공시 • Apr 01
Tomagold Corporation Starts Drill Program on Berrigan Zinc Gold Silver Property
Chibougamau Independent Mines Inc. reported to shareholders that TomaGold Corporation has started a drill program to extend 5 recent drill holes in order to intersect a newly recently discovered zinc/gold/silver zone intersected beneath the previously known Berrigan mineralized zone. The Berrigan property is a part of a large land package under option from Chibougamau Independent Mines as announced in a press release dated August 14, 2023. The five drill hole extensions are planned to intersect the horizon where previous drill hole TOM-25-015 intersected 5.08% Zn Eq (1.19 g/t Au Eq) over 98.50 m, including 23.20% Zn Eq (5.44 g/t Au Eq) over 4.90 m. Drilling from the previous phase of Tomagold drilling returned significant mineralized intersections as listed below. Summary of Phase 1 drilling results at the Berrigan Mine project: TOM-25-009: 156.70-204.75m, 48.05m, 5.82% ZnEq, 1.36 g/t AuEq, 1.12 g/t Au, 7.55 g/t Ag, 0.04% Cu, 1.40% Zn; including 156.70-159.60m, 2.90m, 33.97% ZnEq, 7.96 g/t AuEq, 6.76 g/t Au, 40.24 g/t Ag, 0.19% Cu, 7.57% Zn; including 163.95-169.00m, 5.05m, 3.42% ZnEq, 0.80 g/t AuEq, 0.41 g/t Au, 11.35 g/t Ag, 0.03% Cu, 1.43% Zn; including 181.70-182.90m, 1.20m, 12.25% ZnEq, 2.87 g/t AuEq, 2.36 g/t Au, 19.50 g/t Ag, 0.03% Cu, 2.89% Zn; including 189.20-194.60m, 5.40m, 19.07% ZnEq, 4.47 g/t AuEq, 3.75 g/t Au, 16.35 g/t Ag, 0.08% Cu, 4.81% Zn; including 196.00-198.60m, 2.60m, 2.06% ZnEq, 0.49 g/t AuEq, 0.43 g/t Au, 5.28 g/t Ag, 0.06% Cu, 0.11% Zn; including 204.00-204.70m, 0.70m, 37.71% ZnEq, 8.85 g/t AuEq, 8.71 g/t Au, 9.20 g/t Ag, 0.05% Cu, 6.01% Zn; 230.35-236.80m, 6.45m, 1.23% ZnEq, 0.29 g/t AuEq, 0.14 g/t Au, 1.23 g/t Ag, 0.03% Cu, 0.67% Zn; including 235.70-236.80m, 1.10m, 5.00% ZnEq, 1.17 g/t AuEq, 0.72 g/t Au, 2.80 g/t Ag, 0.04% Cu, 2.27% Zn; 244.50-259.70m, 15.20m, 4.87% ZnEq, 1.14 g/t AuEq, 0.59 g/t Au, 7.22 g/t Ag, 0.04% Cu, 2.40% Zn; including 254.60-257.15m, 2.55m, 22.75% ZnEq, 5.29 g/t AuEq, 2.24 g/t Au, 32.07 g/t Ag, 0.15% Cu, 13.42% Zn. TOM-25-010: 108.00-111.00m, 3.00m, 2.18% ZnEq, 0.51 g/t AuEq, 0.51 g/t Au, 1.53 g/t Ag, 0.02% Cu, 0.23% Zn; 120.65-125.00m, 4.35m, 8.03% ZnEq, 1.87 g/t AuEq, 0.95 g/t Au, 9.11 g/t Ag, 0.05% Cu, 4.26% Zn; including 121.95-125.00m, 3.05m, 8.30% ZnEq, 1.93 g/t AuEq, 0.84 g/t Au, 10.56 g/t Ag, 0.06% Cu, 4.86% Zn; 130.70-179.00m, 48.30m, 2.38% ZnEq, 0.56 g/t AuEq, 0.30 g/t Au, 4.11 g/t Ag, 0.04% Cu, 1.06% Zn; including 135.75-142.00m, 6.25m, 11.43% ZnEq, 2.66 g/t AuEq, 1.63 g/t Au, 16.13 g/t Ag, 0.09% Cu, 4.79% Zn; including 144.80-149.00m, 4.20m, 2.01% ZnEq, 0.47 g/t AuEq, 0.12 g/t Au, 4.68 g/t Ag, 0.04% Cu, 1.31% Zn; including 158.30-159.35m, 1.05m, 3.73% ZnEq, 0.87 g/t AuEq, 0.16 g/t Au, 5.93 g/t Ag, 0.10% Cu, 2.73% Zn; including 175.50-177.70m, 2.20m, 4.11% ZnEq, 0.96 g/t AuEq, 0.79 g/t Au, 3.57 g/t Ag, 0.04% Cu, 1.04% Zn. TOM-25-011: 291.00-309.50m, 18.50m, 1.81% ZnEq, 0.42 g/t AuEq, 0.31 g/t Au, 1.97 g/t Ag, 0.01% Cu, 0.60% Zn; including 295.90-296.40m, 0.50m, 4.83% ZnEq, 1.12 g/t AuEq, 0.42 g/t Au, 5.40 g/t Ag, 0.04% Cu, 3.10% Zn; including 307.50-309.50m, 2.00m, 16.12% ZnEq, 3.77 g/t AuEq, 2.63 g/t Au, 9.47 g/t Ag, 0.05% Cu, 4.30% Zn; 341.00-342.00m, 1.00m, 2.83% ZnEq, 0.65 g/t AuEq, 0.07 g/t Au, 1.00 g/t Ag, 0.02% Cu, 2.59% Zn; 344.10-345.00m, 0.90m, 4.69% ZnEq, 1.09 g/t AuEq, 0.39 g/t Au, 3.50 g/t Ag, 0.04% Cu, 3.16% Zn. TOM-25-012: 283.85-285.00m, 1.15m, 5.51% ZnEq, 1.31 g/t AuEq, 0.71 g/t Au, 4.10 g/t Ag, 0.88% Cu, 0.02% Zn. TOM-25-013: No significant value. TOM-25-014: 185.00-187.10m, 2.10m, 24.85% ZnEq, 5.83 g/t AuEq, 4.94 g/t Au, 56.44 g/t Ag, 0.05% Cu, 4.55% Zn; 238.70-239.85m, 1.15m, 20.86% ZnEq, 4.86 g/t AuEq, 2.63 g/t Au, 22.20 g/t Ag, 0.16% Cu, 10.40% Zn; 251.20-252.60m, 1.40m, 36.34% ZnEq, 8.51 g/t AuEq, 7.44 g/t Au, 37.30 g/t Ag, 0.06% Cu, 8.04% Zn; 405.30-406.70m, 1.40m, 13.68% ZnEq, 3.17 g/t AuEq, 1.13 g/t Au, 13.15 g/t Ag, 0.07% Cu, 9.25% Zn; 423.30-426.30m, 3.00m, 2.15% ZnEq, 0.50 g/t AuEq, 0.07 g/t Au, 5.45 g/t Ag, 0.05% Cu, 1.57% Zn; 451.50-457.50m, 6.00m, 1.22% ZnEq, 0.28 g/t AuEq, 0.08 g/t Au, 3.45 g/t Ag, 0.01% Cu, 0.79% Zn. TOM-25-015: 132.55-141.00m, 8.45m, 3.73% ZnEq, 0.87 g/t AuEq, 0.51 g/t Au, 5.51 g/t Ag, 0.03% Cu, 1.66% Zn; 155.70-157.70m, 2.00m, 28.08% ZnEq, 6.56 g/t AuEq, 4.66 g/t Au, 26.90 g/t Ag, 0.07% Cu, 10.29% Zn; 182.10-202.20m, 20.10m, 2.20% ZnEq, 0.51 g/t AuEq, 0.36 g/t Au, 3.20 g/t Ag, 0.03% Cu, 0.77% Zn; 451.20-549.70m, 98.50m, 5.08% ZnEq, 1.19 g/t AuEq, 0.82 g/t Au, 3.21 g/t Ag, 0.04% Cu, 1.98% Zn; including 452.20-457.10m, 4.90m, 23.20% ZnEq, 5.44 g/t AuEq, 4.69 g/t Au, 18.80 g/t Ag, 0.29% Cu, 4.79% Zn; and including 500.35-549.70m, 49.35m, 6.46% ZnEq, 1.51 g/t AuEq, 0.90 g/t Au, 3.48 g/t Ag, 0.03% Cu, 3.13% Zn; including 521.00-535.60m, 14.60m, 9.07% ZnEq, 2.11 g/t AuEq, 1.34 g/t Au, 5.91 g/t Ag, 0.04% Cu, 4.12% Zn; including 537.85-541.10m, 3.25m, 9.00% ZnEq, 2.09 g/t AuEq, 0.88 g/t Au, 3.85 g/t Ag, 0.05% Cu, 5.82% Zn; including 542.00-548.20m, 6.20m, 13.39% ZnEq, 3.12 g/t AuEq, 1.63 g/t Au, 5.26 g/t Ag, 0.05% Cu, 7.43% Zn. The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles. ZnEq and AuEq are calculated using the Company’s standard parameters. AuEq calculation was based on USD 4,150/oz Au, USD 51.34/oz Ag, USD 5.023/lb Cu and USD 1.392/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023), applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper. ZnEq calculation was based on USD 4,047/oz Au, USD 50.22/oz Ag, USD 4.796/lb Cu and USD 1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) /10,000, applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper. TomaGold has released two graphics which illustrate the drill target and proposed drill hole extensions. TomaGold 1,500-metre Phase 2 drilling program aimed at testing the newly discovered Berrigan Deep Zone.