공시 • Apr 11
Maronan Metals Limited Reports the Final Batch of Assays from the 2024 Drilling Campaign Which Concludes in December
Maronan Metals reported the final batch of assays from the 2024 drilling campaign which concluded in December. There are several high-grade zones of copper-gold mineralisation within the shallow Starter Zone that may present early mining options. Results continue to demonstrate strong continuity of silver-lead mineralisation along the Eastern Horizon. QAQC is checked on import, and issues identified are recorded in Maronan's QAQC register., No adjustments are made to the raw assay data reported from the laboratory., Location of data points, Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation., Specification of the grid system used., Quality and adequacy of topographic control., All drill collars for the 2024 program at Maronan have been picked up by a licensed surveyor using an RTK-GPS in MGA94 Zone 54S coordinates., Topographic relief has been surveyed with a lidar survey completed of the project area with a vertical accuracy of +/-4cm, Downhole surveys are completed with an Axis north seeking gyroscope., Data spacing and distribution, Data spacing for reporting of Exploration Results., Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied., Whether sample compositing has been applied., Data spacing across the project is variable from approximately 200m x 200m to as close as 30m x 30m within some areas of the Starter Zone., In areas of more closely spaced drilling (~ 50 x 50m or closer), geological and grade continuity is sufficient to classify indicated confidence resource. Where drill spacing is wider, resource confidence is inferred., The drill pierce point spacing is sufficient to outline the structural geometry, broad extent of mineralisation and grade variations in the mineral system and is of sufficient spacing and distribution to inferred a Mineral Resource., No sample compositing has been applied to results reported in this report, Criteria, JORC Code explanation, Commentary, Orientation of data in relation to geological structure, Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type., If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material., Silver-Lead mineralisation at the Maronan Project is hosted within a folded sequence of metamorphosed sedimentary rocks. In this instance the value of $0.804, The formula calculates the value of the recoverable metal for Lead and Silver and divides with by the value of 1gm Silver to calculate the Silver Equivalent value, Criteria, JOR C Code explanation, Commentary, Orientated calculation does not take into account any assumptions about payability, treatment costs or refining costs, Relationship between mineralisation widths and intercept lengths, These relationships are particularly important in the reporting of Exploration Results., If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported., If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known'). Drill holes are interpreted to have intersected the mineralisation at an appropriate intersection angle., Modelled zones of mineralisation at the Maron an appropriate intersection angle., Modelling zones of mineralisation at theMaronan Project strike approximately 010 and dip ~ 70W., Estimated True widths are reported in Significant Intercept Table 1 of the report and are discussed above in Section1 of the table, Diagrams, Diagrams, Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported. These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views., Plan view, Plan view, cross sectional views., Plan view. Plan view, cross sectional and long section views are included within the body of the body of the body of The ASX release, Balanced reporting, Balanced reporting, Balanced reporting. Where comprehensive reporting of all Exploration Results. Where comprehensive reporting of all exploration results is not practicable, Where comprehensive reporting of all Exploration results is not practicable, representative reporting of all Exploration Results is not practicable, representative reporting.