Bekanntmachung • Apr 21
Aker Bp Asa Announces Changes Aker BP ASA at its AGM held on 21 April 2026 appointed Nils Bastiansen as new member, all for a one year-term. David Latin was elected as new director. Bekanntmachung • Apr 08
Aker BP Starts Oil Production from Symra Field in North Sea Aker BP has started oil production from the Symra field in the North Sea. The project has been delivered nine months ahead of original schedule, generating significant value and accelerating production start into 2026. The field is estimated to contribute approximately 63 million barrels of oil equivalent to the Eiga area. Symra is located approximately 7 km north-east of the Ivar Aasen platform and has been developed as the second subsea tie-back to Ivar Aasen. Production will be partially processed at Ivar Aasen before final processing at Edvard Grieg. The development comprises four wells tied back via a subsea template. Modifications have been carried out on both platforms to enable tie-in of the subsea infrastructure to Ivar Aasen and to increase processing capacity at Edvard Grieg. The development has been carried out in close collaboration with several leading suppliers. TechnipFMC has delivered the subsea systems. Moreld Apply has carried out modifications on the Edvard Grieg platform, while Aibel has performed the modifications on the Ivar Aasen platform. Drilling operations have been undertaken by Odfjell Drilling and Halliburton through Aker BP's drilling and wells alliance. Together, these suppliers have contributed to the safe, efficient and high-quality execution of the project. Symra is the sixth Aker BP-operated project sanctioned in 2022 to come on stream. Aker BP is the operator of Symra (PL167/167B/167C) with partners Equinor (30 percent) and DNO Norge (20 percent). Bekanntmachung • Feb 27
Aker BP ASA to Report Fiscal Year 2025 Final Results on Mar 27, 2026 Aker BP ASA announced that they will report fiscal year 2025 final results on Mar 27, 2026 Bekanntmachung • Feb 11
Aker BP ASA Announces Cash Dividend for the First Quarter of 2026, Payable on 24 February 2026 Aker BP announced a cash dividend of USD 0.6615 (NOK 6.29417) per share for the first quarter of 2026. The last day of trading including the right to the dividend is set for 13 February 2026. The ex-dividend date is 16 February 2026, and the record date is 17 February 2026. The payment date for the dividend is scheduled for 24 February 2026. The dividend was approved on 10 February 2026. Bekanntmachung • Dec 05
Aker BP and Equinor Announce New Discovery Aker BP and operator Equinor have made a significant gas and condensate discovery in the Lofn and Langemann wells in the Sleipner area of the North Sea. Gross recoverable volumes are estimated at 30 to 110 million barrels of oil equivalent (mmboe). Lofn and Langem Ann - significant discovery near existing infrastructure. The wells 15/5-8 S (Lofn) and 15/5-8 A (Langemann) were drilled by the Deepsea Atlantic rig in production license PL1140, approx. 40 km northwest of Sleipner A and between the Gudrun and Eirin fields. Both wells encountered gas and condensate in the Hugin formation, which consists of high-quality sandstone reservoirs. The wells are classified as HPHT (high pressure, high temperature) and have been permanently plugged and abandoned after extensive data collection. License PL1140 was awarded in 2022 through the APA (Awards in Predefined Areas) licensing round. Aker BP holds 40% interest in the licence, which is operated by Equinor. The partnership will now evaluate development options that leverage existing infrastructure for efficient and low-emission production. In August, Aker BP successfully completed the Omega Alfa exploration campaign in the Norwegian North Sea, resulting in a large oil discovery with recoverable volumes estimated at 96 to 134 mmboe. Aker BP has between 38 and 48% ownership in the three licenses. Omega Alfa is among the commercial discoveries in Norway in a decade. Building on the momentum from East Frigg in 2023, Omega Alfa underscores how innovative exploration methods deliver results and push boundaries. The discoveries mark a major step toward Aker BP's ambition of producing more than one billion barrels from the Yggdrasil area. In the first quarter, the partnership made an oil and gas discovery at Kjottkake in licence PL1182S in the Northern North Sea. The reservoir shows good quality, with recoverable volumes estimated at 39 to 75 mmboe located near existing infrastructure in the Troll-Gjoa area. Through a transaction with Japex announced in July this year, Aker BP increased its ownership in Kjottkake to 45%. In November, Aker BP and DNO entered into an agreement to transfer the operatorship to Aker BP in the development phase. This will enable the company to leverage on its fast-track development capabilities for efficient project execution. Aker BP and the partnership are already evaluating development solutions with first oil now targeted in 2028. Bekanntmachung • May 07
Aker BP ASA Declares Cash Dividends for the Second Quarter of 2025, Payable on 21 May 2025 Aker BP ASA declared cash dividends for the second quarter of 2025 of USD 0.63 per share (NOK 6.51735 per share). The dividend will be payable on 21 May 2025 with record date of 13 May 2025 and ex-date of 12 May 2025. Bekanntmachung • Apr 02
Aker BP ASA to Report Fiscal Year 2024 Results on Apr 08, 2025 Aker BP ASA announced that they will report fiscal year 2024 results at 9:00 AM, Central European Standard Time on Apr 08, 2025 Bekanntmachung • Feb 14
Aker BP Announces a Base Dividend Growth in 2025 Aker BP announced a base dividend growth of 5% in 2025. Bekanntmachung • Feb 12
Aker BP ASA Declares Cash Dividends for the First Quarter of 2025, Payable on 25 February 2025 Aker BP ASA declared cash dividends for the first quarter of 2025 of USD 0.63 per share (NOK 7.06381 per share). The dividend will be payable on 25 February 2025 with record date of 18 February 2025 and ex-date of 17 February 2025. Date of approval: 11 February 2025. Bekanntmachung • Oct 30
Aker BP ASA Announces Cash Dividend for the Fourth Quarter of 2024, Payable on 13 November 2024 Aker BP ASA announced the cash dividend of USD 0.60 (NOK 6.5946) per share for the fourth quarter of 2024. Ex-date: 4 November 2024. Record date: 5 November 2024. Payment date: 13 November 2024. Date of approval: 29 October 2024. Bekanntmachung • Jul 12
Aker BP ASA Announces Cash Dividend for the Third Quarter of 2024, Payable on 25 July 2024 Aker BP ASA announced cash dividend to be paid in the third quarter of 2024 of USD 0.60 per share. Ex-date is 17 July 2024. Record date is 18 July 2024. Payment date is 25 July 2024. Date of approval: 11 July 2024. Bekanntmachung • Jul 03
Aker BP ASA Revises Production Guidance for the Full Year 2024 Aker BP ASA revised production guidance for the full year 2024. For the year, the full-year production is now forecasted to be 420 mboepd -440 mboepd, revised from the previous guidance of 410 mboepd-440 mboepd. Bekanntmachung • Jun 02
Aker BP ASA, Annual General Meeting, May 09, 2025 Aker BP ASA, Annual General Meeting, May 09, 2025. Bekanntmachung • Apr 30
Aker BP ASA Appoints Doris Reiter as Director of the Board Aker BP ASA announced that at the AGM was held on April 30, 2024, the company approved appointment of Doris Reiter as a director of the board. Bekanntmachung • Apr 24
Aker BP ASA Announces Cash Dividend for the Second Quarter of 2024, Payable on 8 May 2024 Aker BP ASA announced cash dividend to be paid in the second quarter of 2024 of USD 0.60 per share. Ex-date is 29 April 2024. Record date is 30 April 2024. Payment date is 8 May 2024. Date of approval: 23 April 2024. Bekanntmachung • Apr 23
Aker BP ASA Announces Production Start from Hanz in the North Sea Aker BP announced that production has started from Hanz in the North Sea. Hanz is operated by Aker BP, with Equinor and Sval Energy as partners. Hanz is a subsea field development tied into the Ivar Aasen platform about fifteen kilometres further south. Total investments are estimated at close to NOK 5 billion and total reserves are around 20 million barrels of oil equivalent (mmboe). Unique re-use of infrastructure and use of a cross-flow well: Hanz was discovered in 1997. After the delivery of the Plan for development and operation (PDO) for the Ivar Aasen area, which included the Hanz development, the project matured an optimised development solution by re-using subsea production systems (SPS) from the Jette field. It is the first time that production equipment has been re-used in a new field development on the NCS. In addition, the strategy for how the oil and gas is to be recovered was changed to include use of a cross-flow well for water injection. This results in a substantial reduction of power consumption, less use of chemicals and less equipment on the seabed. The change in the development solution for Hanz since the original PDO was submitted led the partnership to send a formal statement regarding the investment decision and the selected concept to the authorities in December 2021. Minimised CO2 emissions: The Ivar Aasen field is located on the Utsira High in the northern part of the North Sea, around 175 km west of Karmøy. The field was discovered in 2008, and was joined with other discoveries in the area, including Hanz, which was proven in 1997. The first oil from Ivar Aasen was produced on 24 December 2016. Ivar Aasen receives power from the Edvard Grieg platform ten kilometres to the southeast. From 2022, the field will receive power from shore via the Johan Sverdrup field, thereby minimising CO2 emissions. Bekanntmachung • Nov 02
Aker BP Elects Employee Representatives to the Board Aker BP elected as employee representatives to board of directors. Employee representatives: Ani Isabel Chiang; Marit Hargemark Dørum; Ingard Haugeberg (re-elected); Thomas Husvæg and; Tore Vik (re-elected). Deputy employee representatives: Sarah Berg (re-elected); Hilde Kristin Breivik; Rune Fauskanger (re-elected); Geir Smaaskjær and; Terje Solheim. Bekanntmachung • Oct 27
Aker BP ASA Announces Cash Dividend for the Fourth Quarter of 2023, Payable on 9 November 2023 Aker BP ASA announced cash dividend to be paid in the fourth quarter 2023 of USD 0.55 per share. Ex-date is 1 November 2023. Record date is 2 November 2023. Payment date is 9 November 2023. Bekanntmachung • Jul 14
Aker Bp Asa Announces Production Guidance for 2023 Aker BP ASA announced production guidance for 2023. For the year, full-year guidance increased to 445-470 (430-460) mboepd. Bekanntmachung • Jul 13
Aker Bp Declares Dividend for the Third Quarter 2023, Payable on 26 July 2023 Aker BP declares dividend of USD 0.55 per share (NOK 5.6578) for the third quarter 2023, payable on 26 July 2023. Record date 19 July 2023 and Ex-date is18 July 2023. Bekanntmachung • Jun 08
Aker BP ASA Launches Multi-Tranche Offering Aker BP ASA announced that it has launched a multi-tranche offering of U.S. Dollar-denominated Rule 144A/Regulation S senior unsecured notes. The interest rate, offering price and certain other terms will be determined at the time of pricing of the Notes, subject to market conditions. Concurrently with the Offering, the Company is also making an offer to purchase (a) any and all of its outstanding 3.000% Senior Notes due 2025 and (b) up to $500 million (less the amount validly tendered and accepted for purchase pursuant to the tender offer for the 2025 Notes) (the "Capped Maximum Amount") of its outstanding 2.875% Senior Notes due 2026 and/or its outstanding 2.000% Senior Notes due 2026 (the "Tender Offers" and each, a "Tender Offer"), in each case as validly tendered and accepted For purchase. Consummation of each Tender Offer is subject to the satisfaction of certain conditions, including, without limitation, the pricing of no less than $1,000 million in aggregate principal amount of the Offering. The Company reserves the right, subject to applicable law, to waive any and all conditions to any or all of the Tender Offers, extend or terminate any of the Tender Offers; increase the Capped Maximum Amount or otherwise amend any of the Tender Offering in any respect. The Company intends to use the net proceeds of the Offering for general corporate purposes and to pay the consideration for the Tender Offers. Bekanntmachung • May 25
Aker BP ASA Announces Production Capacity at Johan Sverdrup Field Has Been Successfully Test at 755,000 Barrels Oil Per Day Aker BP ASA announced that the production capacity at the Johan Sverdrup field has been successfully tested at 755,000 barrels oil per day. The development of Johan Sverdrup Phase 2 was completed in December, increasing the field's total oil production capacity to 720,000 barrels per day. The partners have an ambition to increase this capacity, and the operator Equinor has now successfully tested the process facilities to 755,000 barrels per day. Bekanntmachung • Feb 11
Aker BP ASA Provides Production Guidance for the Year 2023 Aker BP ASA provided production guidance for the year 2023. For the year, the company expects production of 430 mboepd - 460 mboepd. Bekanntmachung • Jan 13
Aker BP Starts Drilling an Exploration Well in the North Sea Licence PL867 Rex International Holding Limited announced that the operator, Aker BP, has started drilling an exploration well in the North Sea licence PL867 on 11 January 2023. Rex's 91.65% subsidiary Lime Petroleum AS has a 20% interest in the licence. The well targets the Gjegnalunden prospect in the prolific Hugin reservoir. The licence PL867 is located on the Gudrun Terrace in the Central North Sea. Drilling will be conducted in water depths of 116 metres using Saipem's Scarabeo 8 semi-submersible rig and is expected to take 27 days. Bekanntmachung • Jan 27
Aker BP ASA to Report Q4, 2021 Results on Feb 09, 2022 Aker BP ASA announced that they will report Q4, 2021 results on Feb 09, 2022 Bekanntmachung • Dec 19
Aker BP ASA to Develop the Gråsel Discovery in 2021 Aker BP ASA announced that the company and its Skarv partners (Equinor, Wintershall Dea and PGNiG) have decided to develop the Gråsel discovery. The partners approved the final investment decision for the Gråsel development on December 17, 2020. The Gråsel reservoir, which extends over seven kilometers and is two kilometers wide, is situated above the Skarv reservoir in the Norwegian Sea, approximately 210 kilometers west of Sandnessjøen. Gråsel holds a total of around 13 million barrels of oil equivalent. The oil and gas production will utilize available capacity on the existing production vessel on the Skarv field. Total investment costs for the Gråsel project are around NOK 1.2 billion. The development consists of a new producer drilled from an existing well slot on the Skarv field, and injection support from a joint injector for Gråsel and Tilje. The successful early-phase work with Gråsel will be used as a model for future developments of smaller discoveries, which is one of Aker BPs prioritized areas. Gråsel will also contribute to lifetime extension for the Skarv FPSO. The first oil from Gråsel is planned for the fourth quarter of 2021, in the same period as Ærfugl phase 2 will come on stream. - This will be the first time Aker BP links two projects to the same field center in the same year. This will be a milestone for the company. Bekanntmachung • Nov 26
Aker BP and Cognite Pioneer Robotics Deployment Offshore to Transform Oil and Gas Industry with Autonomous Mission Cognite has partnered with Aker BP to deploy Spot, the quadruped robotic dog, to pioneer the remote controlled offshore mission on the Skarv installation, 210 kilometers offshore in the North Sea. The effort continues to build upon Aker BP and Cognite’s bold digital agenda to transform the industry through digitalization, which will result in improved efficiency, safety, and sustainability offshore. This recent endeavor signals a significant opportunity to transform the oil and gas industry worldwide. Aker BP is committed to affordable, reliable, sustainable, and modern energy for all, and using robotics is a strong part of this vision. Spot’s work offshore is the next step in his journey as he was issued his official employee number in February at the Aker BP Capital Markets Day. In addition Aker BP has a number of other projects involving drones and additional mobile robots to deliver on their vision of optimized remote operations using Cognite’s data driven technology. The mobility of Spot offshore, and the communication between Spot, Cognite Data Fusion and Aker BP was both verified and tested. Data from Spot was available and sorted in Cognite Data Fusion in milliseconds, and Spot was remote controlled from a Cognite home office onshore demonstrating how robots and digital twins can have synergies and enhance each other. In addition, data from an operator round was collected to analyze if the sensor-stack on Spot was sufficient to comply with the proposed task. Bekanntmachung • Nov 14
PGNiG Upstream Norway and Aker BP ASA Found Natgas and Crude Oil Reserves at Alve Nord East Prospect in Norway Natgas group PGNiG's upstream unit PGNiG Upstream Norway and Aker BP ASA found natgas and crude oil reserves at Alve Nord East prospect in Norway, PGNiG said in a press statement after drilling works have been completed. Bekanntmachung • Jul 31
PGNiG Upstream Norway AS completed the acquisition of minority interests in Gina Krog Field and License 127C from Aker BP ASA (OB:AKERBP). PGNiG Upstream Norway AS entered into an agreement to acquire minority interests in Gina Krog Field and License 127C from Aker BP ASA (OB:AKERBP) on February 11, 2020. As a result of the transaction, PGNiG Upstream Norway’s working interest in the Gina Krog field will increase by 3.3%, up to 11.3%. In return, the company will transfer a 5% working interest in its recent Shrek discovery on the licence PL838, and pay a firm cash consideration of $51 million to Aker BP (including tax balances). PGNiG Upstream Norway will also purchase an 11.92% working interest in licence PL127C (including the Alve Nord discovery) north from the Skarv field for a payment of $11 million, contingent on the further development of the Alve Nord discovery. The completion of the transaction is subject to the approval of the Norwegian Authorities (including the Ministry of Petroleum and Energy and the Ministry of Finance) and corporate approvals in both companies.
PGNiG Upstream Norway AS completed the acquisition of minority interests in Gina Krog Field and License 127C from Aker BP ASA (OB:AKERBP) on May 5 2020.