お知らせ • Jul 14
Japan Gold Completes 3D Induced Polarization Survey and Identifies Multiple Geophysical Targets At the Bajo Project Japan Gold announced the completion of an expanded 3D Induced Polarization and resistivity geophysical survey at the Bajo Project in Japan. A total of 37.6 line-kilometres of 3D IP was completed over an 8 km by 5 km area at Bajo between February and May 2026. The 3D IP survey was successful in identifying multiple chargeability and resistivity anomalies that are interpreted to be comparable to geophysical signatures observed in areas of historical mining. The survey was designed to characterize the geophysical response associated with known veins, including the Sakuru-Hi vein, which historically reported grades of up to 125.9 g/t Au and 557 g/t Ag, and apply this interpretation across the 8 km-long project area. Preliminary interpretations of the survey results suggest the presence of extensions and sub-parallel features that appear continuous across multiple survey lines, with interpreted strike lengths exceeding 1 km. These interpreted anomalies show strong spatial correlation with mapped surface alteration, veins, and structural trends across the project area. With multiple prospective anomalies identified by the 3D IP survey, the next phase of exploration will focus on target prioritization, followed by the planning and execution of a diamond drilling program in consultation with local stakeholders. The drilling program will be designed to test the highest-priority geophysical anomalies supported by the integrated geological and structural interpretation of the project area. お知らせ • Jun 23
Japan Gold Corp. announced that it has received CAD 1.393 million in funding from Equinox Partners Investment Management LLC On June 22, 2026, Japan Gold Corp closed the transaction. お知らせ • Jun 13
Japan Gold Corp. announced that it expects to receive $1.393 million in funding from Equinox Partners Investment Management LLC Japan Gold Corp. announced a non brokered private placement of 10% unsecured convertible debentures for gross proceeds of $1,393,000 on June 12, 2026. The transaction will include participation from returning investor Equinox Partners Investment Management LLC. The debenture will mature on the date that is three years from the date of issuance. The debenture will bear interest at a rate of 10% per annum. The debenture and any securities issuable upon conversion will be subject to a statutory hold period of four months from the date of issuance of the debenture. The offering and conversion of the debenture into shares is subject to final approval by the TSX-V. As of the closing date, investor holds 90,133,518 shares, representing approximately 29.32% of the then issued and outstanding common shares of the company. お知らせ • Apr 23
Japan Gold Corp. announced that it has received CAD 1.3907 million in funding from Equinox Partners Investment Management LLC On April 23, 2026, Japan Gold Corp. closed the transaction. お知らせ • Apr 10
Japan Gold Corp. announced that it expects to receive $1 million in funding from Equinox Partners Investment Management LLC Japan Gold Corp. announced a non-brokered private placement of unsecured convertible debentures for gross proceeds of CAD 1,390,700 ($1,000,000) on April 10, 2026. The Debenture will mature on the date that is three years from the date of issuance (the "Maturity Date"). The Debenture will bear interest at a rate of 10% per annum (non-compounded), accruing daily but payable, in cash, only at the Maturity Date, on the occurrence of an Event of Default or upon an early redemption. he Debenture and any securities issuable upon conversion will be subject to a statutory hold period of four months from the date of issuance of the Debenture. The Offering and conversion of the Debenture into Shares is subject to final approval by the TSX Venture Exchange. As of the Closing Date, Equinox holds 90,133,518 shares, representing approximately 29.34% of the then issued and outstanding common shares of the Company. . The Company will have the right, at its option, to make an early redemption in cash of all or any part of the principal amount together with payment of any accrued but unpaid interest. In addition, the Company will have the right, at its election, to satisfy its obligation to pay cash to the Debenture holder through the delivery of common shares of the Company ("Shares") in lieu of cash, at a price per share which equals the greater of: (i) the most recent Market Price of the Shares on the TSX Venture Exchange on the date that the accrued interest becomes payable; (ii) $0.11; and (iii) a price per security or conversion price of debt securities in a Future Financing Event. The transaction will include participation from returning investor Equinox Partners Investment Management, LLC. お知らせ • Mar 04
Japan Gold Corp. Identifies Multiple Geophysical Anomalies At Hakuryu Project Japan Gold Corp. announced that it has completed its review of the Controlled-Source Audio Magnetotellurics ("CSAMT") and natural source (AMT) geophysical survey results from the December 2025 program at the Hakuryu Project in Hokkaido, Japan. The survey results identified multiple resistivity anomalies that correlate with previously mapped surface alteration zones and projected vein trends. These resistivity anomalies extend across multiple survey lines, suggesting continuity along strike within the proposed target areas. The confirmation of multiple anomalies at depth along the approximately five-kilometre prospective strike length supports proceeding with drill pad preparation in advance of a planned drilling campaign to further evaluate the project area. The next phase of drilling is being designed to follow up on the anomalies identified in the recent geophysical survey, as well as the 2025 drill hole DDH-HAK-001, which intersected 16.15 g/t gold over 0.60 metres from 103.8 metres downhole (a re-assay of the same interval returned 24.10 g/t gold over0.60 metres). The Hakuryu Project is located at the southern end of the 16-kilometre-long Konomai gold field. The northern and central portions of the Konomai vein field were historically developed and mined by Sumitomo Metal Mining Co. Ltd. between 1915 and 1973, reportedly producing approximately 2.35 Moz of gold at an average grade of 6.4 g/t. お知らせ • Jan 23
Japan Gold Reports Additional Gold Intercepts At Mizobe Project Japan Gold Corp. announced results from two diamond drill holes totaling 1,156 metres completed at the Mizobe Project ("MZDD23-003"), intersecting gold mineralization in both drill holes and recording the first intercept of a banded chalcedony vein. The Mizobe Project is located in the Hokusatsu district of southern Kyushu, Japan, approximately 23 kilometres south of the Hishikari Mine, operated by Sumitomo Metal Mining Co. Ltd. Highlights. The Company is encouraged by the presence of hydrothermal alteration, along with associated anomalous metals and pathfinder elements identified to date. Future exploration will focus on further delineating the extent of the alteration system, improving the understanding of the source and controls of the alteration and associated geochemical anomalies, and evaluating areas with potential for more strongly developed mineralization. Previous Drilling. Historical drilling completed in 2023 at the Mizobe Project under the Barrick Alliance intersected gold mineralization beneath post-mineral cover. Notable historic intercepts include 10.0m at 4.27g/t Au from 122.75m (MZDD23-003) and 4.0m at 1.60g/t Au from 36.5m (M ZDD23-004). 2025 Drill Program. The 2025 drill program was designed to test for the presence and potential continuity of mineralization beneath mineralization intersected in historical drill holes MZDD23-003 and MZDD23-004. Drilling has intersected zones of hydrothermal alteration associated with anomalous gold, arsenic, and antimony beneath post-min mineral cover. Based on current drilling, the alteration has been observed in multiple drill holes. The alteration and associated geochemical anomalies appear to be controlled by the rock type and are best developed in the upper portions of the drill holes. All reported intervals are downhole core lengths; true widths have not yet been determined. Sampling techniques and Assaying are from drill core samples obtained by PQ, HQ and NQ-size triple-tube diamond core drilling using a PMC-700 drill rig owned and operated by the Company. The drilling program was fully supervised by Company senior geologists at the drilling site. The drill core was collected in plastic core trays at the drill site and transported by road in Company vehicles to its Kagoshima office and core processing facility near the project area. The drill core was carefully logged, photographed and sample intervals were marked up along predicted mineralized and unmineralized intervals along the entirety of the drill holes by Japan Gold senior project geologists. Sample lengths varied from 0.3 to 2.0 metres, depending on the positions of geological contacts and variations in alteration composition. The core was split by a diamond rock saw supervised by project geologists. Certified Reference Materials ("CRMs") were inserted by Japan Gold KK at every 20th sample to assess the repeatability of the alteration and associated geophysical anomalies.