Board Change • May 20
Less than half of directors are independent Following the recent departure of a director, there is only 1 independent director on the board. The company's board is composed of: 1 independent director. 4 non-independent directors. Independent Non-Executive Director Rob Longley was the last independent director to join the board, commencing their role in 2021. The company's minority of independent directors is a risk according to the Simply Wall St Risk Model. 공시 • May 02
Green Technology Metals Limited has filed a Follow-on Equity Offering in the amount of AUD 7 million. Green Technology Metals Limited has filed a Follow-on Equity Offering in the amount of AUD 7 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 80,000,000
Price\Range: AUD 0.02
Discount Per Security: AUD 0.0012
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 270,000,000
Price\Range: AUD 0.02
Discount Per Security: AUD 0.0012
Transaction Features: Subsequent Direct Listing 공시 • Oct 13
Green Technology Metals Limited has filed a Follow-on Equity Offering in the amount of AUD 4.5 million. Green Technology Metals Limited has filed a Follow-on Equity Offering in the amount of AUD 4.5 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 118,792,510
Price\Range: AUD 0.028
Discount Per Security: AUD 0.00168
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 41,921,776
Price\Range: AUD 0.028
Discount Per Security: AUD 0.00168
Transaction Features: Subsequent Direct Listing 공시 • Oct 08
Green Technology Metals Limited, Annual General Meeting, Nov 27, 2025 Green Technology Metals Limited, Annual General Meeting, Nov 27, 2025. 공시 • Jul 25
Green Technology Metals Ltd Announces Large, High-Grade Rubidium Resource at Seymour Project, Ontario Green Technology Metals Ltd. announced a significant milestone at its Seymour Project in Ontario, Canada, with the release of a maiden Rubidium Mineral Resource. Hosted within the same pegmatite system as the company's lithium resource at North Aubry, this Rubidium discovery has the potential to convert material previously considered waste into a valuable by-product stream. Recognised as a critical mineral by both the United States and Japan, Rubidium plays a key role in advanced electronics, aerospace, quantum computing, and defence applications. GT1's vertically integrated strategy now offers exposure to multiple high-value markets through this exciting new resource. 공시 • Apr 11
Green Technology Metals Limited Completes Optimised Preliminary Economic Assessment for the Standalone Root Lithium Project Green Technology Metals Limited announced the completion of its optimised Preliminary Economic Assessment ("PEA") for the standalone Root Lithium Project. The updated PEA outlines a robust development pathway for the Root Project, featuring a combination. Executive Summary. The Company previously completed a Preliminary Economic Assessment (PEA) in December 20232, which assessed two overall project development scenarios: a combined mine and concentrators development at Seymour and Root, and. b) an integrated project with a converter for battery-grade lithium hydroxide production. The Company has now completed a standalone PEA for the Root project, that considers: "The updated Root Mineral Resource estimate (MRE) of 20.1Mt @ 1.24% (including 10.0 Mt at 1.33% Li2O in the Indicated category and 10.1 Mt at 1.13% Li2O in the Inferred category3. The study highlights strong projected economics for the Project, underpinned by an extended mine and processing life, attractive capital and operating cost profiles, and a favourable low corporate tax environment. In addition to these robust fundamentals, the Project offers further upside potential through future optimisation and resource growth. The results confirm the economic viability of the project, reaffirming GT1's potential to become a significant North American producer of lithium concentrates and to progress further project studies and development efforts. Root Project Resource Update. The standalone PEA is underpinned by the recently announced 2025 Mineral Resource Estimate, which identified 20.1Mt @1.24% These compared to a USD 2,500 pit shell used in the 2023 PEA for both the Root Bay & McCombe pits, which were previously only considered for Open pit development. The new shells and pit design, coupled with underground development, significantly reduce total material movement, waste placement and storage by ~70%, with significant subsequent mining cost savings. Underground mining cost and development parameters are based on benchmark data from underground operations. The revised geotechnical parameters result in reduced waste removal with subsequent reduction in mining costs. Mine Development.cept mine development plans and costs were prepared for each option in Table 1, with key details summarised in Table 2. Preliminary cashflow analysis was conducted to rank the mine development options and select an option as the basis for this optimised PEA. Mine pre-production previously CAD 79 million. Contingency set at 15%. Mining pre-production capex. Mining SCHEDULE. Several pricing sources were sourced for this PEA update and to assess an average price over the production period, making use of SC6 pricing forecasts from several sources including EcoPro Innovation (GT1 strategic partner), Fastmarkets, Benchmark Mineral Intelligence and Wood Mackenzie, from which an average annual spodumene concentrate price was used for the and adjusted for 5.5% Li2O spodumene concentrate (SC5.5) product. Given the early stage of the project a preliminary financing strategy has been considered and will be further developed closer to the completion of the Definitive Feasibility Study which is due to be completed in 2026. The current strategy which is well structured at this early stage gives the Company confidence that the project's strong preliminary economics will attract support to continue with the next stages of development studies.