Anuncio • Jan 08
Stellar Africagold Inc. Updates Drilling Activities At the Tichka Est Gold Project, Morocco Stellar AfricaGold Inc. provided the following update on the exploration and drilling program at Tichka Est Gold Project in the High Atlas of Morocco. Summary of drilling progress to December 12, 2025: 8 diamond drill holes completed, totaling 1,311.9 Metres. Average drilling rate of 11 meters per operating day. Since December 12, 2025, drilling operations have been suspended due to exceptional inclement weather conditions, including heavy rains and repeated snowfalls in the area of the project. Status of drill holes: 5 drill holes have been fully sampled and assayed, including TCK1 (See news release October 2, 2025 for details of TCK1 assay results), which intersected multiple gold-bearing intervals (13 meters of 6.12 g/t Au including 2 meters of 22.28 g/t Au, and16 meters of 1.98 g/t Au including 1 meter of 11.55 g/t Au). Assay results are being reviewed and analyzed. 1 drill hole has been sampled and is currently at Afrilab, an ISO-certified laboratory in Marrakech, for analysis. Cores from 2 drill holes are pending transport from Tichka Est project site to Afrilab for analysis. 2 final drill holes remain to be drilled which will complete the planned 1,500 meters drill program. All pending assays results will be released once they are received, validated, compiled, analyzed and integrated into the geological working model. About the weather-related delay. Notwithstanding the 2,500 meters elevation of the Tichka Est Gold Project, these adverse weather conditions over this length of time are relatively unusual events for this area of Morocco. However, the significant rains and snow have impaired access to the Tichka Est project site and infrastructure, specifically: Access roads to the drill site have been degraded and rendered impassable interrupting safe access for personnel, equipment and water supplies, and support logistics. Despite the diligent and ongoing efforts by the Stellar field team to rehabilitate and stabilize the road network during this period, progress has been repeatedly interrupted by new episodes of rain and snow, leading to additional closures of key access routes. Stellar's priority remains the safety of personnel and the integrity of equipment. The Company continues to monitor conditions closely and will resume drilling operations as soon as weather conditions improve, and safe access and operations is assured. Over the coming weeks, the Company will: 1. Resume drilling as soon as weather permits and access roads have been rehabilitated., 2. Continue the integration of all drill assays and structural measurements, and 3.4. Prioritize targets for the next drill campaign. Anuncio • Nov 17
Stellar AfricaGold Inc., Annual General Meeting, Jan 20, 2026 Stellar AfricaGold Inc., Annual General Meeting, Jan 20, 2026. Anuncio • Nov 07
Stellar AfricaGold Inc. announced that it has received CAD 4 million in funding On November 6, 2025. Stellar AfricaGold Inc. announces that it has closed the transaction. Two directors of the company subscribed for an aggregate of 677,545 units and gross proceeds of CAD 121,958.10 under the offering Anuncio • Oct 16
Stellar AfricaGold Inc. announced that it expects to receive CAD 4 million in funding Stellar AfricaGold Inc announced a non-brokered private placement to issue 22,222,222 units at an issue price of CAD 0.18 fr the proceeds of CAD 3,999,999.96 on October 15, 2025. Each unit will consist of one common share of the company and one-half of one transferable common share purchase warrant. Each warrant will entitle the holder to acquire one additional common share of the company at a price of CAD 0.28 for a period of 36 months from the date of issuance. The offering is expected to close on or about October. 30, 2025, and is subject to certain conditions, including, but not limited to, the receipt of all necessary approvals including the approval of the TSX Venture Exchange. All securities issued under this offering will be subject to a statutory hold period of four months and one day from the closing date, in accordance with applicable Canadian securities laws. The company may, in its discretion, pay finders' fees in cash and/or warrants to eligible arm's-length parties in connection with the offering, as permitted by applicable laws and TSX-V policies. Insiders of the company may participate in the offering. Anuncio • Oct 03
Stellar Africagold Inc. Reports Significant Assay Results from Its First Drill Hole At the Tichka Est Gold Project Stellar AfricaGold Inc. reported significant assay results from its first drill hole at the Tichka Est Gold Project, part of the ongoing 1,500-meters summer diamond drill program at the Zone B gold discovery, an area of approximately one square kilometer within Stellar's 82km2 permit area in Morocco. Detail of Results: Diamond drill hole TCK-001 was designed to test the interpreted mineralized sub-horizontal diorite sills, which act as both lithological and structural controls to gold mineralization. Two well-defined mineralized zones were intersected: Within Diorite 1 between 8399 meters: 16 m of 1.98 g/t Au, including 1 m of 11.55 g/t Au· Within Diorite 2 between 125138 meters: 13 m of 6.12 g/t Au, including 2 m of 22.28 g/t Au· Within Diorite 3 the mineralization encountered in previous surface trenching of the third diorite zone was not encountered in drill hole TCK-001 consistent with the absence of veining or fracturing in the core. These intersections support the geological model developed for Tichka Est Zone B and provide strong encouragement for expansion of the drilling program. Operations Update: Diamond drilling has now totaled 492.8 meters across three holes, with core from holes TCK-002 and TCK-003 confirming the presence of the sulphide-bearing sub-horizontal diorite sills previously encountered in hole TCK-001. Drilling is progressing at an average rate of approximately 10.5 meters per day. Recently progress was temporarily hampered by fractured zones down hole requiring cementing to reduce water loss, on site water supply logistics, and weather-related impacts requiring repairs to roads and drill platforms. Despite these operational challenges, drilling continues steadily, with excellent core recoveries achieved. Next Steps: Continue drilling the planned 1500-meters diamond drill program to test lateral continuity and down-dip extensions of sulphide-bearing sub-horizontal diorite sills, and Update geological, structural, and alteration models with new data. Continue reconnaissance exploration throughout the Tichka Est Gold Project 82 km2 permits area. Anuncio • Jul 11
Stellar Africagold Inc. Confirms Summer Drill Program At Promising High-Grade Gold Target At Structure B Stellar Africagold Inc. reported significant progress at its Tichka Est Gold Project in Morocco's Western High-Atlas. Recent field activities, including structural mapping, advanced 3D modeling and surface sampling with grades up to 102 g/t Au have confirmed priority drill targets. Supported by recently extended access road construction and drill platform development Stellar's summer drilling campaign is ready to launch. Summer 2025 Drill Program. Stellar is initiating a 10 hole 1,500-metre diamond drill program at Tichka Est's Structure B in July 2025. The program will test four primary targets: Lateral and down-dip continuity of the MT1 sill-hosted mineralization. High-grade NE shear-hosted shoots. Depth extensions of trench 7B dyke and potential parallel dykes eastward. Structure B is currently the most advanced target at the Tichka Est Project, characterized by the presence of three mineralized horizons and at least two shear zones. Structural mapping and sampling indicate a complex deformation system controlling gold mineralization, including conjugate shears and NE-trending fault corridors. High-grade gold has been intersected in both dioritic sills and intrusive dykes, with mineralized shoots interpreted to plunge gently to the north-northeast. These geological features, along with the scale and continuity of mineralization observed to date, position Structure B as the principal focus of the upcoming diamond drill program. Structural Interpretation and Target Confirmation. A detailed structural interpretation at Structure B completed in the spring of 2025 and supported by external geological expertise, on-site geological mapping and digital 3D modeling, has provided additional clarification of the controls of the gold mineralization. Despite complex faulting, deep intercepts suggest continuation of the system at depth; drilling will focus on testing NE-trending brittle structures and gently NE-dipping shear corridors. Structural mapping indicates that steeply W-dipping fractures and NE shears control high-grade mineralized shoots, and that carbonate-sill contacts and dykes similar to those identified in trench 7B may host additional gold mineralization along the hinge of the anticline. Drill Program Preparation. Construction of new access roads and drill-platforms is continuing. Road construction is challenging due to areas of hard limestone and the generally steep, rugged topography, both of which contributed to slower than initially projected progress. Despite these adverse working conditions steady progress was made, and several drill platforms are now complete and ready for the scheduled July 2025 drill campaign. Mobilization activities are in process and drilling is expected to start this month. Over the past three years the Tichka Est Gold Project has been the subject of considerable mapping, sampling, trenching and an initial exploratory RC drill program. Three gold mineralized structures, designated Structures A, B and C in historical order of discovery, were identified by this early exploration. At Structure B a significant mechanical trench MT1 assayed 3.5 g/t Au over 155.7 metres length determined that Structure B should be the primary target for the Company's next drill campaign. Anuncio • Jul 08
Stellar AfricaGold Inc. Completes 11 New T Tichka Est Gold and Base Metals Project, Morocco Stellar AfricaGold Inc. announced the completion of eleven new trenches on the Tichka Est Gold and Base Metals Project in Morocco. The general area of the Tichka Est project, which is in the High Atlas Mountain region approximately 160-kilometres southwest of Marrakech, is accessible by existing well-maintained national roads, Stellar is planning the construction of a new road to allow exploration vehicles and drill equipment to access the specific drill ready structures at Zones A and B of the Tichka Est permits. As previously announced, exceptionally steep terrain and hard rock required that the access road to drill-ready Zones B and A gold structures be re-routed including making applications for additional road construction permits. Permitting for the new road construction is advancing well and now that proposed route has been accepted in principle detailed surveying of the proposed route will be conducted in the coming weeks. The initial trenching of the Zones B and A gold structure during Second Quarter of 2021 reported numerous mineralized intersections with grades as high as 3.36 g/t Au over 10.0 meters including an interval of 8.73 g/t Au over 3.0 meters in Zone A, and 4.55 g/t Au over 15 meters including an internal of 7.47 g/t Au over 6.0 meters in Zone B. These very encouraging surface results greatly justified the positioning of new infill and extension trenches. To get a better surface definition of both A and B structures before drilling, Stellar mandated a geological crew consisting of one senior and one junior project geologists and some local labourrers to dig 8 new trenches totaling 160 linear meters across the B structure and 3 new trenches totaling 60 linear meters across the A structure. Each trench was channel sampled mechanically on its entire length with a rock saw and 1 metre intervals samples were bagged and send to laboratory. 200 samples have already been collected and sent to AFRILAB Laboratory of Marrakech for gold analysis. The objective of this program is to seek the lateral extensions of both the A and B zones, and to confirm the grades consistency along these two structures before planning the drill program. The results of this trench sampling program will be announced as soon as assays are received, reviewed and compiled by Dr. Saquaque. The geological crew has been based in the nearby village of Analghi which is the most convenient place from which to access the A and B mineralized structures and can provide all necessary facilities to accommodate the crew. The village also has sufficient local laborers necessary for the execution of an expanded exploration program. The geological team before the expanded tranching program was under the direct supervision of Stellar's technical advisor Dr. Ali Saquaque in Marrakech and of Stellar director Yassine Belkabir who is also a Senior Technical Advisor and Qualified Person for Stellar AfricaGold. Anuncio • Apr 17
Stellar AfricaGold Inc. Starts Work At Tichka Est Gold Project, Morocco Stellar AfricaGold Inc. announced that work has started at the Tichka Est Gold Project in Morocco. Tichka Est 2025 Exploration Program. The Company has launched its 2025 exploration program at its TichkaEst Gold Project in the High Atlas Mountain region of Morocco. The first step in the 2025 program is rehabilitating the access road that was damaged in the 2024 earthquake in Morocco. The access road winds for 8.5 kilometers from Analghi village at the 1,890-meter level to the Zone B gold discovery zone at 2,500 meters elevation. A contractor has been engaged, its heavy equipment has been mobilized, and the rehabilitation work has commenced. The Zone B gold discovery is a N80deg trending gold structure extending for over two kilometers along strike. It lies along a highly sheared contact of limestone and schist that is injected by quartz-ankerite-calcite veins and veinlets with traces of pyrite, chalcopyrite and arsenopyrite. Following completion of the access road rehabilitation the Company will initiate a mechanical trenching campaign to follow up on previous trenching at Zone B which yielded 3.5 g/t Au over 155.7 meters.1 Among other targets, the trenching campaign is designed to cut across a diorite sill intrusion that was mapped previously and the shear zone identified in previous exploration campaigns. This trenching program is anticipated to take approximately three months to complete. A similar campaign in 2023 uncovered an important gold anomaly and the current trenching campaign will target the projected expansion of the same gold-bearing structure. All sampling will be conducted according to industry standards and sent to Afrilab for assays. The identified Zone B structures are within an approximately 1 km2 area of the 82 km2 total area of the Tichka Est GoldProject. To date, Stellar has built an 8.5-kilometer mountain access road and conducted extensive mapping, sampling and trenching focussing on the regions in and around Zone B. Thus far three significant zones of gold mineralization have been discovered with much of the overall Tichka Est project area still unexplored or only superficially examined. At the Zone B several programs of mechanical and hand trenches delivered a series of impressive assay results including trenches MT1 3.5 g/t gold over 155.7 meters1, MT2 1.52 g/t gold over 39.7 meters and 1.58 g/t Au over 8.6 meters4, MT3 1.27 g/t gold over 80 meters4, T7B 3.4 g/t gold over 20 meters3, T6B 3.4 g/T gold over 17 meters3, and T2B 4.56 g/t gold over 15 meters2. Zone B is the primary exploration target for 2025 although Stellar will continue reconnaissance exploration throughout the Tichka Est Gold project permits area. Anuncio • Apr 02
Stellar AfricaGold Inc. announced that it has received CAD 1.17 million in funding On April 1, 2025. Stellar AfricaGold Inc. has closed the transaction. it has issued 11,700,000 Shares at a price of CAD 0.10 per Share for aggregate gross proceeds of CAD 1,170,000. Three Directors of the Company participated in the Offering, contributing CAD 140,000 Anuncio • Feb 19
Stellar AfricaGold Inc. announced that it expects to receive CAD 1.5 million in funding Stellar AfricaGold Inc. announced a non-brokered private placement that it will issue up to 15,000,000 common shares of the company at an issue price of CAD 0.10 per share for the gross proceeds of up to CAD 1,500,000 on February 18, 2025. The private placement is scheduled to close on or about February 28, 2025, and is subject to certain conditions, including, but not limited to, the receipt of all necessary approvals, including the approval of the TSX Venture Exchange. All shares issued under this offering will be subject to a mandatory investment hold period of four months plus one day from the date of issuance, in accordance with applicable securities laws. Anuncio • Oct 15
Stellar AfricaGold Inc., Annual General Meeting, Dec 12, 2024 Stellar AfricaGold Inc., Annual General Meeting, Dec 12, 2024. Anuncio • Aug 21
Stellar AfricaGold Inc. announced that it expects to receive CAD 0.6 million in funding Stellar AfricaGold Inc. announced a non-brokered private placement of up to 12,000,000 units at an issue price of CAD 0.05 per unit for the gross proceeds of CAD 600,000 on August 20, 2024. Each unit will comprise one common share and one transferable common share purchase warrant. Each warrant will entitle the holder thereof to acquire one additional share at a price of CAD 0.08 for a period of three years from issuance. All securities will be subject to a statutory hold period of four months and one day from issuance. The proposed private placement is fully subscribed with officers and directors of the company intending to subscribe for a total of 4,000,000 units of the private placement. Anuncio • Apr 19
An undisclosed buyer acquired Stellar Pacific Mali SARL from Stellar AfricaGold Inc. (TSXV:SPX) for XOF 25 million. An undisclosed buyer acquired Stellar Pacific Mali SARL from Stellar AfricaGold Inc. (TSXV:SPX) for XOF 25 million on April 18, 2024. An undisclosed buyer completed the acquisition of Stellar Pacific Mali SARL from Stellar AfricaGold Inc. (TSXV:SPX) on April 18, 2024. Anuncio • Nov 04
Stellar AfricaGold Inc., Annual General Meeting, Dec 31, 2023 Stellar AfricaGold Inc., Annual General Meeting, Dec 31, 2023. Anuncio • Jan 27
Stellar Africagold Inc. Completes Phase 1 Trenching of Dioritic Intrusions At Tichka Est Zone B and Discovers Additional Gold Mineralized Structures Stellar AfricaGold Inc. announced the discovery of additional gold mineralized structures associated to diorite intrusions at Tichka Est Zone B and its surrounding areas. Mapping of Diorite Intrusions and Discovery of Additional Gold Structures Following up on the impressive assay results from the mechanical trench cutting across a diorite body at Zone B at the Tichka Est Gold Project, Morocco (3.5 g/t Au over 155.7 metres -Gold Associated to Dioritic Sill Grading 3.5 G/T Gold across a True Width of 155.7 Meters') Stellar's exploration crew completed a mapping searching for additional diorite intrusions at Zone B. After completing the mapping program a Phase 1 Trenching program was conducted comprising (i) channel sampling of existing mechanical trenches (road cuts originally), and (ii) new hand tools trenches dug across the recently mapped diorite intrusions. This program discovered additional mineralized gold structures with substantial gold grades and delivered additional evidence of the continuity of gold mineralization at Zone B and the surrounding areas. Outcrops of diorite have been observed in other areas of Tichke Est and additional prospecting and mapping will be included in future exploration programs. Plans advancing for 2023 Drill Campaign: The on-site exploration crew continues the detailed mapping of Zone B while concurrently Stellar's field geologists continue to evaluate all structural features (including the diorite intrusions) to plan the next drill campaign. With new results from each phase of exploration Stellar's geological interpretation of Tichka Est continues to evolve, and the discovery of subparallel horizontal gold structures related to the diorite intrusions and the new extensions to the North-West and South-East of Zone B provide increased confidence for the discovery of a significant gold deposit at Tichka Est. Technical Information and Quality Control/Quality Assurance Notes: The hand tools trenches were excavated across the Zone B using hand tools to an average depth of 1.5 metres. Sample collection was completed by experienced senior local geologists. The samples were bagged at the sampling site and stored in safe areas until being transported to African Laboratory for Mining and Environment (‘Afrilab’) in Marrakech for analysis. A total of 101 samples were sent to Afrilab in Marrakech for this program. This number included 4 standards, 4 duplicates and 4 blanks samples that were added to the batch for the purpose of quality control, and all were well within the acceptable limits.