공지 • May 01
Central Iron Ore Limited Announces Drilling Update Central Iron Ore Limited announced that the next phase of resource expansion drilling at the British King Project in Western Australia has commenced. 78 Reverse Circulation ('RC') drillholes are scheduled to be completed over a 9-week campaign. Highlights: Phase 1 Resource expansion drilling has commenced at British King. 78 RC (Reverse Circulation) drill holes for 10,601m has been planned to further extend in all directions the recently updated British King resource along the entire extent of the deposit. Phase 1 is designed to expand the footprint of the existing British King geological model, whilst drilling at a tight enough collar spacing to allow for an inferred resource to be modelled of the resultant extended British King lode. Planned drilling for 2025 has been structured in two phases: Phase 2 will focus on targeted infill drilling to upgrade the Phase 1 inferred resource to indicated status. The Company's British King Project is located across the British King Mine situated on the M37/30 Mining Tenement, approximately 320km northwest of Kalgoorlie and 60km east of Leinster in Western Australia. 공지 • Mar 20
Central Iron Ore Limited Announces Filing of NI43-101 Technical Report Central Iron Ore Limited announced that is has filed a National Instrument 43-101 Technical Report Mineral Resource Estimate, British King Gold Project Western Australia. CIO announced that it has filed an independent technical report titled "Technical Report Mineral Resource Estimate,British King Gold Project Western Australia" prepared by Andrew Bewsher MAIG with an effective date of 20 March 2025 (the "Technical Report"). The Technical Report was prepared in accordance with National Instrument 43-101 - Standards for Disclosure of Mineral Projects. The conclusion of the Technical Report stated: The 2024 RC and diamond drilling programmes completed by CIO has successfully contributed to the increase in geological and grade confidence of the British King MRE. The metallurgical test work completed in 2025 has demonstrated the British King mineralisation is amenable to standard carbon in leach processing with a recovery in excess of 90%. The resultant Indicated and Inferred MRE is 263K tonnes @ 4.51 g/t Au for 38.1K oz at a top cut of 24 g/t Au within an optimised pit shell at AUD 4,500. The Technical Report advises: The completion of a heritage survey, a hydrogeology, geotechnical assessment and a mining study will have the project to a point of CIO being able to submit a mining proposal to DEMIRS Western Australia and having the British King deposit mine ready. 공지 • Jan 19
Central Iron Ore Limited Announces Drilling Results Central Iron Ore Limited announced the results for the 2024 Phase 1 Reverse Circulation (RC) drilling campaign at the South Darlot Gold Project and the 2024 Phase 1 Diamond Drilling (DD) at British King have been finalised. Drilling Results: Assay results for all 2,305 samples submitted during the 2024 Fourth Quarter South Darlot Gold Project RC and 2024 Fourth Quarter British King DD drilling campaigns have been received from ALS Laboratories. The quality of the assay results for all the drilling is considered satisfactory with the required Quality Assurance and Quality Control (QAQC) processes having been completed with all results meeting industry standard. Satellite Projects – Fourth Quarter 2024. Interpretation of the RC drilling assay results has further expanded the known mineralisation zones at Mermaid, Sylvia & Kyneton and Weebo North. Multiple significant intercepts were recorded across all the target areas (Table 1). Significant intercepts have been calculated using a cut-off grade of 0.8 g/t with a maximum of 2m internal dilution. Mermaid Drilling: The 10-hole RC program drilled at Mermaid achieved its primary objective testing for lateral extension of the Mermaid lode to the west with 24MERC_003, the most western hole drilled, intercepting 4m @ 3.43g/t from 56m downhole. The secondary target of extending the Mermaid lode down dip was also achieved with all three of the drillholes intersecting a well developed, moderately mineralised quartz-sulphide lode. Significant results for the drilling are: 24MERC_003: 4m @ 3.43g/tAu from 56 meters 24MERC_004: 1m @ 1.97g/t Au from 44 meters 24MERC_006: 6m @ 2.29g/t Au from 55 meters 24MERC_007: 1m @ 0.81g/t Au from 66 meters 24MERC_008: 1m @ 1.07g/tAu from 86 meters 24MERC_009: 1m @ 0.95g/tAu from 84 meters 24MERC_010: 2m @ 1.64g/tAu from 81 meters Sylvia & Kyneton Drilling: A second pass reverse circulation (RC) drilling programme consisting of 9 holes for 600 metres was completed to test for downdip and lateral extension of the Sylvia lode confirmed by the successful 2023 pilot drilling program. The eastern extent of the lode has been defined and the down dip extension has been confirmed. Significant results for the drilling are: 24SKRC_001: 1m @ 9.51g/tAu from 67 meters 24SKRC_002: 1m @ 2.85g/tAu from 69 meters 24SKRC_003: 1m @ 1.27g/tAu from 53 meters 24SKRC_004: 4m @ 3.54g/tAu from 68 meters 24SKRC_005: 1m @ 3.79g/tAu from 26 meters 24SKRC_006: 1m @ 1.69g/tAu from 42 meters 24SKRC_007: 3m @ 2.26g/tAu from 54 meters Weebo North Drilling: Following the successful 2023 maiden RC drill campaign at the Weebo North prospect, a second pass reverse circulation (RC) drilling programme consisting of 12 holes for 630 metres was completed. The drill program was designed to primarily test for lateral and down dip extension of the primary near East West trending auriferous lode as well as 3 holes to test for down dip extension of the near North South trending high-grade lode. The understanding of the prospect has been greatly improved following interpretation of the results with the eastern limits of the East West lode being defined as well as the downdip extension of the lodes remaining open. Significant results for the drilling are: 24WNRC_005: 2m @ 14.85g/t Au from 16 meters 24WNRC_006: 3m @ 1.52g/t Au from 54 meters 24WNRC_011: 2m @ 15.1g/tAu from 56 meters 24WNRC_012: 8m @ 1.02g/tAu from 36 meters 24WNRC_013: 10m @ 2.64g/tAu from 37 meters British King Diamond Drilling Results – Fourth Quarter 2024: Six (6) PQ/HQ diamter diamond drillholes were completed across the British King deposit targeting mineralisation within the Oxide, Transitional and Fresh weathering profiles. The drill core was geologically logged and sampled with large volume, representative samples being sent for fire assay, metallurgical and petrographic test work. The fire assay results have been received with significant intercepts being listed in Table 2 with the metallurgical and petrographic test work still ongoing. Significant intercepts have been calculated using a cut-off grade of 0.8 g/t Au. 공지 • Nov 01
Central Iron Ore Limited, Annual General Meeting, Nov 29, 2024 Central Iron Ore Limited, Annual General Meeting, Nov 29, 2024. 공지 • Sep 29
Central Iron Ore Limited has completed a Composite Units Offering in the amount of $0.533927 million. Central Iron Ore Limited has completed a Composite Units Offering in the amount of $0.533927 million.
Security Name: Units
Security Type: Equity/Derivative Unit
Securities Offered: 10,678,532
Price\Range: $0.05
Transaction Features: Rights Offering 공지 • Sep 19
Central Iron Ore Limited Provides Drilling Update Central Iron Ore Limited announced this Drilling Update. Central Iron Ore announced that the results for the 2024 Phase 1 RC drilling campaign have been finalised. Highlights: Assay results for the 75-hole, 5 911-meter 2024 Phase 1 RC program has been received and processed. Multiple significant intercepts exceeding has been intercepted across the target area some notable intercepts include; 24BKRC_004: 5m @ 20.52g/t from 110 meters. 24BKRC_007: 3m @ 28.26g/t from 96 meters. 24BKRC_010: 2m @ 24.02g/t from 75 meters. 24BKRC_015: 3m @ 35.61g/t from 58 meters. 24BKRC_028: 7m @ 8.53g/t from 61 meters. 24BKRC_017: 2m @ 2.44g/t from 80 meters. And: 1m @ 6.24g/t from 84 meters. And: 2m @ 26.7g/t from 93 meters. 24BKRC_028: 7m @ 8.53g/t from 61 meters. Commencing in late September, 321 metres of Diamond Drilling (6 drillholes) will twin selected RC drillholes the showed exceptional gold endowment. The diamond drillhole core will provide invaluable structural, mineralogical and metallurgical information The British King Mineral Resource is currently being updated to include the results of the recent drilling. Interpretation of the RC drilling assay results has confirmed high grade gold mineralisation across the prospect area. A clear geological understanding of the ore body has been developed with gold mineralisation associated with a primary laminated bucky quartz lode with continuity for the entire 840m of strike targeted by the drilling campaign. Mineralisation is open down dip and along strike. Twinning diamond drilling of 6 selected high-grade interceptions will commence towards end September 2024 to obtain large volume, representative samples for structural, metallurgical and petrographic test work. The British King Mineral Resource is currently being updated to include the results of the recent RC drilling. The Company’s 100% owned British King Mine Area has a NI43-101 Inferred Mineral Resource of 105,000 tonnes at 6.35 g/t Au for a total of 22,400 ounces. The British King Extensions, 100% owned by the South Darlot Joint Venture in which the Company owns a 70% interest, has an NI43-101 Inferred Resource 71,000 tonnes at 5.64 g/t Au for 12,830 ounces at a gold price of AUD 3,000/ounce. Both Inferred Resources have a top cut of 35 g/t Au (as per NI 43-101 report dated 18/5/2023 entitled “NI43-101 Technical Report South Darlot Gold Project Updated for the 2022-2023 Exploration Western Australia”). The Company’s British King Project is located across the British King Mine situated on the M37/30 Mining Tenement, approximately 320km northwest of Kalgoorlie and 60km east of Leinster in Western Australia . 공지 • Sep 03
Central Iron Ore Limited Announces Drilling Update Central Iron Ore Limited announced that the next phase of exploration activities at the South Darlot Gold Project in Western Australia has started on the 28th of August 2024, with a total 42 Reverse Circulation ('RC') and 4 diamond holes scheduled to be completed over a 2 to 3 week campaign. Drilling has commenced at the South DarlotGold Project: Drilling has commenced on 42 RC drillholes for 1,968 metres that will further positive results encountered at the satellite prospects at South Darlot and include Mermaid, Sylvia/Kyneton and Weebo. Commencing in September, 200 metres of Diamond Drilling (4 drillholes) will test the primary British King lode. The diamond drillhole core will provide invaluable mineralogical and metallurgical samples. The Company's South Darlot Gold Project includes mining leases M37/421, M37/552, M37/631, M37/632, M37/709 and M37/1045 is located approximately 320km northwest of Kalgoorlie and 60km east of Leinster in Western Australia. CIO are in a joint venture with ASX listed Red 5 Limited who have recently merged with Silver Lake Resources.