공시 • Jul 24
Aston Bay Holdings Ltd. and American West Metals Limited Confirm Expansion of High-Grade Copper Zones At the Storm Project, Nunavut, Canada
Aston Bay Holdings Ltd. present an update on drilling and exploration activities currently underway at the Storm Copper Project (‘Storm’ or the ‘Project’) on Somerset Island, Nunavut. The program is being conducted by American West Metals Limited (‘American West’), who is the operator of the Project. Aston Bay and American West have formed a 20/80 unincorporated joint venture in respect of the Storm Project property, with Aston Bay maintaining a free carried interest until a decision to mine upon completion of a bankable feasibility study. OVERVIEW: DRILL PROGRAM ON TARGET TO EXCEED 20,000 METRES: A total of 60 RC drill holes (for approximately 7,660m) have now been completed during the 2024 drilling program. The diamond drill rig has completed 6 drill holes (for approximately 677m). The latest drilling has been completed at the Cyclone, Chinook, Thunder, and Lightning Ridge high-grade copper prospects, and on various exploration targets within Storm. The visual results from 22 of these drill holes have been received. The mineralogy and presence of copper have been confirmed with portable XRF analysis. The 2024 drill program is continuing with two RC and one diamond drill rig. The excellent production of the drilling achieved to date puts the program on track to complete the planned 20,000m of drilling. THUNDER COPPER PROSPECT: MINERALIZATION EXTENDED OVER 300M, OPEN IN ALL DIRECTIONS: The Thunder Prospect is located to the west of the Chinook and Lightning Ridge copper prospects. The high-grade copper zone was discovered with exploration drilling during 2023 in which drill hole ST23-03 intersected 48.8m @ 3% Cu from 32m downhole. The discovery drill hole at Thunder was designed to test a strong EM anomaly in the vicinity of historical drilling which had intersected thin zones of high-grade copper sulfides (ST00-66 intersected 7.6M @ 1.6% Cu from 55.5m downhole, including 1.1m @ 4.8% Cu from 58.3m downhole). The Thunder prospect is located within the extensive southern graben fault system, which hosts all known copper deposits in the southern area of Storm. The proximity of Thunder to a major fault jog and the high volume of semi-massive sulfide breccia mineralization is strongly suggestive that the copper is fault-related and steeply dipping, as seen at the nearby Chinook and Corona prospects. The initial drilling during 2024 at Thunder has included nine widely spaced drill holes designed to test the strike extent and potential geometry of the high-grade mineralization intersected during 2023 (& 3). The visual results have now been received and confirm that all drills holes have intersected visual copper sulfides, including thick intervals of very strong visual copper sulfides within the interpreted main zone of mineralization The known strike extent of the Thunder copper zone is now interpreted to be over 300m, and it remains open along strike and at depth. THUNDER MAIN COPPER ZONE DRILL HOLE DETAILS: RC drill holes SR24-022, -030, -034, -040, and -042 were drilled along the interpreted east-west strike of the Thunder mineralized zone. Drill holes SR24-030, -034, and -042 have intersected thick visual copper sulfide mineralization (approximately 58.5m, 121.9m, and 73.2m respectively). The mineralization within these drill holes is dominantly chalcocite and particularly strong in the vicinity and to the west of discovery drill hole ST23-03. Drill hole SR24-040 is the westernmost drill hole completed to date at the Thunder Prospect. The drill hole intersected 36.6m of visual chalcocite mineralization from approximately 47.2m downhole, which contains a zone of over 5% visual sulfide at approximately 70.1m downhole. The wide interval and strong nature of the mineralization within SR24-040 suggest that the copper mineralization will likely extend further to the west. Drill hole SR24-022 was drilled approximately 130m to the east of the main zone and intersected two intervals of minor chalcocite, chalcopyrite, and pyrite mineralization. The drill hole was drilled oriented to the south and missed the main zone of mineralization. The chalcopyrite-pyrite mineral assemblage intersected in the lower interval is typical of the margins of sediment-hosted copper systems. Further drilling is planned to determine the extent and location of the Thunder mineralization in this area. THUNDER EXPLORATION DRILL HOLE DETAILS: Four RC drill holes were drilled around the interpreted Thunder trend to determine the orientation of the high-grade copper mineralization. Drill holes SR24-036 and SR24-038 were drilled to the north of the prospect, and were designed to test the potential lateral extension of the mineralization to the north. Both drill holes intersected thick intervals of visual copper sulfides (41.2m and 38.1m respectively). The dominant visual copper sulfide in both drill holes is chalcopyrite, with chalcocite also encountered in SR24-038. Drill holes SR24-032 and SR24-044 are located approximately 150m south of the interpreted Thunder mineralized zone, and were drilled toward the north. This orientation was designed to test both the vertical and potential southern lateral extent of the mineralization. Both drill holes intersected thick intervals of visual copper sulfides (38.1m and 39.2m respectively), including very strong visual chalcocite mineralization in drill hole SR24-044 at approximately 86.9 - 90m downhole. The visual copper sulfides within all of the Thunder drill holes are hosted in veinlets and breccias within the Allen Bay dolomudstones. However, the assemblage of copper minerals in the southern and northern Thunder drill holes (including abundant chalcopyrite and pyrite) suggests that they are potentially located on the margin of an east-west orientated and steeply dipping copper system. Diamond drilling is planned to confirm these assumptions. CYCLONE: MORE THICK COPPER INTERSECTIONS: Drilling at the Cyclone Prospect is continuing and the visual results from drill holes SR24-028, -029, -031, -035, -037, -039, -043, -045, -047, -049, -051, -053, -055 have been received. The visual results continue to demonstrate the excellent lateral continuity of the copper mineralization and confirm the potential for future resources at Cyclone and to the southwest, east, and north. DRILL HOLE SR24-031 & SR24-055 DETAILS: Drill holes SR24-031 and SR24-055 were drilled to the northeast of the Cyclone Prospect. The drill holes are located within a large and untested area and were designed to test for potential extensions to the known copper mineralization to the north of Cyclone, and between 2023 drill hole SR23-55 (7.6m @ 1% Cu from 105.2m downhole, including 1.5m @ 2% Cu from 109.7m downhole).