お知らせ • May 02
Ironveld PLC Provides Operational Update and Commences Layer 21 Mineralogical Study Ironveld PLC provided an update on the reconfiguration of the Lapon Plant and announced a new mineralogical study on Layer 21 at its flagship asset in South Africa. Following a detailed metallurgical audit to address product variability, the Company has implemented key technical improvements as part of a reconfiguration of the Lapon Plant, which is operated and managed by Daemaneng Minerals ("Daemaneng") on behalf of the Company. The main steps completed or in progress include: Upgraded water supply and storage systems to ensure continuous plant operations. Relocated and optimised the sizing cyclone to maximise separation efficiency. Installed a new axial-aligned magnetic separator, expected to consistently deliver DMS-grade magnetite product above 90% magnetic purity. Replaced product pipelines and finalised product storage facilities, with concrete floors completed on 28 April 2026. The programme is approximately four days behind schedule due to persistent inclement weather affecting concrete works. The Company's contractor, Daemaneng, is confident of achieving first deliveries of DMS-grade magnetite under the existing offtake contract during May 2026. Furthermore, Daemaneng expects to reach sustained production of 2,500 tonnes per month by June 2026, followed by a gradual increase thereafter. The Company is targeting the plant's full capacity of 7,500 tonnes per month by the end of 2026 at the very latest, with the potential to reach this level significantly earlier as operational efficiencies improve. In addition to the existing contract, the Company has several offtake options at an advanced stage of negotiation, with ongoing alignment on price and terms. However, the Company is not committing to signing new offtake agreements until production capacity is firmly established and can be appropriately aligned with demand and supply capability. These options will then be activated and scaled progressively as production volumes increase. Ironveld has engaged Mintek, South Africa's national mineral research organisation, to perform a mineralogical study on two boreholes from Layer 21 of the magnetite layers, which occur across the company's mining rights. Layer 21 is a magnetite-bearing horizon which outcrops on surface to the west of the main magnetite layer in the mining right area. It contains ilmenite and apatite that may contain rare earth elements ("REEs"). With plant reconfiguration nearing completion and first deliveries imminent, the Company is now in a position to look beyond near-term production and assess the broader mineral potential of its asset. Understanding the composition and variability of Layer 21 will inform future mine planning, potential by-product recovery, and the possibility of selectively mining higher-value zones. The study will specifically investigate the possible presence of a discrete ilmenite (titanium) layer, as well as assess the occurrence of apatite-hosted phosphates to determine whether a discrete apatite-rich layer exists. Additionally, the study will evaluate the potential for REEs, which are often associated with apatite mineralisation and are critical to modern technologies such as renewable energy systems, electronics, and defence applications. The Company will provide further updates as required. お知らせ • Mar 31
Ironveld Plc has filed a Follow-on Equity Offering. Ironveld Plc has filed a Follow-on Equity Offering.
Security Name: Ordinary Shares
Security Type: Common Stock
Transaction Features: Subsequent Direct Listing お知らせ • Sep 10
Ironveld Plc, Annual General Meeting, Oct 07, 2025 Ironveld Plc, Annual General Meeting, Oct 07, 2025. Location: the offices of orana corporate llp, eccleston yards, 25 eccleston place, sw1w 9nf, london United Kingdom お知らせ • Jun 19
Ironveld plc Announces Resignation of Malebo Ratlhagane as Director, Effective June 17, 2025 Ironveld plc announced that Malebo Ratlhagane has resigned as a director of the Company for personal reasons, with effect from 17 June 2025. お知らせ • Jun 11
Ironveld Plc has completed a Follow-on Equity Offering in the amount of £0.9 million. Ironveld Plc has completed a Follow-on Equity Offering in the amount of £0.9 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 2,000,000,000
Price\Range: £0.00045
Security Features: Attached Warrants
Transaction Features: Subsequent Direct Listing お知らせ • May 22
Ironveld plc Provides Operational Update Ironveld PLC provided the following update on key operational developments across its DMS plant, mining operations, and smelting initiatives. Dense Media Separation (DMS) Plant: Construction of the first phase of the DMS plant is now complete and the plant has been commissioned. Production ramp-up from stockpiled material is currently underway. Trial production runs have been successfully completed and are now commencing commercial production of DMS grade magnetite for existing offtake agreement with Sable Platinum Pty Ltd. Initial output from the DMS plant has been analysed by an external laboratory and the results show that the magnetite product meets the required market specifications. A Heads of Agreement for a Joint Venture with Sable Platinum Pty Limited has been concluded; final legal documentation is in progress and expected to be finalised in the next few weeks. Further details were notified by the Company on 6 March 2025. Offtake agreements for the DMS grade magnetite product are at an advanced stage, and the company have potential to sell significant quantities into Mozambique, as well as locally in South Africa, where company are currently in the bidding process for a tender as previously communicated on February 12, 2025. Mining Operations: Overburden clearance of the first mining bench has been completed. The drilling plan has been developed and finalised, and drilling for the first blast is scheduled to be completed imminently by a third-party contractor. The first blast of fresh ore is scheduled to take place immediately following the completion of drilling, utilising the same contractor engaged for the drilling operations. Discussions with potential offtake partners for ore sales are progressing positively, with strong interest from multiple parties targeting export markets. Smelting Development: An initial engineering study for a small-scale, water-based atomiser plant to produce high-purity iron powder has been completed. A comprehensive design data pack including engineering drawings, proposed procurement strategies, and a list of recommended suppliers for the pilot water-atomised high-purity iron powder plant is currently being reviewed by Ironveld's team and its consultants.