis Wedin, is unable to do so, and act as the principal liaison between independent directors, company executives, investors and other stakeholders, and Dr. Wedin. Mr. Barker will also assume the role of Chair of the People and Performance Committee (PPC), along with non-executive directors Josephine Bush and Dr. Günter Hilken who will also be appointed as new PPC members, and replace Ranya Alkadamani as Chair of the Nominations Committee. Mr. Barker will also join the Audit, Risk and Environmental, Social and Governance (ARESG) Committee, which is chaired by Josephine Bush. 공시 • Sep 27
Vulcan Energy Resources Limited (ASX:VUL) entered into a 100% conditional acquisition of Geox GmbH from Ikav Invest S.À R.L. for €15 million. Vulcan Energy Resources Limited (ASX:VUL) entered into a 100% conditional acquisition of Geox GmbH from Ikav Invest S.À R.L. for €15 million on September 27, 2024. The consideration will be paid in cash, with payments to be made at the earlier of June 30, 2025 or when Vulcan has raised funding for Phase One of the ZERO CARBON LITHIUM Project. Acquisition of the assets will allow for the streamlining and consolidation of the remaining upstream production assets of the Project into 100% Vulcan ownership and replaces an existing Joint Venture agreement and brine offtake agreement with Geox.
The transaction is subject to regulatory and customary closing conditions, such as garnering approval from the Foreign Direct Investment Approval from the German Federal Ministry for Economic Affairs and Climate Action 공시 • Jun 14
Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 65.28 million. Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 65.28 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 16,000,000
Price\Range: AUD 4.08
Discount Per Security: AUD 0.072624
Transaction Features: Subsequent Direct Listing 공시 • Jun 05
Kuniko Limited has filed a Follow-on Equity Offering in the amount of €40 million. Kuniko Limited has filed a Follow-on Equity Offering in the amount of €40 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 16,000,000
Price\Range: €2.5
Transaction Features: Subsequent Direct Listing 공시 • Mar 19
Vulcan Energy Resources Limited, Annual General Meeting, May 24, 2024 Vulcan Energy Resources Limited, Annual General Meeting, May 24, 2024. 공시 • Jan 31
Vulcan Energy Announces Retirement of Mark Skelton as Non-Executive Director, Effective from February 1, 2024 Vulcan Energy Resources has reported that Mark Skelton will retire from the Board as a non-executive director of the Company effective February 1, 2024. Mr. Skelton joined the Board of Vulcan in April 2022 whilst the Company was evolving from a development company into a project execution company. During his time on the Board, Mr. Skelton contributed to building a strong executive leadership team across Vulcan, and specifically, the build-out of the project execution team, which has already made significant strides with completion of the construction of the Lithium Extraction and Optimisation Plant. As the Company moves towards Phase One execution, the Projects Oversight Committee, constituted of members Dr. Heidi Grön and Dr. Günter Hilken who both have significant chemical plant construction expertise, will be chaired by Dr. Hilken, to reflect the German-centric focus of project execution-related risk governance during the next phase of the Company's growth. 공시 • Jan 15
Vulcan Energy Resources Limited Announces CFO Changes Vulcan Energy Resources Limited announced that Felicity Gooding has been appointed to the role of Group Chief Financial Officer (CFO) for the Vulcan Group. Ms Gooding is a Senior Finance executive and leader with over 20 years' experience in strategic and financial analysis, debt funding (including acting as joint project leader in obtaining expansion finance for Fortescue Limited totalling $3.5 billion), corporate finance, mergers and acquisitions, management and financial accounting and governance within Australia, Singapore, London and Washington DC. Her experience has been gained across multiple industries relevant to Vulcan including energy, mining and infrastructure, including most recently as CFO and Global Head of Commercial at Fortescue Future Industries, where she led the finance team, including the specialist project financing team responsible for securing finance to enable financial investment decisions for green energy projects. Prior to this, Ms Gooding was the Deputy CEO at the Minderoo Foundation and Chief Operating Officer and CFO of both the Minderoo Foundation and Tatterang, Andrew and Nicola Forrest's private family office and investment vehicle. She has significant director experience, having served on the boards of Poseidon Nickel, the Freedom Fund, Impact Minerals Limited, and Zhero BV 1, among others. Ms Gooding is also a fellow of the Australian Institute of Chartered Accountants and a member of the Australian Institute of Company Directors. Ms Gooding's extensive experience with large-scale financing will assist the Company during the financing of the multiple phases of Vulcan's Zero Carbon LithiumTM Project, of which Phase 1 financing is already under way, and is an opportune appointment at the current stage of the Company's development. As part of the planned change reflective of the stage of the Company's growth, Mr. Robert Ierace will step down from his role as CFO-Australia effective 15 January 2024, however he will remain with the Company until the end of March to assist Ms Gooding and ensure a smooth transition. The Company would like to take this opportunity to thank Mr. Ierace for his invaluable hard work and efforts during his tenure in which the Company has experienced significant growth and wishes him all the best in his future endeavours. 공시 • Feb 13
Vulcan Energy Resources Limited Announces Results of Definitive Feasibility Study of Vulcan's Zero Carbon LithiumTM Project Vulcan Energy Resources Limited announced the results of its Definitive Feasibility Study (DFS) for Phase One of Vulcan's Zero Carbon LithiumTM Project. Vulcan aims to be the integrated lithium chemicals and renewable energy producer with net zero greenhouse gas emissions. Vulcan Energy Resources Ltd. (‘Vulcan’, ‘the Company’) has conducted a Definitive Feasibility Study (‘DFS’) on the Phase One planned commercial development of its Zero Carbon LithiumTM Project (‘the Project’), which is a combined geothermal energy (heat and power), lithium extraction and lithium hydroxide refining Project in the Upper Rhine Valley Brine Field (‘URVBF’). The URVBF, a hot, deep sub- surface geothermal brine field, is enriched in lithium, and Vulcan's Project is developing dual production of renewable energy and lithium from the same deep brine source. Vulcan aims to produce approximately 24,000 tonnes per annum (tpa) lithium hydroxide monohydrate (LHM) from its Phase One development, as well as over 300 GWh of power and over 250 GWh of renewable heat production. The DFS was conducted on the sub-surface geology, field development planning, Resource and Reserve estimation, surface piping infrastructure, and geothermal plant, Lithium Extraction Plant (LEP), and Central Lithium (hydroxide) Plant (CLP) engineering and design. Vulcan's in-house team of geologists and reservoir engineers lead the sub-surface work, with review, audit and sign-off of Resources and Reserves by energy industry specialists GLJ Ltd., partnered with lithium brine specialists Groundwater Insight. Vulcan's in-house engineering team led the work on the surface piping and geothermal plant design. Hatch Ltd. led the work on the LEP and CLP engineering and design, guided by Vulcan's in-house lithium chemistry and chemical engineering team, and backed up by thousands of hours of test-work from Vulcan's lithium extraction pilot plants, as well as laboratory test-work both internally and externally. The purpose of the DFS is to provide the Company with a decision tool to move the Project to the next phase of development, through bridging engineering, to execution and construction. Phase One targeted production: · Target of 24,000tpa of Lithium Hydroxide Monohydrate (LHM) production 21. · Target of >300GWh of renewable power and >250GWh of renewable heat produced each year 22. Vital project for Germany, the EU auto industry, and the European energy transition. In the Upper Rhine Valley Brine Field, in Rhineland-Palatinate for geothermal and lithium extraction, and in Frankfurt for lithium conversion. Targeted start of construction in H2 2023 (drilling to increase geothermal brine production) Targeted start of lithium production in late 2025 23. Growing team: 280 in-house personnel working for Vulcan. Project financing planned to commence through debt and equity. Integrated execution plan using VUL expertise together with multiple experienced partner companies.