공시 • Mar 03
MMG Limited, Annual General Meeting, May 28, 2026 MMG Limited, Annual General Meeting, May 28, 2026. 공시 • Jan 22
MMG Limited Provides Production Guidance for the Full Year 2025 MMG Limited provided production guidance for the full year 2025. For the year, the company expects Las Bambas is targeting 400,000 tonnes of copper production, with a guided range of 380,000 tonnes 400,000 tonnes. C1 Costs for 2026 are anticipated to range between USD 1.20/lb and USD 1.40/lb. Copper production at Kinsevere is expected to range between 65,000 tonnes and 75,000 tonnes, with a focus on stabilising operations and implementing a Battery Energy Storage System (BESS) to reduce the impacts from the frequent power trips. C1 costs for 2026 are guided at USD 2.50/lb USD 2.90/lb. Copper production at Khoemacau is expected to range between 48,000 tonnes and 53,000 tonnes in copper concentrate, supported by planned access to higher-grade zones in Zone 5 North and enhanced mine development. C1 costs for 2026 are expected to be USD 2.00/lb USD 2.30/lb. Zinc production at Dugald River is expected to range between 170,000 tonnes and 180,000 tonnes in zinc concentrate, slightly below the record production set in 2025 due to the mine's progression at depth and weather-related challenges. C1 costs for 2026 are projected at USD 0.80/lb USD 0.95/lb. Zinc production at Rosebery is expected to range between 45,000 tonnes and 55,000 tonnes in zinc concentrate, with zinc equivalent production expected at 125,000 tonnes 140,000 tonnes. The mine's C1 costs for 2026 are forecast to range from negative USD 0.60/lb to negative USD 0.10/lb. 공시 • Jun 06
MMG Limited to Report First Half, 2025 Results on Aug 12, 2025 MMG Limited announced that they will report first half, 2025 results on Aug 12, 2025 공시 • Mar 28
MMG Limited to Report Fiscal Year 2024 Results on Apr 24, 2025 MMG Limited announced that they will report fiscal year 2024 results at 4:00 PM, China Standard Time on Apr 24, 2025 공시 • Mar 04
MMG Limited, Annual General Meeting, May 22, 2025 MMG Limited, Annual General Meeting, May 22, 2025. 공시 • Jan 23
MMG Limited to Report Fiscal Year 2024 Results on Mar 04, 2025 MMG Limited announced that they will report fiscal year 2024 results on Mar 04, 2025 공시 • Sep 13
MMG Limited to Report First Half, 2024 Results on Sep 19, 2024 MMG Limited announced that they will report first half, 2024 results on Sep 19, 2024 공시 • Aug 23
MMG Limited Appoints Jing Zhao (Ivo) as Executive General Manager Americas, Effective 1 September 2024 The board of directors of MMG Limited (Company) refers to the announcement made on 31 May 2024 with regard to the resignation of Mr. Jianxian Wei as Executive General Manager Americas (EGM Americas) and the appointment of Mr. Jing Zhao (Ivo) (Mr. Zhao) to the position of Interim EMG Americas with effect from 1 June 2024. The Board announced that Mr. Zhao has been appointed as the EMG Americas with effect from 1 September 2024. Prior to his appointment as the EGM Americas, Mr. Zhao was the Vice President of Sustainability & Corporate Affairs at Minera Las Bambas S.A., a non-wholly owned subsidiary of the Company since 2022. Mr. Zhao was also the Deputy Director of the International Cooperation Division of China Minmetals Corporation from 2020 to 2021. He has nearly 20 years extensive practical experience in international management and is proficient in dealing with stakeholder relations in the mining industry. Mr. Zhao holds a Bachelor's Degree in Spanish Language from the Beijing Language Culture University and a Master's Degree in Business Administration from Université du Québec à Montréal. 공시 • Jul 24
MMG Limited Provides Production Guidance for the Full Year 2024 MMG Limited provided production guidance for the full year 2024. The previous production guidance for Las Bambas, set at 280,000 to 320,000 tonnes of copper in 2024, remains unchanged. Actual production is expected to be towards the higher end of this range. Kinsevere copper cathode production guidance for 2024 remains unchanged within the range of 39,000 to 44,000 tonnes. In line with prior guidance, Khoemacau copper production for the full year of 2024 is expected to be between 40,000 and 50,000 tonnes (30,500 40,500 tonnes from 23 March 2024). Rosebery's zinc production guidance for 2024 remains within 50,000 to 60,000 tonnes, with zinc equivalent production projected between 115,000 to 130,000 tonnes. 공시 • Jun 13
MMG Limited to Report First Half, 2024 Results on Aug 13, 2024 MMG Limited announced that they will report first half, 2024 results on Aug 13, 2024 공시 • Mar 06
MMG Limited, Annual General Meeting, May 23, 2024 MMG Limited, Annual General Meeting, May 23, 2024. 공시 • Jan 08
MMG Limited to Report Fiscal Year 2023 Results on Mar 05, 2024 MMG Limited announced that they will report fiscal year 2023 results on Mar 05, 2024 공시 • Oct 27
MMG Limited Provides Production Guidance for the Full Year 2023 MMG Limited provided production guidance for the full year 2023. The company's revised full-year copper production guidance is now anticipated to be in the range of 328,000 to 353,000 tonnes, at the higher end of the previous guidance, primarily due to the stability in operations at Las Bambas since March. The full-year zinc production guidance is now expected to be between 188,000 and 203,000 tonnes, at the lower end of the previous guidance. This is primarily due to challenges faced with mining at depth at Rosebery and its lower than planned milled ore grades resulting from the mining sequence. 공시 • Aug 19
MMG Limited Appoints Xu Jiqing as Chairman The board of directors of MMG Limited announced that the appointment of Mr. Xu Jiqing, currently a Non-executive Director, as the chairman of the Board with effect from 18 August 2023. Mr. Xu, aged 55, was re-designated from an Executive Director to a Non-executive Director of the Company in January 2020. Prior to his redesignation, he was an Executive Director and Executive General Manager of the Company from May 2013 to December 2019 with responsibility for various areas, most recently China Relations, Marketing and Supply. Mr. Xu was also a Non- executive Director of the Company from May 2009 to May 2013. He is a member of the Company's Audit and Risk Management Committee and the Governance, Remuneration, Nomination and Sustainability Committee. Mr. Xu was appointed as President of China Minmetals Non-ferrous Metals Company Limited (CMN) in January 2020. He has been a director of CMN since February 2016. Mr. Xu holds a Bachelor's degree in Accounting from the University of International Business and Economics in the People's Republic of China (PRC), and a Master's degree in Business Administration from Saint Mary's University in Canada. He is a qualified senior accountant in the PRC, a fellowship member of the Certified General Accountants Association of Canada and a chartered professional accountant member of the Chartered Professional Accountants of British Columbia, Canada. Mr. Xu has extensive experience in strategic planning, accounting, marketing and corporate financial and risk management. Mr. Xu joined the China Minmetals Corporation Group in 1991, holding a number of management roles from 1997 in various Finance departments. He was the Vice President and Chief Financial Officer of CMN between 2005 and 2013. 공시 • Jul 14
MMG Limited Provides Exploration Update for the Las Bambas and Rosebery Mines The board of directors (Board) of MMG Limited provided the exploration update for the Las Bambas and Rosebery mines. The report is annexed to this announcement. By order of the Board. MMG Limited. MMG operates the Las Bambas copper mine in Peru and the Rosebery Mine in Tasmania, Australia. Las Bambas is a joint venture project between the operator MMG (62.5%), a wholly owned subsidiary of Guoxin International Investment Co. Ltd. (22.5%) and CITIC Metal Co. Ltd. (15.0%). Rosebery is 100% owned and operated by MMG Limited. MMG wishes to provide an update to the Hong Kong Stock Exchange on progress with exploration activities on both Las Bambas and Roseberry. This report of exploration results is voluntary and is made in accordance with the JORC Code (2012). The complete report including the "Table 1 Checklist of Assessment and Reporting Criteria" required by the JORC Code (2012) can be found on the MMG website at the following address. Ferrobamba Deeps, Las Bambas. Deep drilling below the current Ferrobamba pit has been successful at defining the depth extension and continuity of skarn and porphyry mineralisation beneath the 2022 Ore Reserve pit design. It is now recognised that potential for large tonnage 0.4% to 0.6% Cu, 200 to 500 ppm Mo, 2g/t to 4g/t Ag and 0.04g/t to 0.08g/t Au grade deposit may exist at Ferrobamba Deeps. The positive drill results received in the 2022 program are supporting ongoing studies and further drilling is planned for 2023 and 2024 to evaluate the mineralisation and determine potential mining methods including expansion of the open pit and /or an underground development. Mineralisation at Ferrobamba occurs in semicontinuous zones which are distributed around the central porphyry stocks. The Ferrobamba Deeps mineralisation, which has been intersected up to 700m below the Ore Reserve pit, has been divided into five zones. 공시 • Jun 16
MMG Limited to Report First Half, 2023 Results on Aug 15, 2023 MMG Limited announced that they will report first half, 2023 results on Aug 15, 2023 공시 • Feb 01
MMG Limited Provides Production Guidance for the Year 2023 MMG Limited provided production guidance for the year 2023. For the year 2023, Las Bambas copper production for 2023 is expected to be in the range of 265,000 and 305,000 tonnes. Kinsevere copper cathode production for 2023 is expected to be in the range of 40,000 and 48,000 tonnes. Dugald River zinc production for 2023 is expected to be in the range of 170,000 and 185,000 tonnes of zinc in zinc concentrate. Rosebery zinc production for 2023 is expected to be in the range of 55,000 and 65,000 tonnes of zinc in zinc concentrate. 공시 • Jan 20
MMG Limited to Report Fiscal Year 2022 Results on Mar 07, 2023 MMG Limited announced that they will report fiscal year 2022 results on Mar 07, 2023