공시 • Mar 21
Vulcan Energy Resources Limited, Annual General Meeting, May 28, 2026 Vulcan Energy Resources Limited, Annual General Meeting, May 28, 2026. 공시 • Jan 22
Vulcan Energy Resources Limited Successful Production Test Results from First New Lionheart Well Vulcan Energy Resources Limited has announced successful production test results from its first new Lionheart well, LSC-1bsidetrack, as part of the Phase One Lionheart Project Field Development Plan (FDP) in Germany’s Upper Rhine Valley Brine Field. The production test confirmed strong well deliverability, with a potential production capacity range of 105 to 125 liters per second (l/s), supporting the Phase One FDP's average well production of approximately 84 to 94 l/s. This development enhances confidence in the subsurface conditions and supports the ongoing construction and execution of the project, which aims to produce 24,000 tonnes of lithium hydroxide monohydrate annually by 2028. The project is fully funded following the securing of project financing in December 2025 and is expected to provide a strategic source of lithium for the European battery and electric vehicle industry. 공시 • Dec 04
Vulcan Energy Resources Limited has filed a Follow-on Equity Offering in the amount of AUD 1.073309 billion. Vulcan Energy Resources Limited has filed a Follow-on Equity Offering in the amount of AUD 1.073309 billion.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 61,327,226
Price\Range: AUD 4
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 116,000,000
Price\Range: AUD 4
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 58,000,000
Price\Range: AUD 4
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 33,000,000
Price\Range: AUD 4
Transaction Features: Rights Offering; Subsequent Direct Listing 공시 • Jul 11
Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 53.6 million. Vulcan Energy Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 53.6 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 5,764,706
Price\Range: AUD 3.4
Discount Per Security: AUD 0.119
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 10,000,000
Price\Range: AUD 3.4
Transaction Features: Subsequent Direct Listing 공시 • Jul 08
Vulcan Energy Resources Limited Announces Update on Lithium Brine Resource Estimation Vulcan Energy announced that following a 3D seismic survey, it has successfully completed an updated lithium brine Resource estimation, together with a maiden geothermal energy Resource estimation, for the Mannheim licence area of Germany's Upper Rhine Valley Brine Field (URVBF). The lithium brine Resource estimation update for the Mannheim sector estimates the total lithium brine Resource (Indicated and Inferred) has increased from 1,833kt LCE @ 153 mg/Li to 3,225kt LCE @ 155 mg/Li, which is an increase of 1,392kt LCE. A large-scale in place maiden geothermal Resource of 2,848 PJ (Indicated) and 10,539 PJ (Inferred) has also been estimated for the Mannheim sector of which 171 PJ (Indicated) and 377 PJ (Inferred) are considered recoverable. The Company intends to continue to complete geothermal energy Resource estimations under the Australian Geothermal Reporting Code for all its development areas within the URVBF, to better assist with investors' understanding of the scale of the URVBF geothermal potential. Vulcan is progressing a Scoping Study for the Mannheim licence which is located 40km to the northeast of Phase One. The study will look to add further production in addition to the Phase One integrated lithium and geothermal renewable energy development including expansion of the downstream lithium hydroxide monohydrate (LHM) facility in Industrie-Park Hochst. It is envisaged Vulcan will deliver baseload geothermal heat from the Mannheim region geothermal resource to the district heating network of MVV Energie AG (MVV), one of Germany's leading energy companies, while simultaneously extracting sustainable lithium for EV battery production. This lithium brine Resource estimation update, and maiden geothermal energy Resource estimates, both for the Mannheim region of Germany's URVBF, is based on a Competent Person's Report prepared by GLJ Ltd. as Competent Person (CP) for the Company (Report). The Mineral Resource Estimation for the Indicated Resource classification is 820 kt LCE and for the Inferred Resource classification is 2,405 kt LCE for the Mannheim licence per Table 1. The report provides the reporting of Geothermal Resource estimation for the Mannheim licence area, in accordance with the Australian Code for Reporting of Exploration Results, Geothermal Resources and Geothermal Reserves, ("Geothermal Reporting Code" or "GRC"), Second Edition (2010), developed by the Joint Committee of the Australian Geothermal Energy Group ("AGEG") and the Australian Geothermal Energy Association ("AGEA") as well as the supporting Geothermal Lexicon for Resources and Reserves Definition and Reporting ("Geothermal Lexicon"), Edition 2, compiled by Lawless, J. for The Geothermal Code Committee. Additionally, due to newly acquired data in the Mannheim licence area, there is an update provided on Lithium Mineral Resource estimation for the Mannheim license in this announcement. Geothermal Resource Estimation is reported for the Mannheim licence, which is part of a future phase of development, described as Mannheim Sector or Mannheim licence area in the report. Phase One of the Project plans for a central surface facility for geothermal energy and lithium extraction, where the integrated facilities are referred to as the geothermal and lithium extraction plant ("GLEP"), which will be fed from a number of multi-well pads. The information in this announcement that relates to estimates of Mineral Resources (other than the update to the Mannheim region of the URVBF as contained in this announcement) and Ore Reserves is extracted from the following ASX announcement: Zero Carbon Lithium Lithium Lithium LithiumTM Project Phase One Briding Project Phase One Briding Project plans for the Mannheim licence area.