Annuncio • Apr 23
A2gold Corp Commences Core Drilling At Eastside Gold-Silver Project A2Gold Corp. announced the commencement of diamond core drilling at its flagship Eastside Gold-Silver Project in Nevada. The fully funded and approximately 2,500 metre program is designed to support mineral resource definition and potential expansion. The diamond core drill rig has mobilized to site and drilling is underway in the Castle area, located in the southern portion of the Eastside District. This program has been designed with the following objectives: To integrate with and support the Company's ongoing RC drilling program by providing higher-quality geological and structural information. To target areas with the potential to improve geological confidence and contribute to the delineation and potential expansion of mineral resources. To better define lithological units, alteration, structural controls, and the continuity of mineralization. To collect representative geological, geotechnical, and metallurgical data to support future resource estimation and modeling. The Company has completed eleven RC drill holes, including one core pre-collar, as part of its current exploration program. Drilling has primarily targeted new areas generated from recent geophysical surveys, geological mapping, surface geochemistry, and reinterpretation of historical datasets. Results are pending. The current program has utilized a track-mounted RC rig thus far. To improve drilling efficiency and to achieve planned depths, the Company intends to transition to a truck-mounted RC rig, which is expected to arrive on-site within approximately 60 days. Upon arrival, RC drilling is expected to continue systematic testing of exploration targets across the District. Upon completion of the current diamond core drilling program, the Company intends to update the mineral resource estimate for the Eastside Project in accordance with National Instrument 43-101. The updated resource is expected to incorporate data from both the diamond core and RC drilling programs, with the objective of improving resource confidence and evaluating the potential for expansion of the existing mineral resource. Annuncio • Mar 18
A2 Gold Corp. Identifies District Scale Antimony Potential At the Taylor Silver-Gold Project in Nevada A2 Gold Corp. reported evidence of a district scale gold-antimony mineralized system across its recently acquired Taylor Silver-Gold Project located in White Pine County, Nevada. Recent technical reviews and compilation of historical data indicate that the Taylor district hosts widespread antimony mineralization spatially associated with gold mineralization. Antimony is classified as a critical mineral by the United States government due to its strategic importance and limited domestic supply. Historical mining records and modern exploration work indicate that anomalous antimony mineralization occurs across a large portion of the Taylor district, covering an area of approximately 10 km². Antimony was first discovered in the Taylor district in 1914. Two historical antimony-producing mines occur within the Taylor land package: the Enterprise Mine and Merrimac Mine. The Enterprise Mine operated during the late 1930s through the early 1940s. The Merrimac Mine operated during the late 1950s through the early 1960s. Historical records indicate the Enterprise Mine produced sorted, high-grade antimony mineralization with reported grades ranging from approximately 39% to 76% Sb. Historical drill results at the Merrimac Mine returned several significant intercepts, including: 7.01% antimony over 4.3 metres starting 4.3 metres from surface, 4.61% antimony and 0.53 g/t gold over 4.6 metres starting 4.6 metres from surface, 3.79% antimony over 5.5 metres starting 3.0 metres from surface, 3.34% antimony over 11.6 metres starting 3.0 metres from surface. Recent surface channel samples collected on the property returned high-grade antimony mineralization, including samples grading 18.4% and 21.6% antimony, further demonstrating the strength of the mineralized system. Geological work at Taylor indicates that antimony mineralization is closely associated with gold mineralization across the district. Gold exploration completed to date at Taylor has identified: a 3 km by 10 km corridor of anomalous gold defined by surface and soil sampling, channel samples returning up to 4.2 g/t gold over 11 metres, including 7.1 g/t gold over 3.3 metres, drill intercept from SPT-66 including 1.02 g/t gold over 18.3 metres starting at surface. Geological observations suggest the antimony and gold mineralization may represent different expressions of the same mineralizing system, though additional drilling is required to confirm this relationship. Their close spatial association provides an opportunity to target both metals through future drilling. Interest in antimony exploration in Nevada has increased significantly in recent years due to its classification as a U.S. critical mineral and the limited number of domestic projects capable of supplying it. Several exploration companies operating in Nevada have recently reported antimony mineralization associated with gold systems, highlighting the growing recognition of the region's potential for antimony-bearing deposits. A2Gold is currently designing a 2026 exploration program that will test several high-priority antimony targets identified across the district. Drilling of antimony mineralization will be conducted in conjunction with drilling programs targeting gold mineralization, as both appear to be part of the same mineralized system. The Company intends to: drill-test priority antimony targets identified through geochemistry and geophysics, evaluate the relationship between antimony and gold mineralization, assess the potential for antimony mineralization to be incorporated into future resource estimates. Results from this work may support evaluation of antimony mineralization for potential inclusion in future resource studies, subject to sufficient drilling and technical work. The planned updated NI 43-101 resource estimate for the Taylor Project currently will focus on expanding and updating the gold and silver resources while evaluating additional metals present within the system. John Marma is a Certified Professional Geologist (CPG) with the American Institute of Professional Geologists and is the Qualified Person under NI 43-101, Standards of Disclosure for Mineral Projects, who has reviewed and approved the scientific and technical content of this press release. Annuncio • Mar 14
A2 Gold Corp. Outlines 2026 Exploration Plans to Expand Silver and Gold Resources At the Taylor Project A2 Gold Corp. provided an update on exploration plans for its recently acquired Taylor Gold-Silver Project located in White Pine County, Nevada. Following the announcement on March 6, 2026, to acquire the Taylor Project, the Company is preparing an aggressive 2026 drill program designed to expand the known silver mineralization and test the gold potential identified across the district. The Company is currently designing a multi-phase drilling program for 2026 aimed at rapidly advancing the Taylor Project. The initial exploration strategy will focus on three key objectives: Planned drilling will focus on testing extensions of known silver mineralization along strike and at depth, targeting areas where geological mapping, historical drilling and structural interpretations indicate potential for additional mineralization. Extension drilling will be focused on evaluating high-grade structural trends beyond the currently defined mineralization footprint. The goal of this program is to expand the existing resource footprint. Results from the drill program will support preparation of a modern NI 43-101 compliant resource estimate incorporating updated geological and structural interpretations, improved understanding of mineralization controls and current metal price assumptions. Drilling will also test several high priority targets within a 3km x 10km district-scale anomalous gold corridor, highlighting the significant exploration potential of the project. The corridor hosts gold anomalies continuously >0.1g/t gold associated with geological formation contacts and structures. Initial drilling will focus on testing targets where geological mapping and geochemical data indicate potential for near-surface oxide gold mineralization. The initial drill program will be designed to quickly evaluate the scale and grade potential of the system while prioritizing targets with the greatest potential for rapid discovery and growth. The Taylor Project is fully permitted and drill-ready, allowing the Company to move quickly toward drilling. The Taylor Project hosts a historical mineral resource estimate prepared by SRK Consulting in 2018 outlining approximately: 11.0 million ounces of silver in the Measured and Indicated category, 0.6 million ounces of silver in the Inferred category. This estimate was calculated using a silver price assumption of USD 17 per ounce and a cutoff grade of 1.6 oz/t silver. Historical drilling indicates the silver mineralization remains open in multiple directions and has not been systematically tested using modern exploration techniques. Silver price sensitivity analysis completed by SRK demonstrates that the mineralized system could host significantly more silver. Using a USD 30 per ounce silver price and a 0.9 oz/t cutoff, the Measured, Indicated and Inferred resource could represent more than 20 million ounces of silver in total. Table 1: Mineral Resource Sensitivity: Measured and Indicated Resources; Inferred Resources Measured and Indicated Silver (USD/oz) Cutoff Grade (oz/t) ktons Silver (oz/t) Contained Silver koz USD 17.00 1.6 3,789 2.89 10,995 USD 20.00 1.3 5,084 2.56 13,013 USD 25.00 1.1 6,591 2.30 15,170 USD 30.00 0.9 8,755 2.04 17,883 Inferred Silver (USD/oz) Cutoff Grade (oz/t) Tons Silver (oz/t) Contained Silver koz USD 17.00 1.6 803 3.35 603 USD 20.00 1.3 397 2.86 1,135 USD 25.00 1.1 595 2.51 1,492 USD 30.00 0.9 1,343 1.98 2,662 In addition, most historical drilling that defined the resource was relatively shallow, with many holes terminating at depths of approximately 135 meters (500 feet), suggesting the system may extend further both laterally and at depth. In addition to the silver resource, Taylor hosts significant oxide gold mineralization across a large portion of the district. Exploration to date has identified: Surface sampling defining a 3km x 10km anomalous gold corridor, Channel samples returning up to 4.2 g/t gold over 11.0 meters, including 7.1 g/t gold over 3.3 meters, SPT-66 intersected 1.02 g/t gold over 18.3 meters starting at surface, SPT-65 intersected 0.68 g/t gold over 24.4 meters starting at surface including 0.85 g/t gold over 12.2 meters. Annuncio • Mar 10
A2 Gold Corp., Annual General Meeting, May 06, 2026 A2 Gold Corp., Annual General Meeting, May 06, 2026. Location: british columbia, vancouver Canada Annuncio • Feb 11
A2 Gold Corp. Announces Appointment of Gabe Kassos as Chief Geologist, Effective February 9, 2026 A2 Gold Corp. announced the appointment of Gabe Kassos as Chief Geologist, effective February 9, 2026. Gabe Kassos is a geologist with over 20 years of experience in mineral exploration and mining, with deep expertise in Nevada-style gold systems and a proven track record of generating value through brownfields exploration, resource growth, and mine life extension. His experience spans multiple gold deposit types including Carlin-type, disseminated- and vein-type epithermal, orogenic, and skarn deposits, with project experience across the United States, Canada, Mexico, and Brazil. Most notably, Mr. Kassos spent a meaningful portion of his career working in the Great Basin of Nevada, including with Newmont Mining on the Carlin Trend and at the Long Canyon project, where he developed a strong technical foundation in one of the most prolific gold districts globally. Prior to joining A2 Gold, Mr. Kassos most recently served as Director, Exploration & Geology for Equinox Gold, where he provided technical and strategic leadership across the company's exploration portfolio. During his tenure, he played a key role in delivering a significant mine life increase at the Fazenda Brasileiro Mine and advancing brownfields discoveries at the Los Filos Mine Complex, underscoring his ability to unlock value at both operating mines and advanced-stage assets. Earlier in his career, Mr. Kassos held senior exploration roles with OceanaGold at the Haile Mine and Klondex Gold & Silver at the Fire Creek Mine, where he was responsible for multiple brownfields discoveries and substantial resource expansions. His experience consistently demonstrates a focus on disciplined targeting, high-impact drilling, and value creation through geology-driven exploration. Mr. Kassos holds a Bachelor of Science in Geology and a Master of Science in Structural Geology from Auburn University. He is a Certified Professional Geologist with the American Institute of Professional Geologists (CPG-11686). He is also a long-standing member of the Geological Society of Nevada and the Society of Economic Geologists. Annuncio • Jan 27
A2Gold Corp. Commences 30,000-Metre Drill Program at Eastside Gold-Silver Project A2Gold Corp. announced the commencement of its fully funded 30,000-metre reverse circulation drill program at its Eastside Gold Project, located in Nevada, USA. The drill program represents a significant expansion from the Company's previously announced 18,000-metre program and is designed to systematically advance and grow the existing resources while testing multiple high-priority targets across the broader Eastside land package. Drilling is expected to continue throughout the year, subject to results and operational conditions. The 2026 drill campaign will focus on step-out and infill drilling in areas of known mineralization, as well as exploration drilling aimed at testing new targets generated through geological mapping, geophysics, and recent reinterpretation of historical data. The expanded program reflects A2 Gold's strong technical conviction in the Eastside project and the Company's robust financial position. The start of this 30,000-metre drill program marks an important milestone for A2 Gold and underscores the commitment to aggressively advance Eastside. With a strong balance sheet and the program fully funded, the program fully funded, the company expects to be drilling consistently throughout the year. The drill program is being overseen by A2 Gold's technical team and will be executed using multiple RC rigs to ensure steady progress and efficient delivery of results. Assay results will be released as they are received, analyzed, and validated. The Eastside Gold-Silver Project is located in Esmeralda County, Nevada, approximately 20+ miles northwest of Tonopah, within the prolific Walker Lane Trend. The project hosts a current inferred resource of 1.4 million ounces of gold and 8.8 million ounces of silver, with mineralization open in all directions. Eastside covers a 92 km2 land package that includes multiple high-priority zones such as McIntosh, Castle, and other exploration targets yet to be named.