공시 • May 30
Chibougamau Independent Mines Inc. Reports Drilling Results and Exploration Updates on Berrigan Mine Asset Chibougamau Independent Mines Inc. reported that Tomagold Corporation has provided an update as regards recent drilling on the Berrigan Mine claims in the Chibougamau area of Quebec. The Berrigan Mine claims and a large number of others are under option from Chibougamau Independent Mines Inc. Previous Phase 1 drilling intersected the historical Berrigan Mine mineralization but also in two drill hole TOM-25-015 and Tom-25-014 intersected 5.08 ZnEq (1.19 g/t AuEq over 98.5 m including 23.20% ZnEq over 4.90 m from the new lower zone and 24.85% ZnEq (5.83 AuEq) over 2.1 m in the Berrigan zone and 13.68 ZnEq (3.17 g/t AuEq) in the new lower zone respectively as reported in TomaGold’s. Phase 2 drilling was focused upon extending 5 drill holes TOM-25-009 to TOM 25-013 inclusive in order to intersect the new zone as the previous drilling was focused upon the historical shallower mineralization. In TomaGold’s press release dated 2026-05-28, Tomagold reports: The program, which focused on extending drill holes TOM-25-009 through TOM-25-013, was designed to test the core of modelled conductive plates at depth and evaluate the potential of the Berrigan Deep zone, discovered just before Christmas. The Company is encouraged by the systematic mineralization observed in the recovered drill core. Holes TOM-25-009EXT and TOM-25-011EXT have been logged and cut, and the samples have been shipped to the laboratory; assay results for these holes are expected shortly. Holes TOM-25-010EXT, TOM-25-012EXT and TOM-25-013EXT are currently being logged and cut. Concurrently, encouraged by these positive geological indicators, TomaGold is launching a large-scale ground prospecting and exploration campaign. The program will cover all of the strategic option properties acquired from Chibougamau Independent Mines, Globex and SOQUEM. This cohesive package of claims forms a true consolidated mining camp in the heart of the Chibougamau mining district. Several high-priority historical mineralized showings that have never been subject to rigorous follow-up work will be evaluated and sampled over the coming weeks. In addition, in order to optimize the structural understanding of the area and map the continuity of mineralized zones at depth, the Company will soon initiate a borehole electromagnetic (BHEM) survey in drill holes TOM-25-010, TOM-25-012 and TOM-25-015 to detect off-hole conductors and identify potential deep extensions of mineralized zones already intersected by drilling. The Company also plans to conduct a large-scale surface geophysical (UTEM) survey over a corridor measuring approximately 4 km by 2 km to identify new regional conductors and prioritize high-potential drill targets along the area’s main mineralized structures. Finally, an audio-frequency magnetotelluric (AMT) geophysical program is also planned to map deep resistivity contrasts, better define the district’s structural architecture and identify corridors potentially associated with regional mineralized systems. Both the UTEM and AMT surveys have the capacity to investigate depths of up to 2 km, enabling the identification of major structural corridors and potential concealed massive sulphide lenses. 3D plan view showing drill holes TOM-25-009 to TOM-25-013 and their planned extensions (blue lines) targeting the modeled conductive plate at depth, along with significant intersections from holes TOM-25-014 and TOM-25-015 within the Berrigan Deep zone. AuEq calculation was based on USD 4,150/oz Au, USD 51.34/oz Ag, USD 5.023/lb Cu and USD 1.392/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023), applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper. ZnEq calculation was based on USD 4,047/oz Au, USD 50.22/oz Ag, USD 4.796/lb Cu and USD 1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) /10,000, applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper. 공시 • Dec 31
Chibougamau Independent Mines Inc. announced that it has received CAD 0.2 million in funding ChibougamauIndependent Mines Inc. announced a private placement to issue 689,655 flow-through shares at a price of CAD 0.29 per share for proceeds of approximately CAD 199,999.95 on December 30, 2025. As a result of the closing of the private placement, there are 61,755,191 common shares of Chibougamau issued and outstanding. Under applicable securities legislation and the policies of the TSX Venture Exchange, the 689,655 shares issued at the closing of the private placement are subject to a four-month hold period expiring on May 1, 2026. 공시 • Jul 18
Chibougamau Independent Mines Inc. Advances Work On Mont Sorcier Iron/Vanadium Project Chibougamau Independent Mines Inc. is advancing work on the Mont Sorcier Iron/vanadium project, focusing on detailed metallurgical test work and flow sheet design. The company has initiated an infill drill program to update resources to the Proven and Probable categories, supporting the ongoing feasibility study. The Bankable Feasibility Study aims to provide greater detail on the project's potential, building on the 2022 NI 43-101 Preliminary Economic Assessment. With improved metallurgical results, Cerrado Gold Inc. is confident in delivering a high purity DRI grade Iron ore concentrate product, enhancing project value and supporting the Green Steel transition. 공시 • Jul 02
Chibougamau Independent Mines Inc., Annual General Meeting, Sep 17, 2025 Chibougamau Independent Mines Inc., Annual General Meeting, Sep 17, 2025. Location: ontario, toronto Canada 공시 • Jul 02
Chibougamau Independent Mines Inc., Annual General Meeting, Sep 18, 2024 Chibougamau Independent Mines Inc., Annual General Meeting, Sep 18, 2024. Location: ontario, toronto Canada 공시 • Jul 01
Chibougamau Independent Mines Inc., Annual General Meeting, Sep 22, 2023 Chibougamau Independent Mines Inc., Annual General Meeting, Sep 22, 2023.