Announcement • Jul 29
Stakeholder Gold Corp Advances 3D Geophysical Inversions and Plans 1,250-Sample Soil and Prospecting Programs Across Loki West and Loki East Stakeholder Gold Corp. reported continued momentum across the Loki Copper Zone and the broader Loki structural corridor at its 100%-owned Ballarat Gold-Copper Project, located in the White Gold District of the Yukon Territory. The company is advancing three-dimensional (3D) inversion modelling of historical airborne VTEM geophysical data over the Loki Copper Zone, together with 3D inversion of magnetic data spanning the broader Loki and Loki West targets. The resulting 3D resistivity and magnetic-susceptibility models are expected to meaningfully sharpen copper drill targeting along the Loki structural corridor by resolving conductive, potentially sulphide-related features and associated structures at depth. Stakeholder is planning a robust 1,250-sample soil geochemical sampling program, together with concurrent geological prospecting, over the Loki West and newly staked Loki East targets. These programs extend the company’s footprint along one of the district’s most prospective copper corridors and will commence as soon as crews become available. Three-dimensional (3D) inversion of a historical helicopter-borne VTEM (electromagnetic) data acquisition flown in 2017 by Geotech Ltd. over the Loki Copper Zone, together with 3D inversion of UAV magnetic data flown by Overhead Intelligence Inc. in 2024 over the area covering the Loki and Loki West targets, is nearing completion and will refine copper drill targeting along the Loki structural corridor. Data processing is being completed by GroundTruth Exploration Ltd. and will provide insights on the mineralized intrusions now being targeted for drilling. A large-scale, 1,250-sample soil geochemical sampling program is planned over the Loki West and newly staked Loki East targets to define and expand copper-in-soil anomalies identified along the Loki structural corridor. A prospecting program will run concurrently with the soil survey. The recently staked Loki East target meaningfully extends the company’s coverage of the prospective Loki structural corridor to the southeast. Field work is set to begin as soon as crews can be scheduled onsite. Results from the upcoming soil geochemical and prospecting program will be integrated with the completed 3D VTEM and magnetic inversion models to prioritize and refine copper drill targets along the Loki structural corridor ahead of future drill testing. The newly staked Loki East target, located at the southeastern extension of the corridor, will be systematically evaluated for the first time as part of this program. Announcement • Jul 08
Stakeholder Gold Corp Submits Class 3 Mining Land Use Permit Application and Expands Claim Position At Ballarat Gold-Copper Project Stakeholder Gold Corp. has submitted a Class 3 Mining Land Use Permit application and staked Placer Prospecting Leases at its 100%-owned Ballarat Gold-Copper Project located in the White Gold District of the Yukon Territory. The Class 3 MLUP application is designed to permit a significantly scaled-up diamond drilling campaign which can be supported by a dedicated on-site exploration camp. Stakeholder has recently expanded its Ballarat claim position to cover additional highly prospective ground as well as to cover existing road access to the Yukon River barge landing located where the southern portion of the Ballarat property meets the Yukon River. New claims also bring a second, larger, historic airstrip located adjacent to the Ballarat Barge Landing inside the Company’s 100%-owned land package, adding river, road and air logistical support to the project. Stakeholder has also staked Placer Prospecting Leases running 4 km along a key Ballarat drainage basin. The Ballarat Gold-Copper Project occupies what management believes to be one of the most strategic land positions in the rapidly advancing White Gold District. The property lies immediately northeast of, and adjacent to, Talamore Mining’s Coffee Gold Project, which is currently under development as one of Canada's newest gold mines. The Northern Access Route, now under construction to service the Coffee Gold Project, traverses through the center of the Ballarat property – placing 20 km of new, mine-grade road infrastructure across Stakeholder’s ground and dramatically enhancing future access for exploration and development. The Class 3 MLUP application is now proceeding through Yukon’s regulatory review process, including environmental and socio-economic assessment and consultation with affected First Nations and stakeholders. Reported Earnings • May 05
Full year 2025 earnings released: CA$0.13 loss per share (vs CA$0.16 loss in FY 2024) Full year 2025 results: CA$0.13 loss per share (improved from CA$0.16 loss in FY 2024). Revenue: CA$1.61m (up 71% from FY 2024). Net loss: CA$2.62m (loss narrowed 6.0% from FY 2024). Over the last 3 years on average, earnings per share has fallen by 43% per year but the company’s share price has increased by 20% per year, which means it is well ahead of earnings.