お知らせ • Jan 27
Gladiator Metals Intersects 92m @ 1.03% Cu & 393 Ppm Mo from 2M At Cowley, Extending Near Surface, High-Grade Mineralization
Gladiator Metals Corp. reported assay results from the last 32 drill holes, totalling 8,072 metres drilled at its Cowley prospect in 2025. Vertical Expansion: High-grade skarn mineralization intersected in the Southern Limb was extended vertically by 85m from previous intercepts, confirming continuity of the limb and unlocking further potential of the southern limb, where Gladiator plans to bring mineralization to near surface under Class 3 permit drilling. Major Scale: The Cowley mineralized system now boasts a large lateral footprint of over 1,200m in strike length, 450m in width, and 300m in depth, and remains open in every direction, offering significant opportunity for further discovery. New Discovery: A sub-parallel zone of mineralization was intercepted at depth in hole CPG-114D1, with magnetic data now pointing to over 600m of untested strike potential - setting the stage for future exploration. Recent drilling at Cowley continues to extend strong near-surface copper, gold, and molybdenum mineralization. Drilling on the far east side of the Northern Limb (310m east of CPG-112D2) continued to intercept significant mineralization, with further drilling planned to be completed under Class 3 permit conditions to extend mineralization further east along strike. Also noteworthy is the discovery of a new, subparallel zone of mineralization at depth. CPG-112D2: Delivered clear confirmation of the continuity of near-surface, high-grade copper mineralization, significantly advancing efforts to define substantial high-grade copper resources. Importantly, drill tested new exploration targets proximal to the known system, highlighting meaningful opportunities for extensions to known high-grade copper skarn mineralization and identifying promising sub-parallel trends. Drilling completed on the west side of the northern limb returned exceptional results, including: CPG-112D2 returned 130m @ 0.78% Cu & 293 ppm Mo from 2m, including: 92m @ 1.03% Cu 0.11 g/t Au, 6.38 g/t Ag & 393 ppm Mo from 2m; incl. 24m @ 1.68% Cu, 0.18 g/t Au, 13.86 g/t Ag & 332 ppm Mo from 2m; and. CPG-112 returned 34.0m @ 0.54% Cu, 0.11 g/t Ag, 3.02 g/t Ag & 253 ppm Mo from 26.0m, including: Drilling on the far East side of Cowley's Northern Limb (~310m east of C P112D2) continued to intercepted significant mineralization, with further drill planned to be completed under Class3 permit conditions to further extend the mineralization east along strike. While awaiting approval of the Class 3 permit, Gladiator has maintained strong momentum by continuing to drill across accessible extents of the system. Definition drilling is scheduled to be completed in 2026 under a Class 3 permit that is currently under review. This will be a critical step, as it will allow Gladiator Metals to drill line by line, systematic cross sections to deliver maiden resources for the Whitehorse Copper Project. Results from the ongoing resource definition drilling have affirmed the continuity of the mineralized system across the broader Cowley area. Drilling to be completed under the Class 3 permit will be included in the maiden resource estimate for Cowley, which is scheduled for 2026. The reported drilling at the Cowley is part of ~50,000m of drilling completed during 2025 targeting high-grade copper skarns throughout the Whitehorse Copper Belt, including the recently announced Cub East Discovery. Cowley Exploration: Targeting upside potential for further copper-skarn mineralization at Cowley, including drill testing of the highly ranked Cowley lookalike at Great Southern (2km south of Cowley resource definition drilling). Drilling will be supported by planned geophysical programs including Induced Polarization (ongoing), Electromagnetic and Gravity surveys to help refine drill targeting in the prospect areas and highlight undiscovered areas of exploration potential. Drilling completed in the prospect areas of exploration potential. Dr drilling completed by Gladiator is irregularly spaced to test parts of the mineralized systems, holes, holes, holes, holes and highlight und discovered in the prospect areas of exploration. Drilling completed by Gladiator is scheduled for future exploration potential. Drilling completed during 2025.