공시 • Apr 30
Titan Mining Corporation to Report Q1, 2026 Results on May 13, 2026 Titan Mining Corporation announced that they will report Q1, 2026 results Pre-Market on May 13, 2026 공시 • Apr 17
Titan Mining Corporation Extends Kilbourne Graphite Mineralization and Advances Germanium and the 2026 Multi-Commodity Exploration Strategy Titan Mining Corporation reported drill results confirming graphite mineralization up to 2,500 feet east of the current Kilbourne resource boundary, highlighting significant potential to expand the deposit beyond the 2025 Preliminary Economic Assessment mine plan. The Company also provides an update on its germanium-related activities and outlines its 2026 exploration program across graphite & zinc. Germanium within existing process streams at Empire State Mines is found to be predominantly associated with mica and other gangue materials rather than sulphides. Kilbourne East drilling confirms stratabound graphite continuity up to 2,500 ft east of the conceptual pit design, supporting meaningful eastward potential mineral resource estimate expansion and mine life extension beyond the 13-year base case established in the 2025 Preliminary Economic Assessment. Results demonstrate grades consistent with the main Kilbourne deposit, reinforcing continuity of a broader graphite system. Notable intercepts include: Hole KX26-077 intersected 255.1 ft at 3.0% Cg from 57.9 ft to 313.0 ft, including 97.0 ft at 3.5% Cg from 200.0 ft to 297.0 ft, the widest intersection recorded in the eastern extension to date; Hole KX26-079 intersected 92.2 ft at 3.1% Cg from 110.0 ft to 202.2 ft, including 60.0 ft at 3.4% Cg from 130.0 ft to 190.0 ft, consistent in grade with the main Kilbourne resource. Infill drilling at Kilbourne East to commence, targeting upgrade of Inferred Mineral Resources to Indicated category for inclusion in the fully funded Feasibility Study currently underway. Eastern zones of the Kilbourne Deposit offer reduced surface encumbrance, expanding mine infrastructure optionality. Excellent conversion ratios witnessed from infill drilling of existing resource with targeted conversion of 85% from Inferred Mineral Resources to Measured & Indicated Mineral Resources. 2026 exploration program advances graphite, zinc and critical mineral targets across Titan’s 120,000-acre land package; regional zinc targets include Bend, Moss Ridge and Bostwick. Integrated drilling strategy designed to maximize capital efficiency by advancing graphite delineation whilst also targeting deeper zinc mineralization concurrently. Germanium confirmed to be reporting to Empire State Mines waste streams, including the pre-float and scavenger tailings. Germanium is found to be predominantly associated with mica and other gangue materials, rather than sulphides, an important finding that defines the recovery approach. System-wide presence confirmed across all process streams through a four-week plant survey covering 11 sample points. Mixed-phase particles and inclusions show the highest germanium concentrations, with individual mica grains assaying up to 375 ppm Ge. Titan is in discussions with multiple counterparties regarding potential recovery pathways. Phase 2 of the Kilbourne drilling program (80 holes; 28,780 ft target) commenced in Third Quarter 2025 and encompasses exploration, resource delineation, and geotechnical objectives. All 80 holes have now been completed, and assays have been returned for 50 holes. The drilling campaign included dedicated 25-hole program targeting the previously undrilled eastern extension of the deposit (the “Kilbourne East” zone), totaling 8,233 ft of drilling up to 2,500 ft east of the defined resource boundary. Assays from 16 of these holes, with significant intercepts and collar information included in Tables 1 and 2, respectively, confirm graphite mineralization at grades consistent with the main deposit. The remaining 55 completed drill holes were designed to support resource delineation within the conceptual pit and to collect geotechnical data. Assay results have been received for 33 of these holes. Additional assays are pending from the laboratory. Based on data coverage for the resource model, Titan has designed two additional drillholes and will commence infill drilling at Kilbourne East with the objective of upgrading resources from the Inferred to Indicated category in support of the ongoing feasibility study. Titan’s 2026 exploration program is designed to maximize capital efficiency by advancing graphite and zinc exploration through a single integrated drilling strategy. The graphite-bearing Unit UM2 horizon is interpreted to act as a structural proxy for underlying units commonly associated with zinc mineralization, enabling Titan to generate zinc targets concurrently with graphite delineation. 공시 • Apr 04
Titan Mining Corporation, Annual General Meeting, Jun 25, 2026 Titan Mining Corporation, Annual General Meeting, Jun 25, 2026. 공시 • Mar 11
Titan Mining Corporation Commences Shipping of First Graphite Product and Launches Feasibility Study for Kilbourne Graphite Project Titan Mining Corporation announced the commencement of shipping of graphite concentrate from its demonstration facility and formal launch of its fully-funded Feasibility Study for its planned 40,000 tonne per annum Kilbourne Graphite Project in New York. The graphite demonstration plant at ESM has produced approximately 1,600 kgs of graphite concentrate and continues to ramp up to its nameplate capacity. Customer qualification shipments are underway. Titan is the only end to end producer of natural flake graphite in the United States and is actively working to end 100% import reliance of this critical material for energy, defense, and industrial uses. As part of advancing the Feasibility Study, infill drilling, together with geotechnical and exploration drilling aimed at mineral resource expansion, commenced in the fourth quarter of 2025. With approximately 82% of infill drilling and 51% of exploration drilling now complete, the Company expects to both expand its current mineral resource estimate and further optimize mine design. The Feasibility Study represents a critical milestone in transitioning Kilbourne from demonstration-scale production to a fully integrated mine, concentrator, and secondary transformation operation producing various graphite products. The study will evaluate final mine design, resource upgrade to reserves, processing optimization, infrastructure requirements, environmental advancement, and detailed capital and operating cost estimates. Titan is targeting a construction decision in late 2026 or early 2027, with construction activities anticipated to commence in 2027, subject to study results, permitting progress, and financing. The FS is being coordinated by Titan’s technical team and supported by independent engineering and technical specialists with expertise across mining, processing, infrastructure, and downstream graphite processing: M3 Engineering & Technology Corp.: Lead engineering firm and Feasibility Study coordination, including overall study integration and infrastructure design; Metpro Management Inc.: Concentrator process design and metallurgical engineering; Dorfner Anzaplan UK Ltd: Secondary transformation and refining process design; BBA Consultant USA LP: Mineral resource and technical advisory support; Fuse Advisors Inc. (Part of SLR Consulting): Mining engineering and technical services. Additional specialist consultants will be engaged as study scopes are finalized. 공시 • Feb 13
Titan Mining Corporation Announces U.S. Imposes Duties on Chinese Graphite, Boosting Domestic Natural Graphite Production Titan Mining Corporation commented on the U.S. Department of Commerce's ("Commerce") finalization of aggregate antidumping and countervailing duties ("AD/CVD") of at least 160% on certain Chinese graphite imports. The determination reflects Commerce's conclusion that Chinese graphite has been unfairly dumped and subsidized in the U.S. market.
The United States currently imports 100% of its natural graphite requirements across all forms, while China accounts for the majority of global production and downstream processing capacity. This concentration of supply presents a strategic vulnerability across defense, advanced manufacturing, energy storage and industrial applications. Titan's Kilbourne graphite demonstration facility in St. Lawrence County, New York, is producing natural flake graphite concentrate and advancing customer qualification. The Company is progressing scale up of its facility for a planned 40,000 metric tonne per annum integrated mining and processing operation designed to supply close to 50% of U.S. demand. 공시 • Feb 10
Titan Mining Corporation Provides Production Guidance for the Full Year 2026 Titan Mining Corporation provided production guidance for the full year 2026. For the year, production guidance for 2026 is estimated to be between 73 - 78 million zinc recoverable pounds or 62 - 66 million zinc payable pounds.