Anuncio • Oct 21
Aldon Oils Ltd. completed the acquisition of Calima Energy Inc from Calima Energy Limited (ASX:CE1). Aldon Oils Ltd. agreed to acquire Calima Energy Inc from Calima Energy Limited (ASX:CE1) for AUD 1.3 million on September 10, 2024. As part of the acquisition, Aldon Oils Ltd. will acquire 100% stake in Calima Energy Inc. A cash consideration of AUD 1.3 million will be paid by Aldon Oils Ltd. It is anticipated that the Sale will complete on or before 31 October 2024. The transaction is be subject to Calima Energy Shareholder approval.
Aldon Oils Ltd. completed the acquisition of Calima Energy Inc from Calima Energy Limited (ASX:CE1) on October 21, 2024. Anuncio • Sep 11
Aldon Oils Ltd. agreed to acquire Calima Energy Inc from Calima Energy Limited (ASX:CE1) for AUD 1.3 million. Aldon Oils Ltd. agreed to acquire Calima Energy Inc from Calima Energy Limited (ASX:CE1) for AUD 1.3 million on September 10, 2024. A cash consideration of AUD 1.3 million will be paid by Aldon Oils Ltd. As part of consideration, AUD 1.3 million is paid towards common equity of Calima Energy Inc. It is anticipated that the Sale will complete in the fourth quarter of 2024 Anuncio • Jun 08
Calima Energy Limited Announces Distribution, Payable on 21 June 2024 Calima Energy Limited announced that it will undertake a capital distribution to shareholders of AUD 80 million, equivalent to AUD 12.64 cents per share. On 24 May 2024, shareholders approved the distribution at Calima's 2023 Annual General Meeting. Trading in Shares on an `ex Distribution' basis date is 13 June 2024. Record date for the Proposed Distribution is 14 June 2024. Expected date of payment of the Proposed Distribution is 21 June 2024. Anuncio • Apr 04
Calima Energy Limited, Annual General Meeting, May 24, 2024 Calima Energy Limited, Annual General Meeting, May 24, 2024, at 10:00 W. Australia Standard Time. Location: Suite 4, 246-250 Railway Parade West Leederville Western Australia Australia Agenda: To consider election and appointment of directors. Anuncio • Feb 27
Astara Energy Corp. completed the acquisition of Blackspur Oil Corp. from Calima Energy Limited (ASX:CE1). Astara Energy Corp. entered into an agreement to acquire 100% stake in Blackspur Oil Corp. from Calima Energy Limited (ASX:CE1) for CAD 75 million on January 5, 2024. A Notice of Meeting will be issued shortly, which is subject to obtaining shareholder approval pursuant to Listing Rule 11.2 at an Extraordinary General Meeting expected to be held on 15 February 2024. The Blackspur Sale is anticipated to close 10 days post the meeting, however, no later than 30 March 2024. Astara has provided a CAD 5 million escrow deposit to secure its obligations pursuant to the definitive agreement in respect of the Blackspur Sale, which shall be executed via a Share Purchase Agreement.The SPA provides for a break fee of CAD 1.75 million in favor of Astara which may become payable by the Company, inter alia, in the event shareholders do not approve the Blackspur Sale or a superior acquisition proposal is announced or recommended in relation to Blackspur. National Bank Financial Inc. is acting as financial advisor with respect to the Blackspur Sale.
Astara Energy Corp. completed the acquisition of Blackspur Oil Corp. from Calima Energy Limited (ASX:CE1) on February 27, 2024. Anuncio • Jan 05
Astara Energy Corp. entered into an agreement to acquire 100% stake in Blackspur Oil Corp. from Calima Energy Limited (ASX:CE1) for a cash consideration of CAD 75 million prior to customary completion adjustments for net debt. Astara Energy Corp. entered into an agreement to acquire 100% stake in Blackspur Oil Corp. from Calima Energy Limited (ASX:CE1) for a cash consideration of CAD 75 million prior to customary completion adjustments for net debt on January 5, 2024. A Notice of Meeting will be issued shortly, which is subject to obtaining shareholder approval pursuant to Listing Rule 11.2 at an Extraordinary General Meeting expected to be held on 15 February 2024. The Blackspur Sale is anticipated to close 10 days post the meeting, however, no later than 30 March 2024. Astara has provided a CAD 5 million escrow deposit to secure its obligations pursuant to the definitive agreement in respect of the Blackspur Sale, which shall be executed via a Share Purchase Agreement.The SPA provides for a break fee of CAD 1.75 million in favor of Astara which may become payable by the Company, inter alia, in the event shareholders do not approve the Blackspur Sale or a superior acquisition proposal is announced or recommended in relation to Blackspur. Anuncio • Aug 27
Advantage Energy Ltd. (TSX:AAV) acquired Tommy Lakes facilities and Montney acreage from Calima Energy Limited (ASX:CE1) for AUD 11.8 million. Advantage Energy Ltd. (TSX:AAV) acquired Tommy Lakes facilities and Montney acreage from Calima Energy Limited (ASX:CE1) for AUD 11.8 million on August 25, 2023. Advantage Energy Ltd. (TSX:AAV) completed the acquisition of Tommy Lakes facilities and Montney acreage from Calima Energy Limited (ASX:CE1) on August 25, 2023. Anuncio • Aug 25
Calima Energy Limited Provides Production Guidance for the Full Year 2023 Calima Energy Limited provided production guidance for the full year 2023. The company will continue to focus on maintaining production at its Brooks and Thorsby assets in Alberta. Production guidance is expected at approximately 4,000 boe/day for 2023 with a reduced CAPEX budget leading to improved profitability. Anuncio • Feb 16
Calima Energy Limited Provides Preliminary Results on the Calima #2 and Calima #3 Test Program Calima Energy Limited provided preliminary results on the Calima #2 and Calima #3 test program. Flow test results to date: Management has been very pleased with the preliminary test results on the Calima #2 well with condensate yields significantly higher than the original limited test program completed in 2019. The testing program flows the wells at multiple constrained rates and pressurized gas sampling. This sampling will support laboratory tests required to do the Pressure-Volume-Temperature ("PVT") work to determine the NGL volumes present in the test fluids and in the reservoir. The data collected at multiple rates will also support the well test analysis and interpretation and the development of an accurate Inflow Performance Relationship ("IPR") curve and validation of type curves for the wells. Additionally the testing provides insight into the production parameters to be used on the well to maximise value when the wells are tied in. The Calima #2 well flowed at a maximum constrained rate of 6.3 mmcf/d and has delivered a peak condensate to gas ratio ("CGR") of 248 bbl/mmcf. This peak rate reflects "flush production" and the likely stabilised rate will be lower with average production to date being 102 bbl/mmcf. This rate reflects wellhead condensate only and excludes anticipated NGL's to be recovered through gas processing which may add an additional 15-25 bbls/mmcf of total liquids recovered. Condensate and NGL's provide substantially enhanced economics with condensate currently trading at a premium to WTI. Flow tests on the Calima #3 (Upper Montney) well have recovered significantly less load fluid to date versus the Calima #2 well. The Calima #3 well has flowed at a peak of 5.25 mmcf/d with 8.4 bbl/mmcf of condensate. The Upper Montney productivity potential has been historically an unknown, due to a lack of meaningful test data. The test results to date, whilst not yet reflecting total condensate yield potential as a result of low overall completion fluid recovery, will now allow for an improved development plan with proof of meaningful gas rates. Both wells are equipped with 60.3mm production tubing to enable efficient lifting of fluid over a range of production rates. This tubing size does constrain the maximum rate capability of the wells. This tubing restriction was not in place when maximum gas flow rates were achieved in Calima #2 in 2019. The key to the testing program, is to establish what the potential CGR of each of the wells, in addition to being able to calculate the maximum gas flow rates. The goal of the tests is to accurately determine how to maximize the CGR at various gas flow rates. The value molecule from the wells is the condensate, and the long-term plan will be to produce the wells at the rate that maximizes the value via optimal gas and condensate rates. Testing will continue for a further 3-10 days after which time the wells will be shut-in. The extensive test data obtained will be analysed to aid the Company in refining its type curves for each of the zones and will be incorporated in future reserve reports. The initial construction work related to the pipeline connecting the A-54-C pad containing Calima #2 and #3 to the Tommy Lakes infrastructure is about to commence. To take advantage of the current roads and logistical access to the area around the pad, the Company has decided to start construction work on the pipeline right- of-way in the vicinity of the current testing work. The Montney work program is funded from cash flow generated from the Brooks and Thorsby producing assets. Current production from Brooks and Thorsby is at historical highs of 4,600-4,700 boe/d. The sale of condensate produced during the Montney testing operations has also offset work program costs. - The Tommy Lakes Infrastructure lies immediately north of the Calima Lands and offers the closest, most cost-effective tie-in to processing facilities and regional pipeline networks. The horizontal wells on Pad A can be connected to the Tommy Lakes field via a proposed 20 km pipeline. Anuncio • Feb 07
Calima Energy Limited Announces Montney Test Program Update Calima Energy Limited announced the testing program on Calima #2 and #3 Montney wells commenced on 5 February 2023. Both wells are undergoing extended well tests ("EWT") to determine flow rates from the Middle & Upper Montney. Anuncio • Feb 03
Calima Energy Limited Announces Liquid Rich Montney Test Program to Commence Calima Energy Limited announced the commencement of the testing program on Calima #2 and #3 long reach horizontal Montney wells that were drilled, frac'd and partially tested in 2019. The work program consists of an extended re-test of the flow rates of the Middle Montney Formation in Calima #2 as well as allow for a longer-term test on the Upper Montney in the Calima #3 well. The program also contemplates potential down-hole work. These tests will be conducted with sufficient volumes being produced to properly evaluate each of the zones. Testing of the Middle & Upper Montney may yield higher gas and condensate rates now that the load fluid has had ample time to leak off into the formation providing incremental reserves not currently recognized in the Resource Report. A successful program will de-risk the project as the Company progresses development funding. The work program will be funded from production cash flow from Brooks and Thorsby, where current production is at historical highs of over 4,700 boe/d. The Company's total resources as of 31 December 2021 were ~160.5 MMboe (2C) resources 1 including 45.6 MMboe of development ready resources which will be reclassified as 2P Reserves on funding being secured. In addition, the Company has prospective 2U resources of 126 MMboe. Success in the Q1-23 re-testing of both Upper and Middle Montney zones has potential to improve and add to these resources. Anuncio • Jan 10
Calima Energy Limited Announces Pisces #6 & #7 Wells Complete and Tie in and Are Both on Production Calima Energy Limited announced Pisces #6 & #7 wells (100% WI) have been completed and tied in and are both on production as of December 29, 2022. The two wells are in the process of cleaning up and are producing back the frac fluid introduced into the reservoir as part of the completion, however, they are already producing hydrocarbons at strong rates. It is expected that the wells will be fully cleaned up and producing at peak rates within 30 days of initial production. The 3 (2.5 net) recently drilled Sunburst wells (Gemini #10, #11, #12) are all on production and on average the fourth quarter Gemini program has achieved initial peak 30-day rates approximately 35% higher than budgeted type curves. Current total production from the three wells is approximately 420 boe/d (gross) and 370 boe/d (net). Current corporate production has recently increased to greater than 4,500 boe/d with the new wells coming on, and has continued at these levels throughout the first week of January. The company continue to monitor the new wells closely as they clean-up and it is determined how this initial flush production will decline. First quarter 2023 Program: The company has commenced a 2 well drilling campaign at Brooks for first quarter 2023. Two horizontal Glauconitic Formation wells (Pisces #8 & #9) (100%WI) will be drilled, with Pisces #8 having been spudded on January 6. Both Pisces wells will be drilled off the same pad, providing savings and efficiencies on drilling, fracture completion, and gas tie-in infrastructure. Each well is expected to take ~10 days to drill and completion operations will commence shortly after drilling. Both Pisces #8 and #9 are planned to have a 2,750m long horizontal section, which would be comparative to Pisces 2, the longest Glauconitic well drilled by Calima to date. Reservoir conditions, geology, and directional drilling factors will dictate if the wells reach the extended total depth. Both wells are expected to be completed and ready to be production tested in late February. These wells are a follow up to a successful well drilled by the Company (12-23) which peaked at 217 boe/d (30- day average) and has cumulatively produced over 132,000 boe since it came on production in 2020. Pisces #8 and #9 are planned to be ~15% longer with ~60% more fracs than the 12-23 well resulting in anticipated higher production and reserve expectations for each of the wells.