공시 • Oct 14
High-Tech Metals Limited, Annual General Meeting, Nov 27, 2025 High-Tech Metals Limited, Annual General Meeting, Nov 27, 2025. 공시 • Aug 27
High-Tech Metals Limited has completed a Follow-on Equity Offering in the amount of AUD 1 million. High-Tech Metals Limited has completed a Follow-on Equity Offering in the amount of AUD 1 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 2,489,271
Price\Range: AUD 0.15
Security Features: Attached Options
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 4,177,394
Price\Range: AUD 0.15
Security Features: Attached Options
Transaction Features: Rights Offering 공시 • Apr 12
High-Tech Metals Limited Completes A Review of Exploration Potential Within the Mt Eureka Project Area High-Tech Metals Limited announced that it has completed a review of exploration potential within the Mt Eureka Project area. HTM is progressing approvals and aggressively expanding its exploration footprint to test these significant targets. High-Tech recently entered a legally binding term sheet to acquire 100% of Rox Resources Limited's interest in the Mt Fisher Gold Project and acquire 51% of the Mt Eureka Gold Project, in the highly prospective Northern Goldfields region of Western Australia. Completion under the Term Sheet is subject to certain conditions, including necessary shareholder approvals which the Company will seek at the upcoming general meeting on 28 April 2025. Mt Fisher and Mt Eureka Gold Project: The Project is in the Northern Goldfields, approximately 500km northeast of Kalgoorlie and 120km east of Wiluna within the Mt Fisher greenstone belt, which is located 40km east of the prolific Yandal greenstone belt, host of significant gold deposits including Jundee, Bronzewing and Milrose). The total consolidated land package is 1,150 km2. The total Indicated and Inferred Mineral Resource for the Mt Fisher - Mt Eureka Gold Project is 3.5Mt @ 1.65g/t Au for 187koz of contained gold. The Company confirms that it is not aware of any new information or data that materially affects the information included in this announcement and all material assumptions and technical parameters underpinning the Mineral Resource Estimate included in this announcement continue to apply and have not materially changed. Mt Eureka Project: The Project is located within the Dingo Range - Mt Eureka greenstone belt, approximately 45km east of and parallel to the Yandal Belt. The north-trending Archaean greenstone belt hosts predominantly mafic and ultramafic volcanics, and meta-sediments with mafic and ultramafic assemblages through the central and eastern parts of the tenement holding, with minor inter-bedded cherts. The greenstone belt is flanked by granitic/gneissic bodies to the west and east. The Mt Eureka greenstones occur as a sequence of tightly folded north-trending mafic and ultramafic units; shearing appears to have off-set the fold axes in several places. Northerly and north-northeast trending shears occur within the belt and are continuous over considerable strike lengths. Later northwest and northeast trending, dextral, strike-slip faulting has occurred between the major shear zones. Within the project area, exposures of unweathered Archaean bedrock are sparse. Much of the area is covered with ferruginous float and lag on a veneer of soil and hardpan, overlying transported colluvium and alluvium, that is overlying an erosional lateritic profile. There is a well-developed regolith profile throughout the project area. Outcrop of ultramafic rocks is limited to rare and sub-cropping occurrences of weathered talc-chlorite schist. Southern and Galway: The Galway-Southern gold system is controlled by stratigraphic N-S contacts, NE and NW faults and a set of felsic intrusives. Gold mineralisation is related to both supergene zones and high-moderate angle, sheared contacts of felsic volcaniclastics/intrusives with mafics/ultramafics. Highlights from drilling at the Southern and Galway prospects include 3m @ 0.95g/t Au from 37m, and 13m @ 6.81g/t Au from 45m including 1m @ 31.25g/t Au and, 4m @ 2.59g/t Au from 67m (MFRC075); 7m @ 0.96g/t Au from 85m and, 9m @ 6.20g/t Au from 98m and, 15m @ 0.67g/t Au from 126m (MERC075); 9m @ 1.95g/t Au from 46m and, 15m @ 1.28g/t Au from 62m (MERC062); 13m @ 2.20g/t Au from 38m (MEAC130); 8m @ 10.62g/t Au from 54m including 1m @ 80.54g/t Au (MEAC14); 4m @ 5.28g/t Au from 50m including 1m @ 11.50g/t Au and, 16m @ 4.41g/t Au from 109m including 1m @ 52.73g/t Au (MERC074). Mt Eureka: Gold mineralisation is related to quartz veining and shearing in mafics associated with the granite-greenstone contact. Primary gold mineralisation strikes north-northeast, dips east and plunges moderately south. Significant additional potential exists at depth down the plunging high-grade shoot. The Eureka project has only limited drilling with the gold results summarised. 11m @ 2.34g/t Au from 68m, including 1m @ 6.41g/t Au from 73m (MERC055); 2m @ 5.18g/t Au from 6m and, 3m @ 1.57g/t Au from 24m and, 2m @ 1.29g/t Au from 32m (MFRC073); 10m @ 0.39g/t Au from 67m and, 18m @ 0.89g/t Au from 97m (MERC079); 4m @ 2.96g/t Au from 29m (YRB175); 24m @ 0.51g/t Au from 12m (YRC07) HTM plan to test the interpreted shear zone associated with the granite-greenstone contact along the Eureka gold trend to develop additional new greenfield targets. 공시 • Sep 20
High-Tech Metals Limited, Annual General Meeting, Nov 14, 2024 High-Tech Metals Limited, Annual General Meeting, Nov 14, 2024. Board Change • May 02
No independent directors Following the recent departure of a director, there are no independent directors on the board. The company's board is composed of: No independent directors. 3 non-independent directors. Company Secretary & Non-Executive Director Quinton Meyers was the last director to join the board, commencing their role in 2023. The company's lack of independent directors is a risk according to the Simply Wall St Risk Model.