공시 • Feb 14
Altiplano Metals Inc. Provides Update on Mining and Processing Operations Altiplano Metals Inc. announced operational updates at the Santa Beatriz copper-gold-iron (Cu-Au-Fe) mine and the El Penon Processing plant, located approximately 30 kilometers south of La Serena, Chile. Altiplano entered a short-term agreement with the mining contractor Andes Core Mining (ACM) to conduct mining and processing operations for the Santa Beatriz and El Penon processing plant. The purpose of the agreement was to rent the operations providing APN the opportunity to receive rental income while benefiting from further mine development and plant optimization. ACM was to further develop the Santa Beatriz mine to lower levels intended to intersect higher grade sections of the mine. This area, supported by the previous drill program, was expected to provide new operating faces of the Iron Oxide Copper Gold vein. ACM was to also operate the plant to process the material mined at Santa Beatriz for the benefit of obtaining a rental fee while maintaining and sustaining the processing facilities. Commercial terms involved ACM paying APN USD 8/tonne of material mined at Santa Beatriz. In addition, APN was to receive USD 30,000/month for the rental of the plant. ACM was to be responsible for all costs at each operation, mine rental fees and royalties, including personnel, mine development, sustainability and plant maintenance. Development was focused on the 425 m, 400 m and 392 m levels. Development was also conducted in the ceilings of the 400 m and 391 m levels. Advancing to the 382 level, ACM reached a total of 30 of an expected 80 m. This short-term arrangement has been suspended to review outcomes and consider strategic opportunities to generate improved shareholder returns. Both operations have been placed on short term care and maintenance while an optimization plan is currently under review. The decision to develop the historical Santa Beatriz mine is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty of economic and technical risks of failure associated with any potential production decision. The Company further announces the private placement announced on October 14, 2025 has been closed. The placement totaled 21,194,300 units (the "Units") at a price of $0.05 per Unit, for total gross proceeds of $1,059,715. Each Warrant will be exercisable to acquire one additional common share at a price of CAD 0.075 per share until December 19, 2027. 공시 • Oct 20
Altiplano Metals Inc. Intersects New 400 M Mining Level And Updates Cu-Au-Fe Concentrate Sales Altiplano Metals Inc. announced operational updates at the Santa Beatriz copper-gold-iron (Cu-Au-Fe) mine and processing updates at the El Peñón Processing plant, located approximately 30 kilometers south of La Serena, Chile. During the month of September, the Company extracted 2,270 tonnes of copper-gold-iron mineralized from the 425 m level along north-east and southwest mining drifts. Shipments to the El Peñón processing plant to support the production of copper/gold and iron concentrates was 1,910 tonnes. At the end of September, 360 tonnes remain on site with shipment to the plant expected in October. The development in the 400 m tunnel, accessed through the 414 m opening, reached the 400 m level in early October. A total of 54.32 metres has been developed to date. Access along this level and development of the lower levels will be further reviewed to ensure grade control is maximized. Massive sulphides were observed in the vein (chalcopyrite, pyrite), as well as magnetite and secondary minerals such as apatite and actinolite. During the reporting period July to September 2025, the Company generated USD 256,717 (CAD 360,600) from the sale of 128.7 tonnes of copper/gold concentrate representing USD 222,600, and 483 tonnes of iron representing USD 34,117. The decision to develop the historical Santa Beatriz mine is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty of economic and technical risks of failure associated with any potential production decision. 공시 • Oct 11
Altiplano Metals Inc. announced that it expects to receive CAD 1.5 million in funding Altiplano Metals Inc. announced a non-brokered private placement of up to 30,000,000 units at an issue price of CAD 0.05 per unit for gross proceeds of CAD 1,500,000 on October 10, 2025. Each unit will consist of one common share and one-half non-transferable share purchase warrant of the company. Each warrant will be exercisable to acquire one additional common share at a price of CAD 0.075 per share for two years from the closing date of the offering. Completion of the offering is subject to the delivery of definitive subscription agreements and TSX Venture Exchange acceptance. All the securities issued pursuant to this offering will have a hold period expiring four months and a day after the closing date. The company may pay finders' fees raised in connection with the financing to arm's-length finders in accordance with the policies of the TSX-V and as permitted by law. 공시 • Jul 22
Altiplano Metals Inc., Annual General Meeting, Sep 18, 2025 Altiplano Metals Inc., Annual General Meeting, Sep 18, 2025. 공시 • Jun 11
Altiplano Metals Inc. announced that it has received CAD 0.72375 million in funding On June 10, 2025, Altiplano Metals Inc. closed the transaction. The company issued 1,690,000 units at an issue price of CAD 0.05 for gross proceeds of CAD 84,500 in its second and final tranche. Each whole warrant entitles the holder to purchase one common share of the company at an exercise of CAD 0.075 per common share until June 9, 2027. The company has the right to accelerate the expiry date of the warrants from each tranche upon the occurrence of certain events. In connection with the sale of the units sold in the second tranche, the company paid a total of CAD 600 in cash and issued 12,000 finder's warrants, on the same terms as the warrants, to an eligible finder for certain of the units sold. All securities issued in the second tranche are subject to a hold period until October 10, 2025. The insiders of the company subscribed for portion of private placement. 공시 • May 23
Altiplano Metals Inc. Provides Operational Update At El Peñón and Santa Beatriz Altiplano Metals Inc. provided operational updates at the Company's historic Santa Beatriz copper/gold mine and the El Peñón processing facility located approximately 30 kilometers south of La Serena, Chile. Total mineralized bulk sample material produced from Santa Beatriz and processed at the El Peñón plant between January and March 2025 represented 1,259.40 tonnes grading at 1.38% Cu. An additional 987.3 tonnes with an estimated grade of 1.25% Cu have been shipped and stockpiled at the plant site for processing in May. Gold grades are expected after final settlement of the concentrate sales. A total of 5,391 tonnes of Cu-Au mineralized material was processed at the plant during the Fourth Quarter 2025 (Jan-Mar) period generating 142.5 tonnes of Cu-Au concentrate with an approximate average grade of 24.5% copper and 1.6 g/t of gold. This production generated USD 315,515 in revenue (CAD 453,585). Additionally, 2,432 tonnes of iron was sold during the period generating revenue of USD 124,016 (CAD 178,284). A blend of third-party material, Santa Beatriz bulk samples and Farellon stockpiles were used to supply the plant. Mine development is under review at Santa Beatriz where 3,000 tonnes/month can be initially produced within 6 weeks of decline development and improving up to 5,000 tonnes/month within 6 months. Third party material can be used to supplement processing capacity as development ramps up. Altiplano has generated over CAD 23.8 million from the recovery and sale (after processing costs) of more than 8.2 million pounds of copper (Dec 2018 to Mar 2025). Cash has been re-invested into acquisition, exploration, new equipment, drilling, expanding underground development and production, and the completion of the El Peñón copper-gold-iron processing facility located 30 km from La Serena, Chile.