Annuncio • May 23
Locksley Resources Limited Announces High-Grade Antimony Intervals Intersected At the Desert Antimony Mine Locksley Resources Limited announced the maiden drill program at its Desert Antimony Mine confirmed high-grade antimony mineralization below the historical underground workings. Significant antimony intersections returned from six of the eight completed drill holes demonstrated: Peak value of 33.51% Sb over 0.4m inc 4.0m @ 4.87% Sb in hole DADD005A 2.0m @ w.69^ Sb in hole DADD0003 1.4m @ 5.62% in hole DADD0004. Drilling confirms continuity of high-grade surface stibnite mineralization along strike and below the historical underground workings supporting geological modelling and future drill targeting. Specific details on the drilling results can be found here: Antimony is designated as a critical mineral by the U.S. government, with limited current domestic production. The Desert Antimony Mine represents a rare opportunity to establish a primary, high-grade antimony source within the U.S. aligned with national security, defense and advanced materials supply chains. Board Change • May 20
No independent directors There are 5 new directors who have joined the board in the last 3 years. Of these new board members, none were independent directors. The company's board is composed of: 5 new directors. No experienced directors. No highly experienced directors. No independent directors (3 non-independent directors). Member of Advisory Board Peter Lambert is the most experienced director on the board, commencing their role in 2025. The following issues are considered to be risks according to the Simply Wall St Risk Model: Lack of independent directors. Lack of board continuity. Lack of experienced directors. Annuncio • Apr 10
Locksley Resources Commences Diamond Drilling At El Campo Rare Earth Prospect Part Of Its Mojave Project In California Locksley Resources announced it has commenced diamond drilling at the El Campo Rare Earth (REE) Prospect, part of its Mojave Project in California. The drilling program represents Locksley's first systematic drill testing of El Campo and is designed to evaluate the scale, continuity and geological characteristics of REE mineralization identified through historical work and recent surface sampling. The maiden program comprises four initial diamond drill holes targeting sheared carbonatite-hosted REE mineralization and will test the depth and lateral continuity of mineralization along 900m of strike, where previous surface sampling returned results of up to 12.1% TREO. El Campo is strategically located approximately four miles southeast of MP Materials' Mountain Pass REE Mine, a globally significant REE producer. The company is actively advancing the Mojave Project in California, targeting rare earth elements (REEs) and antimony. Locksley is executing a mine-to-market strategy for antimony, aimed at reestablishing domestic supply chains for critical materials, underpinned by strategic downstream technology partnerships with leading U.S. research institutions and industry partners. This targeted approach, combined with resource development with innovative processing and separation technologies, positions Locksley to play a role in advancing U.S. critical materials independence. Annuncio • Mar 13
Locksley Resources Ltd Achieves 99.5% Purity Antimony Trioxide Locksley Resources Ltd. announced it has achieved a significant metallurgical milestone with the successful production of 99.5% purity antimony trioxide from feedstock sourced from the Desert Antimony Mine at the Mojave Project in California. The result, achieved through the Company's metallurgical optimization program, demonstrated the potential to produce high-purity antimony products capable of helping supply strategic Western defense and industrial supply chains. Since antimony is classified as a critical mineral and the global supply is heavily concentrated in China, this achievement represents an important step in Locksley's strategy to help reestablish secure, 100% American made, antimony production and refining capability. Locksley is one of the few antimony-focused development projects in the US capable of directly controlling mining, processing and product specification. Demonstrating that feedstock from the Desert Antimony Mine can be upgraded to 99.5% purity antimony trioxide is a very significant achievement and validates the potential to produce high value refined, 100% American-made antimony products from their Mojave Project. This result reinforces the potential for their Mojave Project to play an important role in supporting future U.S. government and industrial demand for antimony. Antimony is essential for defense systems, munitions, electronics and advanced industrial applications. Achieving more than 99.5% purity antimony trioxide meets a key threshold for entry into specialized markets and enables a pathway for qualification with defense and strategic supply chain participants. The principal barrier to domestic antimony supply in the US is not ore availability, but the lack of US processing and refining capability. Locksley Resources Limited is focused on critical minerals in the United States of America. The Company is actively advancing the Mojave Project in California, targeting rare earth elements (REEs) and antimony. Locksley is executing a mine-to-market strategy for antimony, aimed at re-establishing domestic supply chains for critical materials, underpinned by strategic downstream technology partnerships with leading US research institutions and industry partners. This integrated approach combines resource development with innovative processing and separation technologies, positioning Locksley to play a key role in advancing US critical minerals independence. Annuncio • Mar 03
Locksley Resources Limited Announces High-Grade Antimony Assays At Desert Antimony Mine Locksley Resources Limited announced high-grade antimony (Sb) assays received from surface exposure grab sampling, with a peak value of 16.90% Sb confirm continuity of high-grade stibnite mineralization along strike and above the historical underground workings at the company's Desert Antimony Mine located within the Company's Mojave Project in California. These samples were collected from earthworks conducted during preparation for the maiden drilling program currently underway. The work identified extensions of stibnite-bearing mineralized veins at surface, further validating the system's high-grade continuity and strike potential. The results continue to reflect the company's strong technical foundation and focus on high-confidence targets. Ongoing diamond drilling at DAM is expected to further refine geometry and evaluate resource potential. Annuncio • Feb 24
Locksley Resources Limited Commences Diamond Drilling At the High-Grade Desert Antimony Mine Located Within the Company's Mojave Project in California Locksley Resources Limited announced the company has commenced diamond drilling at the high-grade Desert Antimony Mine (DAM), located within the company's Mojave Project in California. The drilling follows successful completion of site establishment activities including necessary earthworks and construction of drill pads. During these site preparations, the company also conducted detailed surface explore mapping that provided critical geological data and confirmed the orientation and continuity of the primary stibnite veins at surface. Antimony is designated as a critical mineral by the U.S. government, with limited current domestic production. The Desert Antimony Mine represents a rare opportunity to establish a primary, high-grade antimony source within the U.S. aligned with national security, defense and advanced materials supply chains. Annuncio • Feb 11
Locksley Resources Limited' Underground Mapping Reveals Major New Target Boosting High-Grade Antimony Potential At Its Mojave Project Desert Antimony Mine Locksley Resources Limited announced a major new target zone revealed by underground mapping at its Desert Antimony Mine (DAM), part of the company's Mojave Project. This notable finding, the Beefeater Shear, is a shear zone corridor mapped at widths of up to 10-15 meters and a result of a comprehensive Stage III technical review focusing on the Northern Block. This included high-resolution underground mapping at the DAM and regional structural analysis. Locksley's geology team considers Beefeater to share the same structural timing and kinematic history as the DAM mineralized vein system to the West. These insights along with the validation of project-wide radiometric targets, pave the way for targeted sampling and drilling to confirm mineralization and economic potential. By mapping the underground workings at DAM the company has essentially "unlocked" the geometry of the system. The identification of the 10-15 meter Beefeater Shear provides Locksley with a new exploration target that can increase the exploration pipeline of critical mineral projects on the Mojave claims. The company is actively advancing the Mojave Project in California, targeting rare earth elements (REEs) and antimony. Locksley is executing a mine-to-market strategy for antimony, aimed at reestablishing domestic supply chains for critical materials, underpinned by strategic downstream technology partnerships with leading U.S. research institutions and industry partners. This targeted approach, combined with resource development with innovative processing and separation technologies, positions Locksley to play a role in advancing U.S. critical materials independence. Annuncio • Feb 04
Locksley Resources Limited Announces High-Grade Antimony Results from Batch Sampling Program At Its Mojave Project Locksley Resources Limited announced that a batch sampling program at the DAM antimony (Sb) deposit, part of the Mojave Project in California, returned high grade antimony results. The batch sampling program, which was designed to further evaluate the high-grade antimony mineralization at DAM following technical milestones achieved in late 2025, including a 325kg sample and the production of a 68.1% Sb premium concentrate, targeted specific mineralized vein material within the historical workings. Annuncio • Jan 07
Locksley Resources Confirms Continuous High Grade Mineralized Silver Corridor At Its Mojave Project in California Locksley Resources announced it has confirmed a continuous, high grade mineralized silver corridor at its Mojave Project in California following extensive surface reconnaissance and rock chip sampling across the North Block. The results materially extend known mineralization beyond the initial high grade silver discovery and strengthen the geological understanding of the project area. The discovery represents an important advancement in the Company's exploration strategy and identifies a new, potentially high-value component of the Mojave Project. Board Change • Dec 30
No independent directors There are 5 new directors who have joined the board in the last 3 years. Of these new board members, none were independent directors. The company's board is composed of: 5 new directors. No experienced directors. No highly experienced directors. No independent directors (3 non-independent directors). Non-Executive Chairman Pat Burke is the most experienced director on the board, commencing their role in 2025. The following issues are considered to be risks according to the Simply Wall St Risk Model: Lack of independent directors. Lack of board continuity. Lack of experienced directors. Annuncio • Dec 16
Locksley Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 1.882588 million. Locksley Resources Limited has completed a Follow-on Equity Offering in the amount of AUD 1.882588 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 6,998,802
Price\Range: AUD 0.24
Discount Per Security: AUD 0.0144
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 845,313
Price\Range: AUD 0.24
Discount Per Security: AUD 0.0144
Transaction Features: Subsequent Direct Listing Annuncio • Dec 09
Locksley Resources Limited has filed a Follow-on Equity Offering in the amount of AUD 17 million. Locksley Resources Limited has filed a Follow-on Equity Offering in the amount of AUD 17 million.
Security Name: Ordinary Shares
Security Type: Common Stock
Securities Offered: 70,833,334
Price\Range: AUD 0.24
Discount Per Security: AUD 0.0144
Transaction Features: Subsequent Direct Listing Annuncio • Nov 25
Locksley Resources Ltd. Appoints Stacy Newstead to its Advisory Board as Strategic Advisor-Materials Strategy Locksley Resources Ltd. announced the company has appointed Stacy Newstead to its advisory board as Strategic Advisor-Materials Strategy. Ms. Newstead brings more than 20 years of experience across U.S. government, defense and industrial sectors. She currently serves as Materials Strategy and Risk Manager at Lockheed Martin, where she leads initiatives to secure domestic and allied sources of key materials vital to U.S. defense manufacturing and national security. Her work focuses on assessing and mitigating material pricing and geopolitical risk across supply chains that underpin critical technologies including munitions, batteries, and aerospace systems. Her prior roles include senior program leadership at Huntington Ingalls Industries and Textron Systems, as well as CEO of the U.S. subsidiary of Evolution Energy Minerals, where she led onshoring initiatives for graphite and advanced battery materials. Annuncio • Nov 13
Locksley Resources, Ltd. Advances Toward US Antimony Production Locksley Resources Ltd. provided an update on the company's progress and immediate plans as they aggressively move forward their Desert Antimony Mine (DAM) Prospect, located within the Mojave Project in San Bernardino County. The company has: Initiated development planning for extraction of mineralization, definitive financing (leveraging the recent EXIM LOI), permitting and pilot plant processing operations. received expressions of interest from U.S. engineering contractors to commence with extraction of mineralization at the DAM mine, marking the start of development. DAM underground access assessment confirms the structural stability and accessibility of the historical workings, supporting safe re-entry and phased mine development planning toward future development. DAM site inspection by mining engineers scheduled for later this month as part of initial engineering and design studies to meet planned pilot plant throughput. Following underground LiDAR surveying that confirmed approximately 236m of Development across four levels spanning a 130m strike length, the company established an exploration target at DAM containing 19,400 to 67,000 tons of antimony metal. These estimates are conceptual in nature and there has been insufficient exploration to date to estimate a Mineral Resource. The Exploration Target has been prepared and reported in accordance with the JORC Code (2012). The recently completed 325 kg bulk sampling delivered a high head grade of 7.6% to 7.8% Sb with flotation testwork underway and supported by the initial sighter testwork completed on a 23.1kg sample at 9.6% Sb, which delivered a 68.1% Sb premium concentrate, meeting industrial and defense specifications. The company has multiple exploration activities in progress and planned with key activities and timeframes including: Underground mapping - currently underway and due for completion November 2025. Underground sampling - work planned to commence (assuming ability for safe working) in November 2025 with an approximate one-month time to assay results. Surface Sampling - initial program has commenced. Assays from previous samples taken are expected late November-early December 2025. Drilling - a plan of operations has been approved pending payment of required bond. Upon payment, Company is approved to drill up to 16 holes at DAM Prospect. The company currently expects to commence drilling at the El Campo Prospect in late Fourth Quarter 2025/early First Quarter 2026 and anticipated commencing drilling at DAM subsequent to completing El Campo. Magnetic Geophysics Interpretation - Geophysical Consultants SGC has commenced with a regional magnetic image interpretation to define the structural geology across the Mojave Project. This will inform geological testing for new and additional structures and potentially further support the DAM exploration target. Work is expected to be completed by First Quarter 2026. Surface Structural & Geological Mapping - a third mapping program is scheduled to commence late November, expanding two previous phases of activity. Streamiment Sampling - a regional stream sediment sampling program is currently in the final planning phases. The field collection is scheduled to be completed in Fourth Quarter 2025 (weather permitting). If samples are collected in Fourth Quarter 2025 analysis results are anticipated in First Quarter 2026. Locksley Resources is focused on critical minerals in the U.S. The company is actively advancing the Mojave Project in California, targeting rare earth elements (REEs) andantimony. Locksley is executing a mine-to-market strategy for antimony, aimed at the first quarter of 2025. Annuncio • Nov 04
Locksley Resources Limited Receives Up to USD 191 Million Potential Support from EXIM for U.S. Critical Minerals Push Locksley Resources Limited announced the receipt of a Letter of Interest (LOI) from the Export-Import Bank of the United States (EXIM) outlining the intent to provide up to USD 191 million in potential project financing support for the Company's Mojave Project in California. EXIM, a wholly owned independent agency of the U.S. Government, operates under a Congressional mandate to promote American economic and national security interests through project and export financing. Its recent Supply Chain Resiliency Initiative and China and Transformational Exports Program prioritize funding for critical mineral projects that reduce foreign supply dependence and rebuild U.S. industrial capability. Locksley continues to accelerate development and shorten the traditional mining project timeline via government support across parallel workstreams. Upstream the company has fast-tracked development of the Desert Antimony Mine through both conventional and non-traditional methods, enabling near-term ore supply. Downstream the company is collaborating with Rice University's Deep Solve™ program and modular processing options to establish U.S. refining capacity at speed. And, by focusing on direct alignment with U.S. defense, energy transition and industrial partners to deliver 100% Made in America antimony, the company is establishing an integrated supply chain. This multiple track approach positions Mojave as one of the fastest moving U.S. antimony developments, directly supporting U.S. national security and clean energy priorities. Annuncio • Oct 21
Locksley Resources Ltd. Unveils First 100% American Made Antimony Ingot Locksley Resources Ltd. announced the company has achieved a significant milestone with the production of a 100% American made antimony ingot, indicating the return of U.S. domestic antimony metal production in decades. The milestone represents proof-of-concept for a fully American mine-to-metal supply chain. The ore was sourced at the Company's Mojave Desert Antimony Mine in California, and refined entirely within the U.S. by Hazen Research Inc., a well-respected metallurgical and process development U.S.-based laboratory. She noted that now that Locksley has proof-of- concept, the company is going to focus its efforts on scaling this achievement into a sustainable, commercial supply chain to support America's industrial and defense sectors. Locksley is collaborating closely with its strategic partners, and Washington DC based advisors, GreenMet, to advance permitting and funding initiatives to support the next stage of the company's commercialization efforts. Locksley Resources is focused on critical minerals in the U.S. The company is actively advancing the Mojave Project in California, targeting rare earth elements (REEs) and antimony. Locksley is executing a mine-to-market strategy for antimony, aimed at re- establishing domestic supply chains for critical materials, underpinned by strategic downstream technology partnerships with leading U.S. research institutions and industry partners. This integrated approach combines resource development with innovative processing and separation technologies, positioning Locksley to play a key role in advancing U.S. critical minerals independence. Annuncio • Oct 14
Locksley Resources Announces the Appointment of Peter J. Lambert to Advisory Board Locksley Resources announced the appointment of Major General (Ret.) Peter J. Lambert to the company's advisory board. He brings to Locksley more than three decades of leadership in intelligence, defense, and advanced technology integration, combining a distinguished U.S. Air Force career with senior executive experience in the private sector, most notably with General Dynamics Information Technology, one of America's leading defense and technology companies. Peter's appointment to the Locksley Advisory Board comes at a pivotal time for the United States as the country seeks to secure and strengthen its domestic supply of critical minerals. His exceptional background, which spans military intelligence, defense industry leadership, and strategic operations, will bring immense value to Locksley as the company advances its Mojave Project and broader North American expansion strategy. Gen. Lambert's appointment aligns with Locksley's 100% American mine-to-market vision, leveraging defense grade systems integration, operational intelligence, and secure supply-chain development, specifically in the critical minerals space. His expertise is expected to be invaluable in the areas of advanced systems integration and intelligence-driven decision-making, strategic capability development and organizational design, government, defense and industry engagement, and strategic foresight and risk intelligence. Annuncio • Oct 03
Locksley Resources Limited, Annual General Meeting, Nov 28, 2025 Locksley Resources Limited, Annual General Meeting, Nov 28, 2025. Annuncio • Sep 23
Locksley Resources Ltd. Continues to Strengthen its Position in Paving Pathway to 100% Made in America Locksley Resources Ltd. announced it has achieved significant results from initial metallurgical testwork completed by the company on samples collected from the Desert Antimony Mine (DAM) Prospect. These results validate that the Mojave Project can deliver feedstock required to underpin a domestic mine-to-market antimony supply chain. Recovery rates of the level indicated in the initial testing confirm Locksley's pathway to 100% Made in America Antimony, which is directly aligned with U.S. government priorities for onshore critical mineral supply security. For the six samples assessed, antimony grades ranged from a low of 27.5% to a high of 39.1%. Recovery rates ranged from 82.9% to 85.9% among the six samples. Concentrate from these tests was sent to Rice University to commence with Deep Eutectic Solvent Extraction testwork using Rice University's Deep Solv™? methodology, in conjunction with the recently announced partnership by Locksley and Rice. Annuncio • Sep 15
Locksley Resources Ltd. Announces Significant Expansion of Its Exploration Program for Both Rare Earths and Antimony Locksley Resources Ltd. announced it will significantly expand its exploration program at its significantly increased landholding in the Mojave Desert. Earlier this month the company announced the addition of 249 additional claims at the site, which abuts areas currently controlled by MP Materials, the only Rare Earths producing mine in North America. These new claims bring the company's total landholding to 491 claims encompassing more than 40 sq km of highly prospective critical minerals. The expanded program will be focused on exploration of both the existing antimony and rare earths elements prospects as well as targeting additional commodities that have been identified on Locksley's larger landholding. A substantial historical shaft has been discovered during a surface geological and structural mapping campaign recently undertaken by Locksley at Mojave. The shaft depth and the extent of the underground workings are being further evaluated and is estimated at more than 15m. Locksley is determining the composition of the commodities that were historically mined.