Announcement • May 23
Power Metals Corp Appoints Eric Schrimsher to the Cesium Advisory Committee, Effective May 21, 2026 Power Metals Corp. announced the appointment of Eric Schrimsher to the Company's Cesium Advisory Committee, effective May 21, 2026. Mr. Schrimsher brings more than 15 years of global mining sector experience, including a decade exploring across Australia with BHP and senior leadership of lithium and cesium exploration programs for Albemarle. He supported the development of Albemarle's global lithium mineral systems model and has presented mineral systems exploration concepts at major industry conferences. His experience spans early-stage exploration through to resource development and mine planning, with pegmatite exploration leadership across Australia and North America. Announcement • Apr 14
Power Metals Corp., Annual General Meeting, Jun 08, 2026 Power Metals Corp., Annual General Meeting, Jun 08, 2026. Announcement • Jan 15
Power Metals Corp Provides an Update on Activities Underway At the Company's Case Lake Project in Ontario, Canada Power Metals Corp. provided an update on activities underway at the Company's Case Lake Project ("the Project") in Ontario, Canada. Power Metals has re-mobilised field teams to complete environmental drilling of hydrogeological flow wells and groundwater monitoring wells at West Joe. The program, which commenced in late November, is expected be completed in coming weeks with a total of eleven groundwater wells drilled at West Joe. Well monitoring is expected to be operational by the end of the month with the Company's environmental team Blue Heron Environmental. The Company has also re-commenced its monthly surface hydrology analysis program across six (6) locations and two (2) flow monitoring locations for 2026. This program started in late 2024 with all monitoring and data collection conducted in conjunction with traditional landowners. Environmental geochemistry analysis was conducted on a total of sixty-nine (69) rock samples for acid mine drainage and trace metals from waste rock within and surrounding the West Joe pit shell. Samples have been dispatched to the laboratory for analysis and results will start returning in February 2026. The Company's biological analysis program on local flora and fauna species across the entire Case Lake Project area has concluded with the final report received from environmental consultants in late 2025. Currently no major flora or fauna risks have been identified, which opens the path to implementing environmental mitigation plans that continue to fast track permitting for the project. Permitting pathway: Permitting required for various other aspects of the project continue to be at the forefront for the Company and are progressing through interface with both government and industry bodies. The Company has continued discussions for advancing it's One Process One Permit (1P1P) application with the Ontario Ministry in parallel to baseline studies and permit applications. Mining operations at Case Lake remain on track to commence this year with the Company's downstream partner Albermarle prepared commence commercial production of cesium oxide in 2026. This mining, processing and production sequence will represent the first new generation of cesium operations to support an integrated North American supply chain. The Case Lake Property is located 80 km east of Cochrane in northeastern Ontario, near the Ontario Quebec border. It comprises 586 cell claims across Steele, Case, Scapa, Pliny, Abbotsford and Challies townships within the Larder Lake Mining Division. The Property is 10km by 9.5km in size with 14 granitic domes. The Case Lake pegmatite swarm consists of six spodumene dykes known as the North, Main, South, East and Northeast dykes on the Henry Dome, and the West Joe dyke on a new dome, collectively forming mineralization trend that extends for approximately 10km. Power Metals has completed several exploration campaigns leading to the discovery and expansion of new and historic spodumene bearing LCT pegmatite.