Stock Analysis

Are Investors Undervaluing Shanghai Tunnel Engineering Co., Ltd. (SHSE:600820) By 26%?

Published
SHSE:600820

Key Insights

  • Using the 2 Stage Free Cash Flow to Equity, Shanghai Tunnel Engineering fair value estimate is CN¥9.79
  • Current share price of CN¥7.23 suggests Shanghai Tunnel Engineering is potentially 26% undervalued
  • The CN¥9.52 analyst price target for 600820 is 2.8% less than our estimate of fair value

Does the December share price for Shanghai Tunnel Engineering Co., Ltd. (SHSE:600820) reflect what it's really worth? Today, we will estimate the stock's intrinsic value by estimating the company's future cash flows and discounting them to their present value. We will take advantage of the Discounted Cash Flow (DCF) model for this purpose. There's really not all that much to it, even though it might appear quite complex.

Remember though, that there are many ways to estimate a company's value, and a DCF is just one method. For those who are keen learners of equity analysis, the Simply Wall St analysis model here may be something of interest to you.

Check out our latest analysis for Shanghai Tunnel Engineering

Crunching The Numbers

We are going to use a two-stage DCF model, which, as the name states, takes into account two stages of growth. The first stage is generally a higher growth period which levels off heading towards the terminal value, captured in the second 'steady growth' period. To begin with, we have to get estimates of the next ten years of cash flows. Seeing as no analyst estimates of free cash flow are available to us, we have extrapolate the previous free cash flow (FCF) from the company's last reported value. We assume companies with shrinking free cash flow will slow their rate of shrinkage, and that companies with growing free cash flow will see their growth rate slow, over this period. We do this to reflect that growth tends to slow more in the early years than it does in later years.

Generally we assume that a dollar today is more valuable than a dollar in the future, and so the sum of these future cash flows is then discounted to today's value:

10-year free cash flow (FCF) estimate

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Levered FCF (CN¥, Millions) CN¥3.09b CN¥3.08b CN¥3.10b CN¥3.14b CN¥3.20b CN¥3.26b CN¥3.34b CN¥3.42b CN¥3.51b CN¥3.60b
Growth Rate Estimate Source Est @ -1.52% Est @ -0.22% Est @ 0.69% Est @ 1.32% Est @ 1.76% Est @ 2.07% Est @ 2.29% Est @ 2.44% Est @ 2.55% Est @ 2.63%
Present Value (CN¥, Millions) Discounted @ 12% CN¥2.8k CN¥2.5k CN¥2.2k CN¥2.0k CN¥1.8k CN¥1.6k CN¥1.5k CN¥1.4k CN¥1.3k CN¥1.1k

("Est" = FCF growth rate estimated by Simply Wall St)
Present Value of 10-year Cash Flow (PVCF) = CN¥18b

We now need to calculate the Terminal Value, which accounts for all the future cash flows after this ten year period. For a number of reasons a very conservative growth rate is used that cannot exceed that of a country's GDP growth. In this case we have used the 5-year average of the 10-year government bond yield (2.8%) to estimate future growth. In the same way as with the 10-year 'growth' period, we discount future cash flows to today's value, using a cost of equity of 12%.

Terminal Value (TV)= FCF2034 × (1 + g) ÷ (r – g) = CN¥3.6b× (1 + 2.8%) ÷ (12%– 2.8%) = CN¥40b

Present Value of Terminal Value (PVTV)= TV / (1 + r)10= CN¥40b÷ ( 1 + 12%)10= CN¥13b

The total value is the sum of cash flows for the next ten years plus the discounted terminal value, which results in the Total Equity Value, which in this case is CN¥31b. In the final step we divide the equity value by the number of shares outstanding. Compared to the current share price of CN¥7.2, the company appears a touch undervalued at a 26% discount to where the stock price trades currently. The assumptions in any calculation have a big impact on the valuation, so it is better to view this as a rough estimate, not precise down to the last cent.

SHSE:600820 Discounted Cash Flow December 13th 2024

Important Assumptions

The calculation above is very dependent on two assumptions. The first is the discount rate and the other is the cash flows. Part of investing is coming up with your own evaluation of a company's future performance, so try the calculation yourself and check your own assumptions. The DCF also does not consider the possible cyclicality of an industry, or a company's future capital requirements, so it does not give a full picture of a company's potential performance. Given that we are looking at Shanghai Tunnel Engineering as potential shareholders, the cost of equity is used as the discount rate, rather than the cost of capital (or weighted average cost of capital, WACC) which accounts for debt. In this calculation we've used 12%, which is based on a levered beta of 1.870. Beta is a measure of a stock's volatility, compared to the market as a whole. We get our beta from the industry average beta of globally comparable companies, with an imposed limit between 0.8 and 2.0, which is a reasonable range for a stable business.

SWOT Analysis for Shanghai Tunnel Engineering

Strength
  • Debt is well covered by earnings.
  • Dividends are covered by earnings and cash flows.
  • Dividend is in the top 25% of dividend payers in the market.
Weakness
  • Earnings declined over the past year.
Opportunity
  • Annual earnings are forecast to grow for the next 3 years.
  • Good value based on P/E ratio and estimated fair value.
Threat
  • Debt is not well covered by operating cash flow.
  • Annual earnings are forecast to grow slower than the Chinese market.

Next Steps:

Valuation is only one side of the coin in terms of building your investment thesis, and it shouldn't be the only metric you look at when researching a company. DCF models are not the be-all and end-all of investment valuation. Rather it should be seen as a guide to "what assumptions need to be true for this stock to be under/overvalued?" If a company grows at a different rate, or if its cost of equity or risk free rate changes sharply, the output can look very different. Can we work out why the company is trading at a discount to intrinsic value? For Shanghai Tunnel Engineering, we've put together three important factors you should look at:

  1. Risks: For example, we've discovered 2 warning signs for Shanghai Tunnel Engineering (1 can't be ignored!) that you should be aware of before investing here.
  2. Future Earnings: How does 600820's growth rate compare to its peers and the wider market? Dig deeper into the analyst consensus number for the upcoming years by interacting with our free analyst growth expectation chart.
  3. Other Solid Businesses: Low debt, high returns on equity and good past performance are fundamental to a strong business. Why not explore our interactive list of stocks with solid business fundamentals to see if there are other companies you may not have considered!

PS. Simply Wall St updates its DCF calculation for every Chinese stock every day, so if you want to find the intrinsic value of any other stock just search here.

New: Manage All Your Stock Portfolios in One Place

We've created the ultimate portfolio companion for stock investors, and it's free.

• Connect an unlimited number of Portfolios and see your total in one currency
• Be alerted to new Warning Signs or Risks via email or mobile
• Track the Fair Value of your stocks

Try a Demo Portfolio for Free

Have feedback on this article? Concerned about the content? Get in touch with us directly. Alternatively, email editorial-team (at) simplywallst.com.

This article by Simply Wall St is general in nature. We provide commentary based on historical data and analyst forecasts only using an unbiased methodology and our articles are not intended to be financial advice. It does not constitute a recommendation to buy or sell any stock, and does not take account of your objectives, or your financial situation. We aim to bring you long-term focused analysis driven by fundamental data. Note that our analysis may not factor in the latest price-sensitive company announcements or qualitative material. Simply Wall St has no position in any stocks mentioned.